Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
25 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 5.1 4.9 4.7 4.8 4.6 4.4 4.2 4.4 4.1 4.1 4 3.9 3.9 4 4.3 4.3 4 INST. E/F 5.2 5 5 4.7 4.7 4.9 3.9 4.486956521739131 None
25 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
25 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 13.4 12.7 12 11.6 11.5 11.3 10.6 10 11.2 11.3 11.5 11.8 12.2 12.3 12.6 12.5 7.8 INST. E/F 8.2 12.8 4.7 12.4 11.6 11.2 4.7 11.182608695652174 None
25 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 5.8 5.5 11.2 8.1 7.3 7.7 7.6 LS/D LS/D LS/D LS/D LS/D 2.34 2.75 3 12.55 8.51 E/F E/F E/F 8.4 10.64 3.09 2.83 2.34 6.706875000000001 None
25 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 5.3 5.1 4.9 5.3 4.6 4.5 4.1 4.7 5.7 3.9 3.6 3.2 3.2 3.7 3.8 4.5 4 INST. E/F 3.8 3 3.5 3.5 4.7 4.6 3 4.22608695652174 None
25 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5.4 3.81 3.67 3.66 3.51 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.69 O/C O/C 4.08 3.67 2.69 3.8112500000000002 None
25 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 14.6 14.1 13.3 12.9 13 13.2 12.8 13.4 13.9 13.5 13.6 13.6 13.5 10.6 11.1 10.7 7.1 INST. E/F 12 12.9 12.3 12.2 11.6 11.4 7.1 12.491304347826087 None
25 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
25 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 0.2 0.2 0.2 0.25 0.25 0.25 0.2 0.3 0.25 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.15 0.2 0.15 0.15 0.15 0.15 0.15 0.21458333333333343 None
25 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC LS/G LS/G 1.5 1.7 1.85 1.9 1.9 1.85 1.85 1.75 1.65 6.2 4.1 3.25 3.5 2.5 2.25 1.75 3.5 1.7 1.6 1.45 1.2 1 1 2.270454545454546 None
25 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 3.7 3.6 3.5 3.3 3.5 3.6 3.8 3.8 3.7 4.2 4.1 3.4 5.6 5 5.1 E/F E/F 5.3 5.3 5.1 5.3 4.7 4.4 4.2 3.3 4.281818181818182 None
25 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 14.96 13.24 12.86 12.26 12.17 12.34 11.76 11.46 11.5 11.5 11.7 11.9 12 12.4 12 12.7 L/S L/S 11.4 14.4 13.5 12.8 14.8 13.6 11.4 12.60227272727273 None
25 Apr 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 2.2 2.2 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 2.8 4 4.8 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 2.2 3.2 None
25 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 1.55 1.55 1.3 1.5 1.35 1 0.8 1.6 1.6 1.7 1.7 1.55 1.5 1.55 1.65 1.1 1 1.35 INST E/F 0 0 0 0 0 0 1.1021739130434782 None
25 Apr 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC E/F E/F E/F E/F E/F E/F E/F E/F 1.2 1.33333333333333 4 4.1 4 4.2 8 E/F E/F E/F E/F E/F E/F E/F E/F E/F 1.2 3.8333333333333326 None
25 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 16.8 15.53 E/F 14.47 14.09 14.49 14.45 13.96 14.6 14.8 14.4 SG SG SG 15.5 15.4 15.1 E/F 16.9 16.5 16.3 15.7 14.9 13.8 13.8 15.141578947368421 None
25 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 17.9 L/S L/S L/S L/S 18.5 18.5 B/C B/C B/C B/C 19.3 18.6 18.5 18.8 LS/G LS/G LS/G LS/G 21.2 19.6 18.3 LS/G 16.2 16.2 18.672727272727272 None
25 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 7.5 6 2.6 3.25 3.1 2.5 2.25 LS/D LS/D LS/D LS/D LS/D INST.E/F 2 2 3.6500000000000004 None
25 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC LS/D LS/D LS/D 9.55 10 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5.5 5.05 INST/E/F INST/E/F 0 6.6 6.75 7.1 6 0 6.283333333333334 None
25 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 5.3 5 5.7 5.6 5 5.1 3 3 3 3.1 3 5.5 5.6 5.5 5.8 2.3 E/F 6.1 6.1 6.2 2.9 2.7 2.5 2.4 2.3 4.365217391304348 None
25 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC LS/G 5.85 5.5 10.6 10.1 9.6 11.9 7 7 6.9 6.6 8.4 4.7 4.9 4.9 6.8 5.2 INST E/F INST E/F LS/D LS/D 12.05 11.8 10.6 4.7 7.915789473684212 None
25 Apr 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S 3 3 3.3 O/C O/C I/S I/S I/S I/S I/S I/S 0.8 0.7 0.6 1.8 0.6 1.885714285714286 None
25 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 13.24 12.1 11.33 10.69 10.38 LS/D LS/D 11.64 10.6 10.3 9.9 10.1 4.2 9.8 9.8 5.9 10.4 INST.E/F 13.5 11.4 11 10.9 12 L/S 4.2 10.459 None
25 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
25 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 1.1 1.1 1 1 1 1 1.1 1.3 1.4 1.5 1.4 1.3 1.4 1.4 1.4 1.4 1.4 INST. O/C 1 1.3 1.3 1.2 1 0.9 0.9 1.2130434782608694 None
25 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 2.3 2.3 2.2 2 2 2.1 2.1 2.1 2.1 2.1 2.1 2 2.1 2.1 2.1 2.2 INST. E/F INST. E/F INST. E/F 2.7 2.7 2.5 2.3 2.1 2 2.2000000000000006 None
25 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.5 0.6 0.5 0.5 0.4 0.5 0.5 0.5 0.5 0.7 0.6 0.5 0.6 0.6 0.6 E/F E/F 0.4 0.4 0.6 0.6 0.5 0.5 0.5 0.4 0.5272727272727272 None
25 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 7.3 LS/G LS/G 6.4 6 5.7 5.5 5.5 5.7 5.6 14.7 9.55 9.5 5.5 10.4 10.4 10.6 10.7 10.95 5.7 12.8 7.3 7.1 6.4 5.5 8.15 None
25 Apr 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.5 4.2 4.2 4.3 4.4 4.3 4.2 4.6 4.5 INST. E/F INST. E/F INST. E/F INST. E/F 2.6 2.4 0.4 2.21 None
25 Apr 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC 6 5.6 5.7 6 6.6 8.3 9.5 8.6 8 7.5 7.5 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5.6 7.20909090909091 None
25 Apr 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1.3 1.3 1.3 1.3 1.4 2 3 2.8 3 3.5 4 4 4.2 4.3 4.2 4 4.3 1.3 2.1 2.3 1.8 1.3 1.1 1.1 1.1 2.5374999999999996 None
25 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 1.2 3.6 1.9 1.9 3.5 3.3 3.5 3.4 3.8 4.1 4.1 4.1 3.2 4.2 4.1 4.6 E/F E/F E/F E/F 1.9 4 3.9 4 1.2 3.4150000000000005 None
25 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC LS/G LS/G 7 7.5 7.65 8.1 13.8 13.75 12.75 12.5 7.45 6.25 6.6 7 6.65 6.95 5.7 8.1 O/C O/C 6.25 5.75 5.95 5.75 5.7 8.0725 None
25 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10000000000000003 None
25 Apr 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2.2 2.1 2.1 2.2 2.1 2.5 2.7 3.1 O/C 1.8 1.7 1.7 1.9 2 2 E/F&O/C 1.9 2.1 2.2 3.1 3.1 2.5 2.2 2 1.7 2.2363636363636368 None
25 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 23.03 22 20.83 19.88 19.5 19.58 19.39 20.84 23.3 24.6 26 26.4 27 27.8 27.9 28.1 27.7 13.4 19.2 18.2 20.3 18.6 17.8 16.8 13.4 22.006249999999998 None
25 Apr 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.2 0.2 4.5 0.4 OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 0.2 1.3250000000000002 None
25 Apr 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA E/F E/F E/F E/F E/F E/F E/F E/F 1.2 1.3 1.4 1.4 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 1.2 0.22083333333333333 None
25 Apr 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL 1.08 1.11 1.08 1.14 1.14 1.32 1.5 LSD LSD LSD LSD LSD LSD 0.7 0.7 1.71 1.83 1.77 1.62 1.62 1.53 1.5 1.38 - 0.7 1.0008333333333332 None
25 Apr 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO ARGUNGU FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
25 Apr 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
25 Apr 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 5.2 7.3 8 5 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 5.6 5.6 6 - 4 1.9458333333333335 None
25 Apr 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.1 0 0 0 0 0 0 0.1 0 0 0 0 0 0 0 0 MTD MTD 0.1 0.2 0.4 0.4 LST - 0 0.0625 None
25 Apr 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 4 4 4 4 4 6 6 6 6 4 4 4 4 6 4 4 4 4 4 4 4 4 4 4 4 4.416666666666667 None
25 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 1.1 1.1 1.2 1.3 1.4 1.4 1.3 1.3 1.2 1.1 1 1.2 1.5 1.9 1.6 1.6 1.8 1.6 E/F 1 1 0.9 0.9 0.8 0.8 1.2695652173913046 None
25 Apr 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 - 0.04 0.040000000000000015 None
25 Apr 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 6.3 6.3 6.4 LSD LSD LSD LSD LSD LSD - 6.3 0.7916666666666666 None
25 Apr 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA 1.1 1.1 1.1 1 1 1.2 1.2 1.2 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 1 0.37083333333333335 None
25 Apr 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
25 Apr 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
25 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.6 0.7 0.8 0.3 0.2 0.2 0.5 0.8 1 1 1 1.2 1 0.6 1.1 1.4 1 1.4 E/F E/F E/F E/F E/F E/F 0.2 0.8222222222222222 None
25 Apr 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
25 Apr 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 7.5 7.2 7.2 7.3 8 8.9 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 OC/EF OC/EF OC/EF 0.1 2.266666666666668 None
25 Apr 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 0.8 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.7 0.7 0.7 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD E/F - 0.7 0.375 None
25 Apr 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.4 0.4 0.4 EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC 0.8 1.1 1.1 0.8 0.8 0.8 0.8 0.8 NCL/A 0.6 EF/OC EF/OC 0.4 - 0.4 0.4166666666666667 None
25 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 12 10.8 10.2 13.2 13 7 0.4 4 11 11 9 3 4 4 15 15 15 12 10 8 7.3 3 6.6 - 0.4 8.604166666666668 None
25 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 0.6 0.7 0.6 0.6 0.6 0.6 7.2 6.7 6 9 9 9 9 9 0.81 0.8 0.8 0.8 7 0.8 0.8 0.8 0.7 - 0.6 3.7795833333333326 None
25 Apr 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA FARFARU FEEDER TIED TO YABO/SHAGARI FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
25 Apr 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 3 2.7 2.55 2.55 2.1 2.1 0.4 0.3 0.3 0.3 3.6 3.45 1.5 1.5 1.5 1.1 1.1 1.1 1.1 0.8 2.5 2.8 O/S - 0.3 1.7270833333333335 None
25 Apr 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 2.25 2.1 2.1 2.1 2.1 2.4 3.4 3.1 2.9 2.25 MTD MTD MTD MTD 3.4 NCL/A 3.4 3.5 LSD LSD LSD LSD O/S - 2.1 1.55 None
25 Apr 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 1.8 1.5 O/C O/C O/C O/C O/C 2.3 2.7 3 2.7 3 2.4 2.4 1.8 2.3 2.3 2.5 2.5 3.1 1.8 O/C O/S - 1.5 1.5875000000000001 None
25 Apr 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 7.86 9.31 10.04 10.16 10.17 9.73 10.26 6.71 6.68 10.66 7.12 7.56 10.44 10.18 9.97 10.89 10.81 11.1 10.6 11.91 11.56 6.66 9.99 - 0.14 9.187916666666666 None
25 Apr 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 4.1 4 4.03 3.13 3.43 LSD LSD 6.15 6.2 5.9 5.7 5.5 5.5 LSD LSD LSD LSD LSD 6.5 6.8 5.95 5.2 4.7 - 3.13 3.626666666666667 None
25 Apr 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.5 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 O/C O/C O/C - 0.2 0.19999999999999998 None
25 Apr 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 0.8 1.4 1.4 0.8 0.8 1 1.1 1.1 O/C O/C O/C O/C O/C O/C 2 5 5 NCL/A NCL/A LS/D LS/D LS/D LS/D - 0.8 0.85 None
25 Apr 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 7.2 7.1 LSD LSD LSD O/C - 7.1 0.5958333333333333 None
25 Apr 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 2 1.6 1.6 1.8 1.9 2.8 E/F E/F 0 0.15 0.16 0.16 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 - 0 0.5862499999999997 None
25 Apr 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 5.5 5.81 5.87 5.85 5.84 5.75 5.82 5.81 5.82 5.9 5.84 5.89 5.94 5.89 5.84 5.83 5.84 5.84 5.94 5.94 5.85 5.78 5.84 - 5.5 5.8304166666666655 None
25 Apr 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.08 0.08 0.08 0.08 0.08 0.07 0.08 0.08 0.08 0.08 0.08 0.08 - 0.07 0.07583333333333338 None
25 Apr 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 6.25 6.35 6 5.8 8.15 4.05 3.9 3.5 4.15 6.4 6.55 6.75 6.55 6.4 6.65 3.05 2.75 4.1 7.15 7 LSD O/S LSD - 2.75 4.78125 None
25 Apr 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
25 Apr 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA LSD LSD LSD LSD LSD DS 6.5 6.2 6.3 DS DS DS DS DS DS DS DS DS DS DS DS DS DS - 6.2 0.7916666666666666 None
25 Apr 2026 None YAURI TR2-40MVA KOKO — KADUNA DS DS DS DS DS DS DS DS DS 0.1 0.1 0.1 2 0.1 0.1 0.1 0.1 DS DS 2.2 2 1.6 O/S - 0.1 0.3541666666666667 None
25 Apr 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA 8 6.6 5.8 5.3 O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 6.3 8.1 9.1 8.3 NCL/A LSD LSD LSD EF/OC - 5.3 2.3958333333333335 None
25 Apr 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA 2.9 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD OC&EF - 2.9 0.12083333333333333 None
25 Apr 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 1.2 1.2 1.1 1.1 0.9 O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 1 2 3.1 3.1 3.3 3.4 3.4 1.3 - 0.9 1.1416666666666666 None
25 Apr 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1 0.1 0.1 0 - 0 0.016666666666666666 None
25 Apr 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA 2.2 2.7 2.5 2.6 0.5 0.5 0.6 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 0.5 0.48333333333333334 None
25 Apr 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD OC&EF - 0 0 None
25 Apr 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.65 0.55 0.55 0.6 0.55 0.6 0.55 0.5 0.5 0.5 0.65 0.55 0.65 0.65 0.75 0.85 0.75 0.75 0.75 0.8 0.8 O/S 0.7 - 0.5 0.61875 None
25 Apr 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 2.2 2.2 2.5 5.9 LSD LSD LSD LSD LSD LSD MTD MTD MTD 2.2 6.5 6.5 6 4 4 4 O/C/EF O/C/EF O/C/EF - 2.2 1.9166666666666667 None
25 Apr 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0.01 0 0.01 0.01 0.01 0 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0 0.01 0.01 0.01 0.02 0.01 0.01 LST - 0 0.009166666666666668 None
25 Apr 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 3.45 3.2 8.15 0.85 4.4 4.65 9.7 0.95 4.45 4.75 4.35 4.65 3.15 3.05 3.2 3.3 2.85 2.9 2.85 NCL/A 3.45 O/C O/C - 0.85 3.2625000000000006 None
25 Apr 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C E/F E/F E/F E/F CB/F CB/F CB/F CB/F CB/F - 0 0 None
25 Apr 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 1.5 5 4.8 4.8 4.3 4.5 5.9 5.9 6.1 5.1 5 5 4.8 5.1 6.2 5.8 5.8 4.7 1.4 1 1 1 1 - 1 4.05 None
25 Apr 2026 None YAURI TR1-40MVA NGASKI — KADUNA DS DS DS DS DS DS DS DS DS DS DS 2 2.5 NCL/A NCL/A NCL/A NCL/A NCL/A DS DS 2.5 2.3 O/S - 2 0.3875 None
25 Apr 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA 2.6 2.3 2.2 2.5 LSD 2.3 2.4 LSD LSD LSD 2.9 3.2 2.9 2.8 2.8 2.9 3.1 3 3 OC/EF OC/EF OC/EF OC/EF - 2.2 1.7041666666666666 None
25 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 1.6 1.6 1.6 2.2 2.4 2.6 2.1 1.6 0.5 0.6 0.6 0.5 1.9 1.9 2 2.8 2.7 2.8 E/F E/F E/F E/F E/F E/F 0.5 1.7777777777777777 None
25 Apr 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 6.6 6.4 6.5 6.6 1 1 1 1.2 1.3 1.5 MTD MTD 1.1 1.4 9.7 6.5 6.5 6.4 1.4 1.5 1.3 1.2 9.4 - 1 3.670833333333334 None
25 Apr 2026 None SOKOTO TR1- 40/30MVA P/STATN — KADUNA 10.5 10.2 12.7 12.1 9.5 9.5 9.5 13.6 O/C 0.6 0.7 0.8 0.7 2.8 0.8 4.6 9.9 20.2 20.6 17.5 15 13.2 12.9 - 0.6 9.141666666666666 None
25 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
25 Apr 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.3 0.4 0.3 0.3 0.3 0.1 0.3 0.4 0.4 0.4 0.4 0.1 0.4 0.4 0.4 0.4 0.4 E/F E/F E/F E/F E/F E/F E/F 0.1 0.3352941176470589 None
25 Apr 2026 None B/KEBBI TS TR6-100MVA TAMBUWAL — KADUNA 2 2 1.8 1.8 1.8 2 2.2 INST. E/F E/F 0.52 0.56 1.2 3 3 3 3 0.57 0.54 0.54 0.8 2.2 2.3 2.2 - 0.52 1.62625 None
25 Apr 2026 None KONTAGORA TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA 7.7 5.8 5.7 5.7 5.4 4.6 5.2 5.1 7.1 7.2 7 6.8 6.43 6.4 6.1 5.8 5.5 7.3 7.4 7.4 NCL/A 0.2 LST - 0.2 5.380416666666666 None
25 Apr 2026 None SOKOTO TR 3 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL KADUNA 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 12.9 11 10.3 4.9 4.3 5.8 6.8 0.7 0.6 0.6 0.7 0.7 0.6 0.6 - 0.5 2.733333333333333 None
25 Apr 2026 None BIDA TR5-60MVA Town 11KV fdr — ABUJA LSD 4.5 4.4 4.5 LSD LSD LSD LSD LSD LSD LSD LSD 5.3 5.3 LSD LSD LSD LSD LSD LSD LSD LSD LSD - 4.4 1 None
25 Apr 2026 None B/KEBBI TS TR5-60MVA UNIVERSITY — KADUNA 0.2 0.2 0.2 0.2 0.2 0.3 0.2 0.3 0.25 0.3 0.3 0.3 0.32 0.32 0.32 0.28 0.28 0.25 0.27 0.3 0.3 0.4 0.4 - 0.2 0.28291666666666665 None
25 Apr 2026 None KONTAGORA TR1- 60MVA WATER WORKS 132KV KONTAGORA TS_33KV WATERWORKS FDR_PL_PL ABUJA 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.3 0.3 0.4 0.3 0.4 0.4 0.4 0.3 0.4 0.4 0.4 0.4 0.5 LST - 0.3 0.32500000000000007 None
25 Apr 2026 None SOKOTO TR 3 60MVA YABO — KADUNA 6.5 6.2 5.9 5.9 5.9 6.4 7.2 7 7.5 7 7 6.7 11.2 9.4 7.4 7.6 0.3 0.3 0.3 2 6.8 6.7 6.7 - 0.3 6.008333333333333 None
25 Apr 2026 None YAURI TR1-40MVA YAURI — KADUNA 5.4 5.3 5.2 5.2 5.4 6.1 DS DS DS DS DS DS DS 4.2 4.2 0.6 3.7 3.6 0.6 DS DS DS O/S - 0.6 2.0625000000000004 None
« Previous Page 78 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —