Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
15 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 9.1 9.5 9 8.5 8.4 8.4 8.2 7.4 7.4 10.6 10.3 10.3 10.3 LS/G LS/G LS/G LS/G 11.3 14.4 E/F E/F 9.3 12.4 11.1 7.4 9.772222222222222 None
15 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 17.8 16.8 15.6 14.6 14.4 14.4 14.1 13.6 14.6 12.2 15.1 15 15.4 14.9 16.3 12.3 INST. O/C INST.O/C LS/G INST O/C INST O/C INST O/C INST O/C 8.4 8.4 14.441176470588237 None
15 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
15 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
15 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.24 0.24 I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.24 0.24 None
15 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.8 1.65 1.56 1.46 1.4 1.4 1.4 1.2 1.09 1.15 1.14 1.1 1.11 1.15 1.2 1.09 1.25 1.32 1.65 INST O/C INST O/C INST O/C & E/F INST O/C & E/F INST O/C & E/F 1.09 1.3221052631578947 None
15 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 9.9 9.6 9 9.05 9.1 9.75 11.45 13.45 15.5 16.35 LS/D LS/D LS/D 16.4 17.9 16.15 14.1 12.2 11.6 TRANSFOMER TRIP INST.EF INST.EF INST.EF INST.EF 9 12.59375 None
15 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 6.75 6.5 6.15 5.95 5.9 6.8 8 9.55 10.9 11.4 12.7 13.1 6.3 9.75 11.6 13.3 11.55 9.55 7.85 INST. OC 0.15 INST.EF/OC. 2.85 6.8 0.15 8.336363636363638 None
15 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S INST. OC I/S I/S I/S I/S 0 nan None
15 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H15 132KV APO TS_33KV FDR H15_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 INST.OC/EF. INST.OC/EF. INST. OC 0.1 0.1 0.1 0.10000000000000002 None
15 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H2 132KV APO TS_33KV FDR H2_PL_PL AEDC 4.9 4.75 4.5 4.3 4.25 4.4 4.4 4.85 4.5 6.05 6.3 6.5 6.5 4.55 5.45 5.5 5.3 5 0.2 INST. EF 1.65 4.45 4.3 4 0.2 4.634782608695652 None
15 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H21 132KV APO TS_33KV FDR H21_PL_PL AEDC LS/G LS/G 14.85 19.25 18.6 14.85 14.6 13.4 12.8 12.95 9.8 10 9.95 16.2 LS/D LS/D LS/D LS/D 9.95 TRANSFOMER TRIP DISCO EMRG 6.6 12.2 16.9 6.6 13.306249999999997 None
15 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H23 132KV APO TS_33KV FDR H23_PL_PL AEDC 11 12.2 11.4 8 8 8.2 8.4 9.4 11 14.4 17.2 17.4 17.9 18.6 17.6 17.9 16.2 9.5 11.2 TRANSFOMER TRIP DISCO EMRG INST. OC INST. OC INST. OC 8 12.921052631578947 None
15 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H3 132KV APO TS_33KV FDR H3_PL_PL AEDC LS/G LS/G 12.8 12.2 11.75 12 12.8 14.2 16.3 16.8 17.05 19.2 19.2 LS/D 13.25 19.9 LS/D 14.4 10.45 INST. OC INST. OC INST. OC INST. OC INST. OC 10.45 14.819999999999999 None
15 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H31 132KV APO TS_33KV FDR H31_PL_PL AEDC 17.1 16.3 15.6 15.15 14.75 15.2 15.7 15.65 16.35 16.75 16.55 16.6 15.2 16.45 17.3 17.3 15.8 16 INST. EF INST. EF INST. EF INST. EF INST. EF INST. EF 14.75 16.09722222222222 None
15 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC 25.65 LS/G LS/G LS/G 25.6 24.65 24.35 23.35 LS/D LS/D LS/D LS/D 13.9 13.8 13.7 13.5 13.55 10.6 INST. EF INST. EF INST. EF INST. EF INST. OC INST. OC 10.6 18.422727272727272 None
15 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 5.2 5 4.8 1.65 1.6 1.5 4.65 6 5.8 8.35 7.95 8 7.9 7.5 6.8 8.4 8.7 LS/D 5.2 INST. EF INST. EF INST. EF INST. EF 3.75 1.5 5.723684210526317 None
15 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 7.05 6.6 6.2 5.85 5.65 5.7 5.5 5.1 5.05 4.8 4.9 4.9 4.9 4.55 5 4.5 5.2 5.5 6.65 3.25 3 3.4 3.3 3.15 3 4.987500000000001 None
15 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 18.05 17.1 16.7 16.25 13.7 14.45 14.95 16.1 17.7 18.6 18.6 18.6 19.8 19.9 19.7 19.4 18.05 16.9 17.05 15.8 18.2 17.95 18.05 17.1 13.7 17.445833333333333 None
15 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.75 1.95 2 1.3 1.75 1.9 2 2.05 1.8 1.5 1.5 0.4 1.75 1.55 2.4 2.5 2.45 2.45 1.2 0.85 1.4 1.85 2.05 2.05 0.4 1.7666666666666666 None
15 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC LS/D LS/D 11.8 11 10.8 14.3 13.5 13.5 13.4 7 9.9 9.4 9.7 6.9 6.9 7.1 7.4 8.1 E/F E/F 11 9.8 8.9 8 6.9 9.920000000000002 None
15 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC 18.6 17.2 LS/D 17 LS/D LS/D LS/D 19.6 18.2 17.3 16.6 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 16.6 17.785714285714285 None
15 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC LS/D LS/D LS/D LS/D 7.9 7.8 7.3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D E/F INST/O/C INST/O/C 7.9 7 7 7.58 None
15 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC LS/D LS/D LS/D LS/D INST.O/C INST.O/C INST.O/C INST.O/C INST.O/C INST.O/C SG SG LS/D LS/D 15.8 15 13.3 8.4 3.7 INST E/F 4.1 6.7 8.3 7.5 3.7 9.2 None
15 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC 16.7 15.7 15.1 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 19.6 18.3 17.7 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 15.1 17.183333333333334 None
15 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC LS/D LS/D LS/D LS/D 12.6 12.6 12.1 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 12.3 14.1 10.9 9.9 9.1 9.1 11.7 None
15 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC LS/D LS/D LS/D 15.5 14 13.3 12.4 11.8 11.2 10.5 10.5 LS/D LS/D LS/D LS/D LS/D LS/D 12.9 14.1 INST. E/F INST. E/F INST. E/F 16.2 13.1 10.5 12.958333333333334 None
15 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 6.9 14.2 13.8 14.3 19.2 19.2 14.9 E/F E/F E/F E/F 14.5 6.9 14.625000000000002 None
15 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC OC OC OC 16.2 15 15.3 15.7 15.1 14.3 9.1 LS/G LS/G LS/G LS/G LS/G LS/G O/C O/C O/C O/C O/C O/C 16.5 15.4 9.1 14.733333333333333 None
15 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C I/S I/S I/S I/S I/S I/S 15.9 E/F E/F E/F E/F E/F 15.9 15.9 None
15 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 5.3 5.2 5.1 4.6 4.8 4.3 4.4 4.3 4.5 4.4 4.8 4.4 4.4 4.4 4.5 4.6 4.4 4.5 5.3 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 4.3 4.6421052631578945 None
15 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
15 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 14 13.3 12.7 12.2 11.5 11.8 11.1 11.6 13.9 14.3 14.8 14.3 15.2 14.4 LS/G LS/G LS/G 15.5 15.8 INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C 11.1 13.525 None
15 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 15.4 14.8 E/F E/F E/F E/F 17.9 17.8 17.6 11.7 11.7 8.7 8.6 8.7 3.7 10.4 3.4 3.2 3.6 3.7 E/F E/F E/F 8.7 3.2 9.976470588235292 None
15 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 4.3 4 3.6 2.9 2.9 2.4 2.9 4.3 LS/D LS/D LS/D 3.6 3 4.3 3.2 3.1 5 4.5 5.3 INST. E/F INST. E/F INST. E/F 2.3 4.2 2.3 3.6555555555555554 None
15 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 3.2 3.1 3.1 3.1 3.2 3.6 3 3 3.1 3.4 I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 3 3.18 None
15 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 12.1 12.6 11.5 10.7 10.5 10.6 10.7 12 LS/D LS/D LS/D 14.8 16.1 INST. E/F 15.6 15.3 16.3 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. OC/EF INST. OC/EF 10.5 12.984615384615385 None
15 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
15 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.25 0.25 0.4 0.35 0.25 0.2 0.15 0.2 0.2 0.2 0.2 0.15 0.2 0.15 0.2208333333333334 None
15 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 1.7 1.6 1.7 1.6 1.65 1.8 1.7 1.7 1.75 1.6 2.1 2.2 2 2.25 4.5 8.75 7.95 2.05 2.15 2.35 INST.OC/EF 2 1.85 1.7 1.6 2.5500000000000003 None
15 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 4.4 O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 4.8 5 5 5.2 5.1 5 E/E E/E E/F E/F E/F E/F 4.4 4.928571428571429 None
15 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 15.7 14.6 13.52 12.8 12.5 12.5 13 12.7 12.7 11.5 L/S L/S 12.7 12.4 12.55 14.2 14.3 13.9 LS/D LS/D LS/D LS/D INST. E/F INST. E/F 11.5 13.223125 None
15 Apr 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 5 5.1 5.1 5.2 5.2 6.3 7 7.1 7.1 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.5 2.5 2.5 5.281818181818182 None
15 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 1.9 1.75 1.8 1.7 1.85 1.35 1.25 1.7 2.05 2.15 2.2 2 1.85 1.95 2.1 INST.E/F INST.E/F 1.2 1.5 INST.E/F INST.E/F 1.6 1.85 1.85 1.2 1.78 None
15 Apr 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC 5.4 5.4 O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 4.2 4.2 4.2 3.8 3.7 3.5 3.5 4.3 None
15 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 18.4 16.3 15 14.2 14.1 14.6 L/S L/S 18.7 15.55 15.05 13.45 12.2 12.7 13.65 E/F E/F E/F 17.6 INST.O/C&E/F INST.O/C&E/F INST.O/C&E/F INST.O/C&E/F INST.O/C&E/F 12.2 15.107142857142856 None
15 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 18.2 18 16.8 16.5 16.5 17.3 18.4 18 LS/D 14 LS/G 17.5 17.5 17.1 18 18 INST. E/F 17.5 19 INST. E/F INST. E/F INST. O/C 6.5 5.6 5.6 16.133333333333333 None
15 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC 2.9 2.8 2.6 3.3 LS/G LS/G 4.25 3.9 5.7 5.8 4 LS/D LS/D LS/D LS/D LS/D INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F I/S I/S I/S 2.6 3.9166666666666665 None
15 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC 7.4 LS/G LS/G LS/G LS/G LS/G LS/G LS/G 12.5 12.25 5 8 9.6 8.5 5 7.5 11.2 14.45 15.6 INST.E/F INST.E/F INST.E/F LS/D LS/D 5 9.75 None
15 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 7.1 6.8 6.8 6.8 6.6 6.8 2.3 2.9 2.9 4.7 3 2.9 5.6 5.2 5.2 5.1 2.9 5 E/E E/E E/F E/F E/F E/F 2.3 4.922222222222222 None
15 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 9.75 LS/G LS/G 13.1 12.25 11.25 4.4 4.1 4.55 3.65 8.6 10 9.9 10.3 LS/D LS/D LS/D O/C &E/F O/C &E/F O/C &E/F O/C &E/F O/C &E/F 8.5 9.1 3.65 8.532142857142857 None
15 Apr 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 2.5 2.4 2.3 2.3 2.3 2.3 2.4 I/S I/S I/S I/S I/S I/S I/S 1.5 1.4 1.4 O/C O/C O/C O/C O/C O/C O/C 1.4 2.0799999999999996 None
15 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 12.6 12.1 11.3 10.7 10.3 10.5 10.1 9.5 L/S L/S 8.95 9.25 9 8.85 8.55 9.8 INST. O/C 1.3 13.8 INST. E/F INST. E/F INST. E/F INST. E/F 12.4 1.3 9.941176470588237 None
15 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
15 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 1.1 1.1 1.1 1 1 1.1 1.2 1.4 1.4 1.4 1.5 1.4 1.5 1.6 1.5 1.6 1.5 1.5 1.6 INST. O/C INST. O/C 1.4 1.3 1.2 1 1.3363636363636366 None
15 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 1.9 1.8 1.7 1.7 1.7 1.8 1.8 1.7 1.6 1.2 1.2 1.2 1.2 0.5 1.4 1.5 1.5 1.5 2.2 INST. E/F INST. E/F 1.3 1.3 2.3 0.5 1.5454545454545454 None
15 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.6 0.6 0.6 0.6 0.4 0.5 10.6 10.9 10.3 9 9.5 6.1 0.6 0.7 0.6 0.7 0.6 0.6 E/E 0.6 0.5 0.6 0.5 0.5 0.4 2.8782608695652177 None
15 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 10.85 10.05 9.5 9.1 LS/G LS/G 6.6 5.7 5.95 10.3 10.05 9.8 8.6 10.2 10.2 10.05 9 10.35 16.25 E/F E/F E/F 7.55 12.2 5.7 9.594736842105263 None
15 Apr 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 3.6 3.7 3.6 3.3 3.6 0.7 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.7 INST.O/C INST.O/C INST.O/C 0.7 0.8 3.1 4 3.6 3.3 3.4 0.5 1.9904761904761903 None
15 Apr 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.7 2.6 E/F E/F E/F 3.3 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 2.6 2.866666666666667 None
15 Apr 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1.4 1.4 1.4 1.4 1.5 2.5 2 1.8 2.6 7.6 7.7 7.7 6.1 6.1 6.1 2 2 2 2.6 2.5 2 1.7 1.3 1.2 1.2 3.108333333333334 None
15 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 2.2 2.1 2.1 2.1 1.9 1.9 3.2 3.3 3.6 3.8 4.2 4.5 4.1 4.3 4.3 3.4 3.7 1.9 E/E E/E E/F E/F 0.7 1.7 0.7 2.95 None
15 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 7.5 7.25 7.15 7.15 7.25 7.7 7.7 6.8 6.4 6.3 7.5 8.05 11.5 10 6.5 7.7 I/S I/S I/S I/S INST.E/F 6.55 12.05 11.6 6.3 8.034210526315789 None
15 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 E/F E/F E/F E/E E/E E/F E/F E/F E/F 0.1 0.10000000000000002 None
15 Apr 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2.2 LS/D LS/D LS/D LS/D 0.6 2.5 2.1 2.3 2.1 2 2 3 3 3.2 2.7 3.2 2.7 1.7 2.2 2.3 2.3 1.8 2 0.6 2.2949999999999995 None
15 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 23 22.16 20.8 20.19 20.04 20.79 22.4 25.3 28.7 27 23.15 26.7 26.3 26.65 24.05 26.3 30.5 30.2 24.9 25.5 16.4 16.68 16.22 21.4 16.22 23.555416666666662 None
15 Apr 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 0.7 0.7 0.7 0.8 0.9 1.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.7 0.8 0.8 0.1 0.3666666666666664 None
15 Apr 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA LSG/S LSG/S LSG/S LSG/S LSG/S 1.7 LSG/S LSG/S E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.05 0.05 E/F E/F E/F E/F - 0.05 0.075 None
15 Apr 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL D/S D/S D/S D/S D/S D/S DS DS 1.44 1.38 1.44 1.44 1.2 1.44 LSD LSD LSD LSD 1.5 1.55 1.44 1.44 1.44 - 1.05 0.6983333333333333 None
15 Apr 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO ARGUNGU FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
15 Apr 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
15 Apr 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA 5 5.5 5 4.6 6 7.3 8.2 6.7 6.2 7.1 E/F E/F E/F E/F E/F 10.3 E/F E/F 7.4 8 10 9 12 - 4.6 4.929166666666667 None
15 Apr 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.2 0.1 3.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.4 0.4 - 0 0.2999999999999999 None
15 Apr 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 8 8 8 8 6 8 8 6 4 4 4 4 4 4 6 6 8 8 8 8 8 4 4 4 4 6.166666666666667 None
15 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 1.1 1.1 1 L/S L/S L/S L/S L/S L/S L/S 1.3 1.2 1.2 1.2 1.2 EF EF EF EF EF EF EF EF EF 1 1.1624999999999999 None
15 Apr 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 O/C O/C 0.04 0.04 - 0.04 0.036666666666666674 None
15 Apr 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA LSD LSD LSD LSD LSD LSD LSD LSD 6.5 6.2 6.2 6 5.6 LSD LSD LSD LSD LSD 5.3 O/C O/C O/C O/C - 5.3 1.4916666666666665 None
15 Apr 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA L/S(G/S) L/S(G/S) L/S(G/S) L/S(G/S) L/S(G/S) 2.1 2 2 1.9 2.2 NCL/A 1.9 1.6 LSD LSD LSD 2 DS DS DS 3.1 2.8 2.6 - 1.6 1.1041666666666667 None
15 Apr 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
15 Apr 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
15 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.6 0.6 0.5 0.5 0.5 0.3 0.2 1.1 1 1.1 1.3 1.3 1.2 0.4 0.5 1.1 1.1 1 1.3 1.2 0.8 0.6 0.9 0.8 0.2 0.8291666666666667 None
15 Apr 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
15 Apr 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 8 7.8 7.7 8.2 9 10 0.1 0.1 0.1 0.1 0.1 8.9 8.8 0.1 0.1 0.1 0.1 0.1 0.1 0.1 10.2 9.6 E/F E/F 0.1 4.063636363636362 None
15 Apr 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 0.7 0.7 0.5 0.5 0.5 5.9 6.2 5.6 0.6 0.6 NCL/A NCL/A NCL/A 4.8 5.8 5.7 5.4 0.7 0.7 E/F E/F 0.7 E/F - 0.5 1.9000000000000006 None
15 Apr 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.4 0.4 0.4 EF/OC EF/OC EF/OC 0.3 0.3 0.3 1 1 1 LSD 1 1.1 1.1 0.9 0.8 0.6 0.5 EF/OC 0.5 - 0.3 0.5166666666666667 None
15 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 15 16.6 16 5.4 0.3 0.3 6.5 5.8 7.3 2.6 7.5 8.1 9.5 8.4 8.5 7.5 12 11.6 6.4 6 6 2 7 - 0.3 7.845833333333332 None
15 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 7.3 0.6 0.7 0.6 0.7 6.7 6.8 6 6.3 6.3 6.3 6.5 1.1 8.9 8.5 8.3 6.3 6.5 0.93 9 9 8.4 8 - 0.6 5.697083333333334 None
15 Apr 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 4.5 4.4 0.2 0.2 0.2 0.2 6.2 6 6 5.5 E/F 4.3 6.3 - 0.2 2.2166666666666663 None
15 Apr 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 2.8 2.8 2.6 2.7 3 3.2 0.4 0.4 0.4 0.4 3.3 3.5 1.4 1.5 1.7 0.2 0.2 1 0.9 0.6 0.2 4.5 4.3 - 0.2 1.9041666666666666 None
15 Apr 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 2.4 2.4 2.3 2.3 2.5 2.9 3.4 E/F 2.3 2.5 2.2 2.1 2.1 2.5 3.4 3.2 3.4 3.3 3.5 NCL/A NCL/A NCL/A NCL/A - 2.1 2.125 None
15 Apr 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 3.1 3 2.7 2.8 2.6 2.8 3.8 1.7 1.7 1.6 1.5 1.5 1.5 1.5 3 2.8 3 2.7 2.7 2.7 2.7 2.5 2.4 - 1.5 2.4333333333333336 None
15 Apr 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 11.09 9.53 9.71 9.56 9.71 11.63 11.04 5.93 8.22 5.68 8.03 5.92 9.28 9.46 10.8 6.2 9.72 9.93 6.99 6.86 6.39 8.52 9.72 - 5.68 8.72916666666667 None
15 Apr 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 2.1 2 2.05 0 2.05 2.15 2.5 2.13 5.1 5.15 5.55 LSD LSD LSD 4.33 5.1 5.15 5.13 LSD LSD 4.93 4.38 3.63 - 0 2.77 None
15 Apr 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.2 0.2 0.2 0.3 0.3 0.2 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.6 0.4 0.3 0.3 0.3 - 0.2 0.2708333333333333 None
15 Apr 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 4.8 4.8 4.8 4.3 5 5.3 0.1 1.4 1.7 E/F 4.4 4.3 1.7 1.7 0.1 5 5 0 5 5 5 4 2 - 0 3.3083333333333336 None
15 Apr 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F LSD LSD LSD LSD E/F E/F E/F E/F E/F E/F - 0 0 None
15 Apr 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 1.6 1.5 1.6 1.6 2 2.3 0.1 2.3 2.2 0.2 0.2 0.2 0.2 0.1 0.2 O/C 0.3 0.3 0.33 0.3 0.28 0.29 0.28 - 0.1 0.8491666666666666 None
15 Apr 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 5.96 5.91 5.91 5.9 5.9 5.96 5.98 5.93 6 6.02 6.07 6 6.03 6.06 6.05 6.09 6.11 6.09 5.96 5.91 5.93 5.98 6.15 - 5.9 5.996249999999999 None
15 Apr 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.07 0.07 0.06 0.06 0.07 0.06 0.07 0.07 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.07 0.07 0.08 0.08 0.07 0.07 - 0.06 0.07750000000000003 None
15 Apr 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 3.35 3.25 4.4 5.4 5.35 5.15 3.45 3.55 3.75 4.4 6.05 8.65 8.5 6.05 6.8 4 6.8 10.1 7 7 8.9 6.1 6 - 3.25 5.845833333333334 None
« Previous Page 94 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —