Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
12 Feb 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL 0 5.69 6.25 6.14 6.22 6.32 5.46 7.47 10.8 14.45 15.28 17.14 17.42 16.81 14.44 12.38 13.36 12.1 3.96 8.02 9.44 8.94 7.9 7.2 7.19 3.96 10.0158333333333 None
12 Feb 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL 0 10.27 11.34 12.97 12.85 14.16 12.82 12.62 12.56 15.3 16.88 18.35 22.37 16.9 16.65 11.77 18.24 17.76 15.93 13.04 12.04 11.14 15.32 17.08 17.14 10.27 14.8125 None
12 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
12 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL 0 9.77 12.78 12.73 18.1 19.11 9.96 11.88 21.06 17.28 18.56 19.6 19.98 19.57 20.43 19.6 20.54 13.41 19.1 17.71 20.86 19.46 18.18 17.14 18.05 9.77 17.2858333333333 None
12 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
12 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL 0 13.1 12 11.4 11 11.4 12.4 12.7 INST O/C INST O/C INST O/C INST O/C INST O/C INST O/C 10.5 9.7 9.2 9.2 12.7 14.3 12 11.9 14 13.2 14.1 9.2 11.9333333333333 None
12 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL 0 17.8 16.4 15.6 15 15.1 14.5 14.5 14.4 14.6 14.9 15.3 15.4 15.9 16.3 16.4 16.7 10.2 10.6 11.6 14 13.4 12 4.9 9.8 4.9 13.9708333333333 None
12 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
12 Feb 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
12 Feb 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — 0 I/S I/S I/S I/S I/S I/S I/S I/S 0.33 0.4 0.31 I/S I/S 0.28 0.28 0.32 I/S I/S I/S I/S I/S I/S I/S I/S 0.28 0.32 None
12 Feb 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL 0 1.62 1.5 1.42 1.3 1.4 1.4 1.4 1.1 0.96 0.96 0.95 0.96 0.95 1.01 1.1 1.1 0.15 1.2 1.43 1.56 1.74 1.7 1.76 1.6 0.15 1.26125 None
12 Feb 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 9.1 8.7 8.35 8.15 8.7 9.25 10.65 12.55 L/S 13.15 13.8 15.4 15.4 11.5 11.6 12.5 10.1 8.6 L/S L/S L/S L/S 10.75 10.3 8.15 10.9763157894737 None
12 Feb 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 5.55 5.6 5.5 5.4 5.15 5.55 6.7 7.75 10.7 l/s L/S L/S 11.95 12.15 12.45 12 11.2 9.5 7.45 7.5 8.15 7.8 6.75 6.75 5.15 8.16904761904762 None
12 Feb 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC 4.25 5.9 5.45 5.2 5.3 5.65 5.8 4.9 5 4.9 L/S L/S 5.3 5.4 5.55 5.25 5.65 5.65 5.85 6.75 6.85 6.9 L/S L/S 4.25 5.575 None
12 Feb 2026 None 132KV APO TS TR1 60MVA 33KV FDR H15 132KV APO TS_33KV FDR H15_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 None
12 Feb 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H2 132KV APO TS_33KV FDR H2_PL_PL AEDC 4.6 4.35 4.1 4.1 4.15 4.4 4.55 4.7 5.55 5.9 5.4 5.8 5.85 5.9 5.9 4.9 4.5 4.1 5 5.5 5.4 5.65 L/.S L/.S 4.1 5.01363636363636 None
12 Feb 2026 None 132KV SULEJA TS TR3- 30MVA 33KV FDR H21 132KV APO TS_33KV FDR H21_PL_PL AEDC 4.6 4.45 4.55 4.45 LS/T LS/T LS/T LS/T 5 LS/G LS/G LS/G LS/G LS/G 5.5 5 8.2 8.25 8.5 LS/G LS/G LS/G LS/G LS/G 4.45 5.85 None
12 Feb 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H21 132KV APO TS_33KV FDR H21_PL_PL AEDC 10.6 15.4 14.75 14.2 14.05 10.3 8.2 11.2 13.3 2.85 9.45 14.85 L/S L/S L/S 16.8 7.6 14.8 15.4 10.65 7 L/S L/S L/S 2.85 11.7444444444444 None
12 Feb 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H23 132KV APO TS_33KV FDR H23_PL_PL AEDC 11.4 10.8 10.4 7.6 8 8.4 8 7.4 8.8 13.6 10 10.4 10.6 15 14.6 13.7 12.8 8.7 9 9.5 9.4 9.3 9.1 10.5 7.4 10.2916666666667 None
12 Feb 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H3 132KV APO TS_33KV FDR H3_PL_PL AEDC 12.95 13.05 12.7 12.2 12 13 13.75 14.75 19.2 19.8 19.15 19.7 18.8 15 13.6 L/S 4.65 20.15 L/S L/S 17.5 19.3 17.8 17.3 4.65 15.5404761904762 None
12 Feb 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H31 132KV APO TS_33KV FDR H31_PL_PL AEDC 9.65 8.85 8.7 8.35 0.84 0.7 0.7 0.7 11.2 8.4 L/S L/S L/S 10 11 10.8 10.05 10.3 11.3 11.05 10.8 L/S L/S L/S 0.7 7.96611111111111 None
12 Feb 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC INST. EF INST. EF INST. EF INST. EF INST. EF INST. EF INST. EF INST. EF INST. EF 21 17.5 16.75 15.7 L/S L/S L/S L/S L/S L/S L/S L/S 26.6 26.85 25.6 15.7 21.4285714285714 None
12 Feb 2026 None 132KV KUBWA TS TR1- 60MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 16.2 15.4 LS/G LS/G LS/G LS/G LS/G LS/G 14.6 13.6 13.5 LS/G LS/G 15.8 14.9 13.9 14.6 LS/G 15.9 LS/G LS/G 15.1 16.7 18 13.5 15.2461538461538 None
12 Feb 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 3.25 8.6 8.15 7.85 8 8.95 8.85 7.75 7.55 L/S L/S L/S L/S 3.7 3.8 7 8.75 9.2 8.3 10.3 11.2 10.1 9.5 9.3 3.25 8.005 None
12 Feb 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 6.8 6.2 5.85 5.5 1.55 1.6 1.6 1.4 5.6 4.9 4.6 4.5 4.5 4.7 4.7 4.85 4.8 5.35 6.7 6.55 7.15 7.3 6.8 6.7 1.4 5.00833333333333 None
12 Feb 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 14.05 13.4 12.65 12.25 12.35 13.55 14.1 12.8 14.6 12 9.85 10.6 11.2 15.1 11.5 11.5 7.45 8.6 15.55 14.2 14.6 14.95 13.9 13.6 7.45 12.68125 None
12 Feb 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.8 1.65 1.8 1.5 1.8 1.1 1.6 1.85 2.15 1.95 2.45 2.55 2.55 2.3 2.45 0.9 2.45 1.95 2.15 0.05 0.05 1.95 1.85 1.9 0.05 1.78125 None
12 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC 14.2 13.4 12.7 13.1 13.8 15.7 13.9 12.2 11.8 11.5 11.3 11.4 11.3 11.3 11.9 6.5 LS/D LS/D LS/D LNTRIP INST.OC/EF INST.OC/EF INST.OC/EF INST.OC/EF 6.5 12.25 None
12 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC LS/G LS/G 16.8 21.6 LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G 16.8 19.2 None
12 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D 17.3 19.6 18.4 17 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 21.8 LS/D 20.4 O/C O/C O/C 17 19.0833333333333 None
12 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC 7.1 6.5 6.1 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 7.5 7.4 LS/D LS/D LS/D LNTRIP INST.OC/EF INST.OC/EF INST.OC/EF INST.OC/EF 6.1 6.92 None
12 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 11.1 13.6 9.6 13.7 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 12.7 11.1 14.4 9.6 12.3142857142857 None
12 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC LS/D LS/D LS/D 15.9 16.9 19.6 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 20.8 21.5 LS/D LS/D LS/D LS/D LS/D LS/D 15.9 18.94 None
12 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC 10 9.2 8.8 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 10.9 9.9 LS/D 10.9 LS/D LS/D LS/D LS/D LS/D LS/D 11.2 10.5 8.8 10.175 None
12 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC O/C O/C O/C O/C O/C O/C 14.7 13.7 11.9 14.5 13.3 12.3 INST.EF INST.EF 17.7 17.7 18.2 19.1 O/C O/C 15.9 15.4 13 11.8 11.8 14.9428571428571 None
12 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 15.5 14.7 14.1 14 14.6 10.8 11.4 10.6 10.6 LS/D LS/D LS/D 11.2 11.5 3.8 6.2 6.4 6.4 4.2 LS/D LS/D LS/D LS/D 9.7 3.8 10.3352941176471 None
12 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC O/C O/C 16 14.8 15 16.6 17.1 15 14.3 13.7 13.2 13 INST.EF INST.EF 14.4 14.4 15 15 LS/D LS/D LS/D LS/D LS/D LS/D 13 14.8214285714286 None
12 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC LS/D LS/D 9.5 9.5 11.1 13.3 14.2 LS/D LS/D 1.8 2.9 3.4 2.7 2.7 2.7 2.2 I/S I/S 2.6 LS/D LS/D LS/D LS/D LS/D 1.8 6.04615384615385 None
12 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 5 4.6 4.4 4.2 4.2 4.4 4.4 4.1 3.9 3.8 4.4 4.4 4.8 4.7 4.7 4.8 5.4 5.4 5.6 5.6 5.8 5.6 5.4 5.4 3.8 4.79166666666667 None
12 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
12 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 13.2 12.5 12 11.6 11.4 11.5 11.7 12 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 8.5 14.3 14.9 14.9 13.7 8.5 12.4769230769231 None
12 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 14.5 13.7 9.3 9.2 9.6 2.5 7.5 2.5 7.1 8.9 10.2 10.3 EF/OC EF/OC 2.9 E/F E/F 2.5 10.7 8.7 10.6 9.8 9 2.7 2.5 8.11 None
12 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 4.4 4.5 4.7 4.9 5.7 4.9 4.3 5.4 5.3 5.7 5.1 5.3 MTCE MTCE MTCE MTCE MTCE MTCE MTCE 4.1 5.4 5.4 5.1 4.9 4.1 5.00588235294118 None
12 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 3.3 3.2 3.2 3.2 3.5 4.2 3.2 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 1.4 1.3 4.6 3.2 2.9 2.6 2.5 1.3 3.02142857142857 None
12 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 13.6 12.9 12.4 11.9 12.3 13.4 10.1 10.9 12 10 11.9 14.1 MTCE MTCE MTCE MTCE MTCE MTCE MTCE 10 O/C 16.7 16.7 15.5 10 12.775 None
12 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
12 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 1.6 1.5 1.45 1.4 1.6 1.65 1.7 1.6 1.5 1.6 1.9 1.9 1.05 1.85 1.1 5 8.25 1.3 8.5 8.85 8.5 5 LS/G LS/G 1.05 3.12727272727273 None
12 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.25 0.25 0.25 0.25 0.25 0.25 0.2 0.25 0.25 0.25 0.25 0.25 0.25 LS/G LS/G 0.15 0.206818181818182 None
12 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 3.8 3.6 3.5 3.5 3.7 4.4 4.5 4 4.2 4.3 E/F E/F E/F E/F 5.1 5.3 5.1 5 E/F E/F E/F E/F E/F E/F 3.5 4.28571428571429 None
12 Feb 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL 0 L/S 11.7 14.2 12.8 0 13.1 13 11.9 11.6 11.6 11.9 11.6 11.9 L/S 13.2 13.1 12.6 L/S L/S 18.3 17.8 16.9 16.6 10 0 12.69 None
12 Feb 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 2 2 2 2.3 2.8 3.7 5.6 5.4 3.8 3.4 3.3 3.3 3.7 3.8 4.2 6.4 10.2 1.8 12 14.3 10.4 4.2 4 3.9 1.8 4.9375 None
12 Feb 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 0.95 0.85 0.75 1 1.65 1.5 1.4 1.95 2.1 1.9 2.15 1.9 1.5 1.9 2.25 2.4 2.1 1.5 1.65 2.25 2.45 2.2 LS/G LS/G 4.8 1.74090909090909 None
12 Feb 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 7.1 7.1 8.5 8.1 8.2 8.3 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 7.1 7.88333333333333 None
12 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL 0 16.48 14.7 13.8 13.6 L/S L/S L/S 7.8 17 L/S L/S 17.2 17 15.1 S/G S/G S/G 17.7 18.8 18.4 18.1 L/S L/S 17.3 7.8 15.9271428571429 None
12 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC LS/G 17.3 17 16.8 16.7 19 LS/G LS/G 5.6 4.6 4.6 4.4 4.4 17 17.6 17.2 LS/G LS/G LS/G LS/G LS/G 21.5 LS/G LS/G 4.4 13.1214285714286 None
12 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC 2.25 2.55 2.5 2.4 LS/T LS/T LS/T LS/T 5 4 4 LS/G LS/G LS/G LS/G LS/G LS/G 9.35 10 I/S I/S 6 LS/G LS/G 2.25 4.805 None
12 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 4.9 4.7 4.4 4.5 4 4.6 2.9 LS/D LS/D LS/D LS/D 7 8.4 6.8 3 3 3 3 LS/D LS/D LS/D LS/D LS/D LS/D 2.9 4.58571428571428 None
12 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 10.6 9.7 9.1 8.75 9.3 9.7 5.5 4.7 4.5 LS/G LS/G E/F E/F E/F E/F 5.3 10.4 10.6 10.1 11.4 11.4 10.2 10.7 6.3 4.5 8.79166666666667 None
12 Feb 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 2 1.9 1.7 1.7 2 2.1 1.2 I/S I/S I/S I/S I/S I/S I/S I/S 1 3 2.9 2.9 LNTRIP I/S I/S 1.2 1 1 1.89230769230769 None
12 Feb 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL 0 L/S 9.5 12.5 11.2 10.8 11 10.9 8.8 8.5 8.9 8.9 8.9 9 9.6 9.5 9.5 10.3 10.7 12.6 L/S L/S 16.3 14.9 13.5 8.5 10.752380952381 None
12 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — 0 SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
12 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL None 1 0.9 0.9 0.9 0.9 1.1 1.2 1.2 1.1 1.1 1.1 1.2 1.3 1.3 1.6 1.5 1.4 1.5 1.5 INST. E/F, INST. O/C 1.3 1 1 0.9 0.9 1.1695652173913 None
12 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 2.4 2.2 2.2 2.2 2.3 2.6 2.7 2.2 2 2 2 2 2 2 2 2.2 0.6 0.7 0.7 0.7 0.7 2.9 2.7 2.4 0.6 1.93333333333333 None
12 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.4 0.5 0.4 0.6 0.6 0.7 0.6 0.7 0.5 0.6 0.5 0.5 LNTRIP 0.5 0.6 0.6 0.5 0.4 0.543478260869565 None
12 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 6.1 5.6 5.3 5.25 14.4 15.1 5.8 5.2 5 LS/G LS/G 5.4 5.5 9.6 9.5 9.3 5.6 6 6.8 11.7 12.2 7.4 6.8 6.4 5 7.725 None
12 Feb 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 2.9 2.9 3 3 3.1 8.5 10 0.7 0.6 4 4.8 4.9 4.8 INST. O/C 0.6 0.6 0.6 0.7 0.7 5.2 5.3 5 4.8 4.5 0.6 3.5304347826087 None
12 Feb 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC 0.3 0.3 0.3 0.3 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.5 0.5 0.5 9.5 0.5 0.5 6.2 6 E/F 0.3 2.11666666666667 None
12 Feb 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1.5 1.4 1.4 1.6 1.9 2.3 3.2 3.5 2.8 3 3.6 3.5 4 4.2 E/F 2.3 E/F E/F E/F 3 7.8 7.5 7.4 7.2 1.4 3.655 None
12 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 2.1 2.2 2.2 2.2 2.3 2.1 2 2.3 2.8 2 3.3 2.7 2.7 3 3.1 2.9 2.6 2.4 3.2 LNTRIP 2.2 4.1 4 4.2 2 2.72173913043478 None
12 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 4.7 4.5 4.5 4.55 4.9 5.1 5.5 5.1 6 6.5 6.75 8.7 12.6 12.5 10 6 8.1 I/S I/S I/S 9.5 8 LS/G LS/G 4.5 7.02631578947368 None
12 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
12 Feb 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2.1 2.7 2.6 2.5 2.7 2.5 3.4 3.3 3.3 3 3 3.1 3.1 3.2 2.2 2.4 LS/D LS/D LS/D LNTRIP 2 2.5 2.3 2 2 2.695 None
12 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL 0 22.39 20.5 19.2 18.6 18.4 19.4 21.5 24.7 29.1 28.6 30.1 27.1 28 27.01 S/G S/G S/G 27.6 29 22.5 20.8 25.3 24.3 24.4 18.4 24.2142857142857 None
12 Feb 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 0.5 0.5 0.5 0.5 0.5 0.7 0.9 1 0.3 0.1 0.1 0.1 0.7 0.8 0.7 0.7 0.7 0.9 1 0.9 0.8 0.7 0.6 0.6 0.1 0.616666666666667 None
12 Feb 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA 0.05 0.05 O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 0.1 0.1 0.1 2.2 2 NCL/A - 0.1 0.1875 None
12 Feb 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL 0.98 1.05 0.98 0.98 1.05 1.11 1.23 1.56 1.53 1.41 1.4 1.37 1.37 1.23 1.25 1.29 1.47 1.5 1.53 1.35 1.32 1.23 1.23 - nan nan None
12 Feb 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO TAMBUWAL FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
12 Feb 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 O/C 0.1 O/C O/C O/C O/C O/C O/C 0.7 0.9 1.4 0.1 1.3 0.1 0.329411764705882 None
12 Feb 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA 6 5.7 5.6 5.5 5.8 6.5 7.9 7.8 7.4 7.1 6.6 6 3 6 6 6.2 O/C O/C O/C O/C O/C O/C 8.2 - 3 4.30833333333333 None
12 Feb 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.2 0.2 0.2 0.3 0.2 0.3 0.1 0.1 0 0.1 0.1 0 0.1 0.1 0 0.1 0 0.1 0.1 0.1 0.4 0.3 0.3 - nan nan None
12 Feb 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 6 6 6 6 5 5 8 8 8 4 3 3 2 2 3 3 4 4 4 7 7 4 4 4 2 4.83333333333333 None
12 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 1.8 1.7 1.7 1.7 1.7 1.7 2 2 1.9 2.2 2.3 0.9 2.5 2.3 2.5 2.4 2.2 2.7 2.7 3.1 2.8 2.7 E/F E/F 0.9 2.15909090909091 None
12 Feb 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.02 0.02 0.02 EMR EMR EMR EMR EMR EMR EMR EMR SG 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 NCL/A - 0.02 0.00916666666666666 None
12 Feb 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA LSD LSD LSD LSD LSD LSD LSD EMR EMR EMR SG 2.3 2.2 2.3 2.2 2.2 LSD LSD LSD LSD LSD LSD NCL/A - 2.2 0.466666666666667 None
12 Feb 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA 2 1.9 1.8 1.8 2.1 NCL/A NC L/A NC L/A NC L/A O/C O/C O/C O/C O/C O/C 1.8 1.9 2 2.1 2.5 2.1 2.2 NCL/A - 1.8 0.929166666666667 None
12 Feb 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
12 Feb 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
12 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.3 0.3 0.3 0.3 0.2 0.1 0.6 0.6 0.8 1 1 1 0.9 0.3 1.5 1.4 1.5 1.3 1.5 1.3 0.9 0.3 0.3 0.9 0.1 0.775 None
12 Feb 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
12 Feb 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 7.9 7.6 7.4 7.5 8.2 9.1 0.1 0.1 0.1 0.1 0.1 9.6 9.6 0.1 0.1 0.1 0.1 0.1 0.1 0.1 10.8 LS/T LS/T LS/T 0.1 3.75714285714286 None
12 Feb 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 0.4 0.4 0.4 4.2 4.7 5.3 5.7 4.8 4.8 4.4 4.6 0.3 0.4 0.3 0.4 0.4 0.4 2.2 4.2 0.3 0.3 0.5 NCL/A - 0.3 2.025 None
12 Feb 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.5 0.5 0.5 0.4 0.5 0.7 0.7 E/F 0.9 0.8 0.8 0.7 0.4 0.9 0.8 0.8 0.9 0.8 0.7 0.6 0.5 NCL/A - 0.4 0.5375 None
12 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 14 13.8 13.8 5 5.6 6.3 0.2 0.3 0.2 1.7 1.6 3.2 3.3 12.7 10.6 7.5 7.3 1.7 0.2 6.8 1.3 8 7.4 - 0.2 4.64583333333333 None
12 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 10 4.7 4.7 6 0.5 3.8 0.5 0.5 0.5 0.7 0.7 0.8 0.8 0.8 0.8 6.8 0.7 0.7 0.7 6.8 0.6 6.3 5.7 - 0.5 2.07916666666667 None
12 Feb 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 4 4.3 4.4 4.3 4.3 0.2 0.2 0.2 0.2 0.2 6.2 5.8 6 2.8 2.8 2.8 3.1 3.8 0.5 0.3 0.4 0.3 0.3 - 0.2 2.05833333333333 None
12 Feb 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 3 2.8 2.8 2.8 2.8 1.2 0.3 0.3 0.3 0.3 3.3 0.4 0.7 1.5 1.8 1 1 1 1 E/F 0.4 1.3 3.8 - 0.3 1.2875 None
12 Feb 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 2.4 2.7 2.6 2.8 3.1 3.7 NCL/A NCL/A NCL/A 2.3 3.1 2.8 2.7 2.5 3.2 3.1 3.3 3.3 3.1 3 2.7 2.6 2.4 - 2.2 2.27083333333333 None
12 Feb 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 2.6 2.2 E/F E/F 2.2 2.4 3 3.7 4 4.1 4.2 3.8 E/F 3.8 3.9 3.5 3.5 3.3 3.2 E/F 3 3.3 3.4 - 2.2 2.42916666666667 None
12 Feb 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 10.76 10.55 10.33 10.11 10.88 10.42 11.42 9.61 8.97 8.32 11.55 8.72 11.55 8.9 9.18 9.59 8.77 9.15 9.85 10.87 10.87 10.08 11.71 - 8.32 9.25416666666667 None
12 Feb 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 4.25 4.09 3.42 3.82 E/F E/F E/F 3.32 3.62 3.29 6.22 6.25 5.99 5.88 5.69 6.05 6.19 6.16 6.25 6.02 5.59 5.21 2.42 - nan nan None
« Previous Page 195 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —