Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
26 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 6.75 7.62 6.51 7.74 6.95 7.13 7.18 7.27 6.92 5.99 8.57 8.19 7.55 7.15 9.8 8.5 12 11 9.9 11.3 10 13.7 8.7 9.41 5.99 8.57625 None
26 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 2.02 2.27 1.98 2.37 2.16 2.27 2.29 2.1 2.33 2.04 2.99 2.92 2.72 2.55 3.4 2.8 3.3 3.1 3 3.4 2.9 3.7 2.4 2.46 1.98 2.644583333333333 None
26 Apr 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 4.86 5.65 5.07 5.96 5.99 5.14 5.67 5.9 5.86 5.55 7.68 7.12 6.63 6.24 8.36 6.5 8 7.2 6.8 7 6.3 7.5 5 5.49 4.86 6.31125 None
26 Apr 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 6.84 7.89 7.09 7.97 7.15 7.31 7.2 7 6.82 6.23 8.57 7.94 7.72 7.07 9.62 8.2 10.6 10.8 8.5 9.2 10 12.5 7.9 15.3 6.23 8.559166666666668 None
26 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - 13.74 - - - - - - - - - - - - - - - - - - - - - 13.74 13.74 None
26 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 13.76 15.33 13.74 15.22 13.56 23.91 3.86 13.99 12.24 10.31 15.54 14.65 8.39 18.91 19.89 17.2 19.7 17.5 18.5 19.4 4 PH/IMBAL 10.3 15.28 3.86 14.573043478260868 None
26 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
26 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 8.4 7.9 7.6 7.2 7.2 7.5 7.4 10.3 9.8 9.6 9.5 10.2 11 11.5 11.7 12 12 11.8 13.2 13.9 13.9 13.9 12.9 12.1 7.2 10.520833333333334 None
26 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 15.2 14.3 13.7 13 12.8 12.9 12.5 12.1 12 12 12.5 12.9 13.7 14.7 15.2 14.9 15.4 15.3 17.1 17.8 18.2 18.3 17.4 16.14 12 14.584999999999999 None
26 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
26 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
26 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
26 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.4 1.3 1.3 1.3 1.2 1.2 1.21 1.12 1.06 1.04 1.13 1.11 1.23 1.34 1.4 1.46 1.37 1.39 1.56 1.63 1.69 1.73 1.67 1.53 1.04 1.3487500000000001 None
26 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 3.1 7.85 7.55 7.25 7.55 7.95 7.5 7.45 7.5 7.6 7.15 7.95 8.05 8.25 8.3 8.5 8.55 8.4 9.3 9.5 7.2 9.55 8.9 8.5 3.1 7.891666666666668 None
26 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 4 3.95 3.75 3.6 4.85 4.95 5.15 5.15 LS/D LS/D 6 5.6 5.5 5.8 5.95 6.3 6.4 6 6.15 6.5 6.65 6.3 6.05 5.75 3.6 5.470454545454546 None
26 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
26 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H15 132KV APO TS_33KV FDR H15_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.062 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.062 0.09841666666666671 None
26 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H2 132KV APO TS_33KV FDR H2_PL_PL AEDC 4 3.75 3.6 3.5 3.6 3.55 3 3.4 3.45 3.5 3.55 3.75 3.9 3.95 4.05 3.9 3.85 3.95 4.1 4.3 4.45 4.5 4.45 4.1 3 3.8395833333333322 None
26 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H21 132KV APO TS_33KV FDR H21_PL_PL AEDC 16.7 15.5 13.6 13.05 15.65 16.45 10.5 12.4 11.2 11.2 11.45 SWS SWS SWS 15.05 INST.OC 13.75 10.6 17.6 3.65 7.25 12.55 15.6 16 3.65 12.9875 None
26 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H23 132KV APO TS_33KV FDR H23_PL_PL AEDC 0.3 0.3 0.4 0.2 0.2 0.4 0.2 0.2 0.4 0.4 SG SG SG SG SG SG SG 7.4 9.2 9.6 10.2 9.8 9 11.6 0.2 4.105882352941176 None
26 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H3 132KV APO TS_33KV FDR H3_PL_PL AEDC 11.7 11.4 10.9 10.45 10.5 10.8 10.75 10.75 10.65 10.6 10.7 11.35 11.5 12.15 12.4 12.6 12.2 12.3 13.25 13.55 13.7 13.4 13.25 12.5 10.45 11.80625 None
26 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H31 132KV APO TS_33KV FDR H31_PL_PL AEDC 13.9 13 12.3 11.9 12.3 12.75 13.15 12.6 12.15 11.6 INST.EF INST.EF 6.4 6.35 6.5 9.75 9.9 16.15 13.7 17.95 18 17.1 LS/G LS/G 6.35 12.372499999999999 None
26 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC LS/D LS/D 22.6 18 17.6 19.05 20.2 18.4 17.45 16.95 17.6 18.9 17.95 INST. EF INST. EF INST. EF INST. EF INST. EF 16.4 16.4 LS/G LS/G 17.7 14.6 14.6 17.986666666666665 None
26 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 8 7.5 6.85 6.6 6.8 7.35 8.1 7.8 7.4 7 7.45 7.5 6.8 8.15 8.25 8.3 8.35 8.2 8.9 5.2 LS/G LS/G 7.1 6.25 5.2 7.447727272727272 None
26 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 5.85 5.5 5 4.8 4.85 4.75 4.65 4.35 4.15 4 4.15 4.25 4.6 5 5.05 5.2 5.2 5.1 5.8 6 6.2 2.85 2.75 2.8 2.75 4.702083333333333 None
26 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 11.7 11.3 11.2 10.85 11.1 11.6 11.6 11.5 11.05 10.95 10.95 11.35 11.9 12.05 12.35 SG SG 12.5 12.85 11.4 13.45 13.1 12.6 11.9 10.85 11.784090909090908 None
26 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 0.36 1.9 1.4 1.65 1.75 1.35 1.3 1.55 1.5 1.8 1.55 1.8 2.15 1.85 1.8 1 1.25 1.65 1.75 1.9 1.9 1.9 1.85 1.8 0.36 1.6129166666666668 None
26 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF SG SG SG 8.2 10.9 14.1 13.2 12.9 12.5 14.1 14.6 14.8 13.8 12.4 14.5 8.2 13 None
26 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC 14.3 13.3 12.7 12.4 13.1 14.6 16.3 16.2 16 13.7 14.2 15 16.1 16.6 16.1 16.5 16.4 L/SD L/SD L/SD L/SD L/SD L/SD L/SD 12.4 14.91176470588235 None
26 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC 5.6 5.2 5.1 9.9 5.1 5.7 5.8 5.4 5.2 5 5.1 5.2 6 L/SD L/SD L/SD L/SD 6.8 7.3 7.7 7.4 INST O/C INST O/C INST O/C 5 6.088235294117647 None
26 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC L/SD L/SD L/SD 12 12.1 12.5 13.2 10 13.8 13.3 13.8 14.8 8.7 13.2 L/SD L/SD L/SD 11.1 10.8 10.3 L/SD 11.9 10.5 11.8 8.7 11.988235294117647 None
26 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF EF 0 nan None
26 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC 8.2 7.6 7.3 7.1 7.3 7.9 8.1 8 L/SD L/SD L/SD 8.3 L/SD L/SD L/SD L/SD L/SD L/SD L/SD L/SD 13.1 11.6 10.3 9.1 7.1 8.76153846153846 None
26 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 11 10.6 9.5 8.6 8.7 8.9 9.2 13.4 11.7 9.2 11.2 12.6 13 13.9 14 1.7 14 13.7 14.6 14.2 14.2 14 12.7 11.9 1.7 11.52083333333333 None
26 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC LS/D LS/D LS/D 10.4 15.4 16.66 17.4 11.16 10.75 10.59 16 16.1 E/F E/F E/F E/F 11.7 12.2 13.2 13.99 12.68 12.5 11.5 E/F 10.4 13.264375 None
26 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 11.1 10.1 9.8 9.4 9.6 10.5 11.3 10.7 10 9.7 13 13.9 14.4 10 LS/D 13.3 14.9 15.2 16.9 15.6 15.6 15.2 13.7 13 9.4 12.47391304347826 None
26 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 10.19 9.77 9.31 9.05 9.44 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 12.7 13.3 12.8 12.2 11.9 12.1 12.86 13.7 13.29 12.5 11.3 10.6 9.05 11.588823529411764 None
26 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 4.7 4.5 4.4 3.8 3.8 3.9 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 1 1.1 1 0.9 0.9 1.1 5.6 5.6 5.2 5.2 4.8 0.9 3.3823529411764706 None
26 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
26 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 10.7 10 9.6 9.4 9.6 9.7 9.3 8.7 8.6 8.8 9 9.6 9.6 9.6 9.9 10.2 9.7 10 11.5 12 12 2.1 2.1 11 2.1 9.279166666666665 None
26 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 8.57 10.73 10.07 EF/OC EF/OC EF/OC 7.53 7.39 7.2 7 7.1 7.4 7.66 8 9.8 13.88 13.2 12.78 3 3.3 10.2 9.69 8.8 14.5 3 8.942857142857143 None
26 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 4.8 4.6 4.5 4.4 4.4 4.3 4 3.2 1.6 2 2.9 3.1 2.9 2.7 4.3 4.2 3.7 4.2 3.5 3.9 3.9 3.9 3.9 2.3 1.6 3.633333333333334 None
26 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 3.42 3.23 3.11 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.35 4.99 I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 3.11 3.8200000000000003 None
26 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 10.8 10.2 9.8 9.3 11.2 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 6 6.3 6.4 14.4 7.1 11.5 12.6 12.9 12.1 11.9 11.9 13.9 6 10.488235294117647 None
26 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
26 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 0.15 0.15 0.15 0.15 0.15 0.2 0.15 0.4 0.4 0.35 0.35 0.35 0.2 0.2 0.3 0.25 0.3 0.3 0.15 0.2 0.2 0.2 0.2 0.2 0.15 0.23541666666666672 None
26 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 1.1 1.25 1.5 1.5 1.5 1.5 1.6 1.5 1.5 1.6 1.7 1.9 1.8 1.8 1.9 1.9 2.15 7 8 8.3 6 5.75 1.9 1.7 1.1 2.764583333333334 None
26 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 4 3.8 3.7 3.5 3.6 3.9 4.4 4.3 4.2 4.1 4.3 4.4 4.5 4.4 4.5 4.7 4.7 4.6 4.9 5 5 4.7 4.4 4 3.5 4.316666666666667 None
26 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 12.7 13.7 11.4 10.98 10.8 11 10.8 10.5 10.01 9.9 10.2 10.4 11.1 11.5 11.9 11.4 11.8 8.5 INST, E/F INST, E/F INST, E/F 7.4 13 11.5 7.4 10.975714285714288 None
26 Apr 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 3.4 3.4 3.5 3.6 4 4.5 8.8 7.5 6.3 2.3 5.1 5.2 5.3 OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 4.6 2.3 4.821428571428571 None
26 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 1 1.1 1.35 1.25 1.2 0.75 0.5 1 1.2 1.2 1.25 1.2 1.2 1.1 0.95 1.1 0.7 0.5 0.3 0.7 0.65 0.9 0.8 0.7 0.3 0.9416666666666664 None
26 Apr 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 1.1 1.5 1.4 1.2 1.4 4.6 7 E/F E/F E/F E/F 1.1 2.6 None
26 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 12.9 12.4 11.7 11.4 11.3 12.4 12.5 12.2 11.54 11.6 11.3 12.3 S/G 13.6 13.7 13.8 13.6 13.1 14.8 16.1 15.8 LS/G 15.9 14.2 11.3 13.097272727272726 None
26 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 15.2 14.2 13.8 12.4 13.5 13.8 15.2 14.5 13.5 13.7 14.1 15 15.6 16.5 16.5 16.5 16.2 16.1 17.9 18.3 18.3 LS/G LS/G LS/G 12.4 15.276190476190473 None
26 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC 1.95 2 2.25 2.05 2.1 2.05 1.05 4 4.75 5 7.6 6.7 7.3 INST.O/C INST.O/C INST.O/C 2.5 INST.O/C INST.O/C INST.O/C INST.O/C INST.O/C 4.9 4.9 1.05 3.8187499999999996 None
26 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC 5.25 5.25 5.5 6 6.25 6.6 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 10 11 9.5 9 14.5 14 12.8 11.75 6.5 6 5.25 8.743749999999999 None
26 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 2.3 2.2 2.3 2.2 6.2 7.9 5.3 5.7 5.9 5.8 5.7 9.9 4.2 4.2 4.1 4.3 5.4 5.3 5.4 LS/D LS/D 2.7 5.6 8.6 2.2 5.054545454545454 None
26 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 9.7 9 8.5 11.5 11.1 9.8 10.9 10.2 10.3 10.4 10.1 8.9 14.7 14.9 14.2 16.9 17.1 16.9 17.3 16.2 16.65 16.25 15.1 16 8.5 13.025 None
26 Apr 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 1.9 1.8 1.6 1.5 0.5 0.6 0.8 0.7 1.7 2 2 I/S I/S I/S I/S I/S I/S I/S 0.5 1 2 1.2 1.3 2 0.5 1.3588235294117648 None
26 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 12.8 10.2 9.4 9.1 8.8 8.9 8.1 8 7.95 8.2 8.4 8.7 9 10 10.3 10.4 10.5 10.4 11.7 12.5 12.5 12.5 12 11.4 7.95 10.072916666666668 None
26 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
26 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.9 0.9 0.8 0.8 0.8 0.9 0.9 0.9 0.8 0.8 0.9 0.9 0.9 1 1 1 1 0.9 1.2 1.2 1.1 1.2 1 0.9 0.8 0.9458333333333333 None
26 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 1.9 1.8 1.8 1.8 1.8 2 2.1 2.1 1.9 1.9 1.8 1.8 1.9 2.1 2.1 2.1 2.1 2.1 2.4 2.5 2.6 2.6 2.3 2.1 1.8 2.066666666666667 None
26 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.5 0.5 0.5 0.5 0.4 0.5 0.4 0.5 0.5 0.6 0.6 0.7 0.3 0.7 0.6 0.7 0.6 7.7 9.7 10.4 7.5 7 6.3 0.5 0.3 2.425 None
26 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 5.7 5.3 5.1 12.2 8.5 8.3 13.3 11.9 11.5 11.4 11.3 11.2 12.7 13.2 13.6 12.3 11.8 12.7 LS/D LS/D LS/D 7.95 6.9 6.3 5.1 10.15 None
26 Apr 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 2.4 2.3 2.4 2.5 2.9 4 INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C 4 4.8 6 6.2 0.7 0.7 0.7 0.7 0.7 4.7 4.5 3.6 3.2 0.7 3.0000000000000013 None
26 Apr 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 7.7 9.5 10 E/F E/F E/F E/F E/F E/F 7.7 9.066666666666666 None
26 Apr 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1 1 1 1.1 1.4 2 2.8 2.5 1.9 1.7 1.7 1.8 2.2 4 8 8.2 1 E/F E/F E/F E/F 1.8 1.4 1.1 1 2.38 None
26 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 3.5 3.5 3.3 3.5 3.5 3.5 2.8 2.8 2.9 3 2.7 2.7 2.8 2.7 2.9 1.2 3.2 E/F E/F 1.2 3.4 3.5 3.1 2.7 1.2 2.9272727272727277 None
26 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 5.75 5.85 5.85 6 6.5 6 9 10 10.5 10.5 7.6 7.8 11.45 15.15 8 7.25 7 7.25 I/S I/S I/S I/S 5.75 5.9 5.75 7.955 None
26 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 9.1 8.8 8.3 7.8 7.5 E/F E/F E/F E/F E/F E/F E/F 0.1 2.511764705882353 None
26 Apr 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2 2 1.6 1.8 1.8 2.3 2.2 2.2 1.8 1.9 1.9 2 2 2 2 2.1 2 2 2.3 2.2 2.1 2.2 2.2 2.1 1.6 2.029166666666667 None
26 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 17 16.4 16.3 15.7 15.3 15.6 13.7 14.2 14.3 16.2 16.6 18.1 19 19.6 20.1 20.5 21.3 21.3 23.7 22.9 22.2 22.7 21.2 20 13.7 18.49583333333333 None
26 Apr 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 2.1 1.5 2.8 2.8 2.6 3.1 2.9 2.6 1.5 2.55 None
26 Apr 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA LSD 1 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.1 0.4 1.2 1.3 1.3 1.3 1.2 1.1 - 0.1 0.4166666666666667 None
26 Apr 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL LSD LSD LSD LSD 1.17 1.35 1.68 1.62 1.41 1.44 1.35 1.44 1.41 OC 0.27 0.3 0.3 1.26 1.59 1.68 1.47 1.47 1.29 - 0.27 0.9374999999999999 None
26 Apr 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO ARGUNGU FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
26 Apr 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
26 Apr 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA 5.2 5 8 8.3 8 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 6 7 8 E/F E/F E/F - 5 2.3125 None
26 Apr 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1 0 0 0 0 0 0 0 0 0 - 0 0.004166666666666667 None
26 Apr 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 4 4 4 4 4 4 4 4 4 4 4 6 6 6 6 6 6 6 6 8 6 6 6 4 4 5.083333333333333 None
26 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 0.8 0.7 0.7 0.7 0.8 0.8 1 1 0.8 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.7 0.8111111111111111 None
26 Apr 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 - 0.04 0.040000000000000015 None
26 Apr 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA LSD LSD LSD LSD LSD LSD O/C O/C O/C O/C 5 5 5 5 LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5 0.8333333333333334 None
26 Apr 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 1.4 2.1 2.3 2.3 2.4 2.4 2.2 2 2 - 1.3 0.8500000000000001 None
26 Apr 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
26 Apr 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
26 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.1 0.6 0.6 0.7 1.2 1 0.7 0.9 1.1 0.7 0.3 0.6 0.6 0.6 0.6 0.1 0.6866666666666666 None
26 Apr 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
26 Apr 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 8.2 9.9 10.1 9.6 9.1 8.8 8.4 8.6 9.3 9.2 8.7 7.8 7.3 6.7 6.7 8.692857142857143 None
26 Apr 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F 4.3 3.8 8.5 9.5 8.9 5.3 0.5 0.5 0.5 0.5 0.5 0.5 0.5 3.8 - 0.5 2.141666666666666 None
26 Apr 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.4 0.4 0.4 0.4 0.5 0.6 0.6 0.7 0.8 0.7 0.6 0.8 0.8 0.8 0.7 0.8 0.8 0.7 NCL/A LSD LSD LSD - 0.4 0.5125000000000001 None
26 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 7 8 8 8 8 9 4.4 4.2 12 16 13 13 5 8 14 10 10 10 4.2 10 6.2 1.6 1.2 - 1.1 7.995833333333331 None
26 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 8 7.6 7.2 7 7.6 6.4 7 6.2 9 0.7 0.75 0.81 INST/E/F INST/E/F INST/E/F 6 0.53 0.49 6.2 6 10 O/C 0.6 - 0.49 4.111666666666666 None
26 Apr 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA FARFARU TIED TO YABO/SHAGARI FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
26 Apr 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 2.6 2.8 2.7 2.8 1.7 1.3 0.4 0.4 0.4 0.4 3.4 3.5 1.3 1.8 2.1 1.1 1 1.1 0.4 0.4 0.8 4.2 3.5 - 0.4 1.791666666666667 None
26 Apr 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 2.3 2.4 2.6 2.5 2.5 2.5 3.5 3.4 2.2 2.5 2.5 2.5 2.2 1.1 0.9 0.9 1 2.6 2.6 3.7 3.1 2.6 2.7 - 0.9 2.3875 None
26 Apr 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 0.4 0.5 0.4 0.4 0.4 0.4 O/C 0.6 0.7 0.8 0.8 2 2.1 2.6 O/C 2.2 2.1 2.1 1.9 2.6 2.5 2.6 2.7 - 0.4 1.3791666666666667 None
26 Apr 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 7.96 7.75 7.63 7.57 10.39 11.58 11 10.9 9.8 9.26 7.26 7.32 3.9 7.4 7.34 9.96 10.66 6.35 10.39 11.02 6.24 9.09 9.44 - 3.9 8.710416666666669 None
26 Apr 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 3.8 3.5 3.35 3.8 3.85 4.4 5.9 5.95 5.8 5.6 5.8 5.6 5.7 5.4 5.4 5.5 5.8 6 6.15 5.9 5 4.8 4.4 - 3.35 5.066666666666667 None
« Previous Page 76 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —