Hourly Load Profile (Unified)
Average Hourly Load Analysis
Multi-select enabled
Attribution Analysis Upload Load Report

Average Hourly Load (MW)

Detailed Hourly Readings
Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
28 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.55 1.5 1.6 1.45 1.5 1.25 1.45 1.5 1.9 2 2.15 2.05 2.25 2.25 2.3 1 1.95 2.1 1.75 1.4 0.1 0.15 1.1 1.05 0.1 1.5541666666666665 None
28 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC 11.1 10.4 9.8 9.7 10.8 12.2 13.7 11.5 11.7 11.7 11.7 6.1 6.2 6.1 6.5 7 7.1 10.9 13.2 14.3 14.4 LS/D LS/D 9.3 6.1 10.245454545454546 None
28 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC LS/D LS/D 16.1 15.6 16.8 19.3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 18.6 19 19.1 19.6 LS/D LS/D LS/D LS/D LS/D LS/D 15.6 18.0125 None
28 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D 8.1 7.2 6.1 5 5.3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 9.4 9.9 LS/D LS/D LS/D 5 7.285714285714286 None
28 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D 14.4 12.4 12.9 10.5 7.2 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 8.1 11.7 13.4 LS/D LS/D 7.2 11.325000000000001 None
28 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC 13.7 12.9 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 11.7 16.5 16.7 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 18.4 18.2 15.1 11.7 15.4 None
28 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC 9 8.3 7.9 7.8 8.2 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 12.9 12.5 LS/D LS/D LS/D LS/D 7.8 9.514285714285714 None
28 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC O/C O/C O/C O/C O/C O/C 3.4 14.4 12.2 18.7 8.3 14.1 13.5 13.4 13.6 13.2 14.3 2.1 O/C O/C O/C O/C O/C 10 2.1 11.63076923076923 None
28 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC LS/D LS/D LS/D LS/D 17.89 1.65 12.3 11.2 11.7 12.1 10.4 15.4 11 LS/D LS/D LS/D LS/D EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC 1.65 11.515555555555556 None
28 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 12.2 11.6 11.1 10.8 11.7 13.3 12.6 11 10.7 13.5 12.8 12.9 13 13.2 14.6 11.2 9 10.2 17.5 18 17.6 16.6 14.6 14.4 9 13.0875 None
28 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 10.8 10.3 9.99 9.9 LS/D LS/D LS/D 11.9 12.3 11.8 11.3 11 11 10.2 E/F E/F I/S I/S I/S I/S I/S I/S I/S I/S 9.9 10.953636363636363 None
28 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 4.7 4.5 4.2 4.2 4.2 4.4 4.2 4.2 4.2 4.3 4.4 4.3 4.3 4.5 4.7 4.2 4 4.4 4.7 5.2 5.2 5.4 5.3 5.2 4 4.5375000000000005 None
28 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
28 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 11 10.4 10.1 9.9 10 10.3 10.3 10.3 12.1 12 S.G S.G S.G S.G S.G 7.8 14.3 13.5 14.7 14.5 14.8 14.6 14 13.5 7.8 12.005263157894737 None
28 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 14.87 14.28 13.75 13.6 2.4 1.45 2.5 7.1 7.2 7.6 8 8 8.1 14.3 14.3 EF/OC EF/OC 2.4 6.5 6.4 8.2 7.6 8.9 10.9 1.45 8.561363636363636 None
28 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 5.9 5.7 5.5 5.6 5.5 5.3 5.3 6 5 INST E/F INST E/F 5 5.1 5.4 6.9 0.7 3 3.7 5.5 6.1 6.3 6.4 6 5.9 0.7 5.263636363636365 None
28 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 3.33 3.25 3.2 3.3 3.68 3 3.1 3.1 3.4 3.3 E/F E/F E/F 4.8 5.1 E/F E/F E/F E/F E/F E/F E/F E/F E/F 3 3.546666666666667 None
28 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 11.2 11 10.5 10.2 10.2 10.3 9.5 10.2 12.1 9.7 11.7 11.9 15.2 15.9 17.1 12 10.7 11.6 12.9 13.1 13.2 13.1 12.5 11.9 9.5 11.987499999999997 None
28 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
28 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 1.65 1.6 1.55 1.55 1.6 1.6 1.7 1.6 0.1 0.4 0.35 0.35 0.15 0.35 0.2 0.25 0.35 0.15 0.15 0.15 0.15 0.2 0.15 0.15 0.1 0.6854166666666665 None
28 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 0.2 0.2 0.2 0.2 0.2 0.3 0.1 0.3 1.65 5.8 6 6.2 7.45 1.95 7.55 1.25 2.1 1.9 1.9 2 2.1 2.1 1.9 1.9 0.1 2.3104166666666663 None
28 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 3.9 3.7 3.5 3.5 3.7 4 4.4 4 2.6 4.5 4.6 4.6 4.7 5.1 E/F E/F E/F 5.1 E/F E/F E/F E/F 5.3 5.1 2.6 4.252941176470589 None
28 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC LS/G LS/G 15 12.7 12.2 12.4 11.9 10.9 LS/G LS/G LS/G 8.7 12.3 12.4 13 13.3 12.6 12.4 14.9 14.7 15.03 15.06 14.6 14.01 8.7 13.057894736842105 None
28 Apr 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 9.5 6.2 2 7.5 9 8.6 5.5 5.3 4.6 2 6.466666666666667 None
28 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 1.3 1.4 1.25 1.45 1.35 1.3 0.85 1.4 2.05 2.05 2.35 2.05 1.7 1.7 2.15 INST.EF/OC 0.75 1.65 1.1 1.8 0 0 0 0 0 1.2891304347826087 None
28 Apr 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC 5.7 5.4 OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 3.5 7.6 7.6 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 1.1 3.1 3.1 O/C&E/F 1.1 4.637500000000001 None
28 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 13.9 13.3 LS/G LS/G 17.6 16.2 15.3 13.3 14.8 14.8 15.1 8.7 E/F E/F 14.6 14.2 E/F 17.69 18.58 18.5 11.44 17.26 LS/G 13.78 8.7 14.947222222222216 None
28 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 17.8 16.8 15.9 15.8 LS/G LS/G 20.9 18 17.2 LS/G LS/G 15.7 16.2 16.8 17.6 INST. E/F INST. E/F INST. E/F INST. E/F 6.5 6.9 6.5 6.1 5.2 5.2 13.743749999999999 None
28 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C 4 2.6 3.85 5.3 5.3 INST.EF INST.EF LS/D LS/D LS/D LS/D 8.45 8.3 7.7 LS/D LS/D LS/D 2.6 5.6875 None
28 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC 6.8 6.25 6 6.4 6 6.3 12 10 7.05 10.15 7.1 6.85 5.25 7.15 LS/D LS/D LS/D LS/D LS/D LS/D INST.OC/EF INST.OC/EF INST.OC/EF INST.OC/EF 5.25 7.378571428571428 None
28 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 2.4 2.3 2.3 2.3 3.7 4.1 2.8 2.5 3 2.8 4.2 4 4.1 4.3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5.2 2.3 3.333333333333334 None
28 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC LS/G 16.7 14.75 13.9 LS/G LS/G 5.2 4.45 5.9 7.35 9.35 8.8 8.95 9.6 INST. E/F INST. E/F PH/IMBAL PH/IMBAL PH/IMBAL 6.3 15.6 5.1 13 12.4 4.45 9.834375 None
28 Apr 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 1.4 1.4 1.4 1.5 1.5 1.9 1.4 I/S I/S I/S I/S I/S I/S 2.1 2.5 2.8 1.3 2.7 2.2 I/S I/S I/S 2 2.2 1.3 1.8866666666666665 None
28 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 13.6 11.7 10.6 9.9 9.9 9.6 LS/G LS/G LS/G 9.6 9.1 8.8 8.8 8.7 8.6 INST.EF 1.23 10.3 13 13 13.49 13.23 12.8 12.24 1.23 10.4095 None
28 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
28 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.9 0.9 0.9 0.8 0.9 0.9 1.1 1.2 1.4 1.5 1.6 1.7 1.6 1.7 1.7 1.4 1.4 1.5 1.5 1.5 1.3 1.2 1.2 1.1 0.8 1.2874999999999999 None
28 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 1.9 1.9 1.8 1.8 1.9 2.3 2.2 2 1.9 1.9 1.9 1.9 1.8 1.9 2 2.1 2.2 2.3 2.7 2.8 2.8 2.6 2.4 2.2 1.8 2.133333333333333 None
28 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.5 0.6 0.5 0.4 0.5 0.5 0.4 0.5 0.4 0.5 0.5 0.5 0.5 0.5 0.6 8.3 10.5 8.1 8.4 7.9 8.4 7.7 0.6 0.4 0.4 2.820833333333333 None
28 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC LS/G LS/G 6.7 5 5.25 LS/G 6.6 5.1 4.7 12.75 12.4 12.3 16.6 11.15 E/F E/F E/F 5.3 5.8 EMRG 7.1 6.7 6.1 E/F 4.7 8.096875 None
28 Apr 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC LS/D LS/D 5.4 5.6 7.2 8 8.8 8.8 0.7 0.7 0.7 0.5 0.4 0.8 0.7 0.7 INST. O/C INST. O/C INST. O/C INST. O/C 3.6 2.9 2.4 2.2 0.4 3.3388888888888895 None
28 Apr 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F 0.5 0.3 5.3 5.5 5.6 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.3 0.3 2.9166666666666665 None
28 Apr 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1.3 1.3 1.2 1.3 1.6 2.3 2.7 3.2 4.4 8.8 6.8 6.8 2 2.2 2.2 2.1 2.3 2.3 2.9 2.2 2 1.5 1.3 1.2 1.2 2.7458333333333336 None
28 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 2.3 2.3 2.1 2.1 2 2.1 2.1 2.6 2.7 3.2 4.7 3.8 3.7 4.4 4.1 INST. E/F INST. E/F INST. E/F 1.4 0.7 2 2.2 2.6 2 0.7 2.623809523809524 None
28 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 7.5 7.35 8 9 9 12.55 7 6 6.7 I/S I/S I/S I/S 7.6 8 INST.EF 13.9 15.15 9.6 9 9.25 13.85 12.95 11.5 6 9.678947368421053 None
28 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 E/F E/F 11.5 12.6 12.2 12.1 E/F E/F E/F 0.1 2.626315789473684 None
28 Apr 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2 2.1 2.2 2.2 2.2 2.8 3 2.8 2.6 2.7 2.8 2.9 2.9 3 3 3.1 3 2.7 2.7 2.8 2.8 2.8 2.7 2.5 2 2.679166666666667 None
28 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 17.5 16.6 15.8 15.4 15.6 16.5 18.2 22.4 27.5 25.8 24.9 24.3 26.5 23.2 11.4 19.9 20.98 30.61 29.9 28 27.1 25.1 23.72 22.52 11.4 22.059583333333332 None
28 Apr 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 1.3 1.2 1.1 1.3 1.5 1.6 1.5 1.4 3 5.3 0.2 6 0.2 0.2 0.2 0.3 0.2 0.2 5.9 6.8 9 0.1 0.2 1 0.1 2.0708333333333333 None
28 Apr 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA O/C O/C E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 1.7 2.1 - 1.7 0.2708333333333333 None
28 Apr 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL E/F E/F E/F E/F E/F E/F E/F 0.23 0.23 0.33 1.32 1.32 E/F 1.33 1.2 1.17 1.5 1.56 1.59 1.53 1.38 1.32 1.26 - 0.23 0.7720833333333336 None
28 Apr 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO ARGUNGU FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
28 Apr 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
28 Apr 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA E/F E/F E/F E/F E/F E/F E/F E/F E/F 6.1 6.8 6.3 5.6 5.6 8.3 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F - 5.6 1.6125 None
28 Apr 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.2 0.2 0.2 0.1 0.1 0 0.1 0 0.1 0.1 0 MTT MTT MTT MTT MTT MTT MTT 0.1 0.1 0.2 0.2 0.2 - 0 0.08333333333333333 None
28 Apr 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 4 6 6 6 6 4 6 6 4 4 4 4 4 4 4 4 6 6 8 8 8 8 8 4 4 5.5 None
28 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 0.4 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.5 0.6 0.6 0.6 0.7 0.8 0.8 0.9 LS LS LS LS LS LS LS LS 0.4 0.6 None
28 Apr 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 - 0.04 0.040000000000000015 None
28 Apr 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C - 4.5 0.1875 None
28 Apr 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA 1.7 1.5 1.5 1.5 1.6 2.2 2 DS DS LSD LSD LSD LSD LSD LSD 2.7 2.7 2.7 2.5 2.7 2.6 2.4 2.1 - 1.5 1.4416666666666667 None
28 Apr 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
28 Apr 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
28 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.6 0.6 0.4 0.2 0.2 0.3 0.4 0.9 0.9 1 1.2 1.2 LS LS LS LS 1.5 1.5 1.5 1.5 1.1 0.7 0.7 0.6 0 0.85 None
28 Apr 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S i/s i/s i/s i/s i/s i/s i/s i/s i/s i/s i/s i/s i/s i/s i/s i/s i/s 0 nan None
28 Apr 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 5.5 7.5 7.5 8 8.5 9.7 0.1 0.1 0.1 0.1 9.2 9.1 0 0.2 0.1 0.1 0.2 0.1 0.1 O.1 0.1 9.7 8.8 8.2 0 4.0434782608695645 None
28 Apr 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 0.4 0.4 4.5 5 5 5.5 6.9 4.4 3.6 3.6 3.2 0.4 0.5 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 - 0.4 2.041666666666667 None
28 Apr 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.4 0.4 0.4 0.4 0.6 0.6 0.8 0.9 0.8 0.8 0.9 1.1 1 0.9 0.9 1 0.8 0.6 0.6 0.4 0.4 0.4 - 0.4 0.6625000000000001 None
28 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 11 5.2 4.6 4.7 9.2 10.4 6 4 4.1 8.8 8.9 7.5 1.2 4.2 4.1 2.5 6.1 14.3 9.3 O/C 2.4 2.3 6 - 1.2 5.962500000000001 None
28 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 0.64 0.6 0.6 0.6 5.1 5.6 0.6 0.75 0.8 1 1 0.9 10.6 10.1 9.7 9.3 8.6 6.8 7 9 8.6 9 0.69 - 0.6 4.510416666666666 None
28 Apr 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA - - - FARFARU TIED TO YABO/SHAGARI FEEDER - - - - - - - - - - - - - - - - - - - - 0 0 None
28 Apr 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 2.2 2.1 1.9 1.8 1.8 1.1 0.4 0.4 0.4 2.2 3.2 MTT MTT MTT MTT MTT MTT MTT 1.2 1.5 3.9 4.3 4.1 - 0.4 1.5 None
28 Apr 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 2 3.1 MTT MTT MTT MTT MTT MTT MTT E/F E/F E/F E/F E/F - 0.8 0.5125 None
28 Apr 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 0.8 0.8 0.8 0.8 0.8 1.3 1.6 2.5 2.9 3.2 3.3 MTT MTT MTT MTT MTT MTT MTT 0.9 0.9 0.4 0.4 0.4 - 0.4 0.9249999999999997 None
28 Apr 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 7.75 3.45 7.42 6.22 5.71 7.34 11.39 10.21 3.77 8.8 9.15 9.38 9.54 11.23 9.29 O/C O/C O/C O/C O/C O/C O/C 5.96 - 3.45 5.640833333333333 None
28 Apr 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 1.25 1.3 1.25 2.15 1.95 - 1.25 0.40625 None
28 Apr 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.3 0.3 0.3 0.3 0.2 0.2 0.2 - 0.1 0.3 None
28 Apr 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA NCL/A NCL/A NCL/A NCL/A 3.5 0.1 0.1 0 4 4.6 4.5 4.2 5.6 1.7 3 2.8 1.8 E/F 4 4 1.5 2.3 5 - 0 2.3791666666666664 None
28 Apr 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 6.1 5.9 6.1 5.9 LSD LSD LSD LSD LSD LSD LSD LSD - 5.9 1 None
28 Apr 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 2 1.6 1.5 1.4 1.5 2 0.1 0.14 0.2 0.3 0.3 0.3 0.3 0.4 0.4 O/C O/C O/C O/C 0 0.1 0.1 0.1 - 0 0.5641666666666668 None
28 Apr 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 5.64 5.53 5.65 5.6 5.67 5.67 5.73 5.67 5.64 5.73 5.77 5.84 5.87 5.84 5.86 5.68 5.67 5.67 5.67 5.63 5.55 5.6 5.96 - 5.53 5.701250000000001 None
28 Apr 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.07 0.07 0.07 0.06 0.07 0.06 0.07 0.07 0.09 0.09 0.09 0.09 0.07 0.09 0.09 0.09 0.09 0.09 0.07 0.08 0.08 0.08 0.07 - 0.06 0.0779166666666667 None
28 Apr 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 5.9 5.5 5.7 5.65 8.45 6.1 6.5 E/F 7.1 7.5 5.9 6.15 6.5 6.3 6.2 8 9.3 9.1 5.8 7.45 11.4 6.5 5.9 - 5.5 6.716666666666668 None
28 Apr 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
28 Apr 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 5.8 6.2 5.9 5.4 DS DS DS DS DS DS DS DS DS - 5.4 0.9708333333333332 None
28 Apr 2026 None YAURI TR2-40MVA KOKO — KADUNA DS DS DS DS DS DS DS 0.1 0.1 0.1 0.1 MTT MTT MTT MTT MTT MTT MTT DS 0.1 0.1 0.1 DS - 0.1 0.029166666666666664 None
28 Apr 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC 7.3 EF/OC EF/OC EF/OC 3.4 7.6 8.1 8.4 NCLA NCLA 3.9 4.8 6 - 3.4 2.3 None
28 Apr 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA O/C O/C 1.8 5.7 2.7 NCL/A LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 3.4 3.7 2.5 - 1.8 0.9208333333333334 None
28 Apr 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 4.4 E/F 2.3 2.9 3.1 3.3 3.1 1.1 0.5 E/F E/F 1.1 1.2 2.4 2.3 0.5 0.9 0.9 1.1 E/F E/F 0.4 1.4 - 0.4 1.4083333333333332 None
28 Apr 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0 0 0 0 0 0 0 0 0 0.1 0 0 INST E;F 0 0.1 0.1 0.1 0.1 0 0 0 0 0 - 0 0.020833333333333332 None
28 Apr 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA 0.3 0.3 0.3 0.3 0.3 0.5 0.5 0.5 0.4 0.3 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.4 - 0.3 0.42500000000000004 None
28 Apr 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF 1.2 4.1 NCL/A LSD 4.9 4.7 4.2 3.7 - 1.2 0.9499999999999998 None
28 Apr 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.65 0.55 0.55 0.55 0.65 0.65 0.55 0.55 0.55 0.55 0.55 0.55 0.65 0.6 0.55 0.65 0.65 0.75 0.8 0.9 0.85 0.8 0.7 - 0.55 0.6437500000000002 None
28 Apr 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA EMR EMR EMR EMR EMR EMR EMR EMR EMR 4 4.1 7.9 6.5 2.4 2.2 2.1 2.1 6 6.3 4.5 4.2 4 6 - 2.1 2.8166666666666664 None
28 Apr 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0.01 0 0.01 0 0.01 0.01 0.01 0.02 0.01 0.01 0.02 MTT MTT MTT MTT MTT MTT MTT 0.01 0.02 0.01 0.01 0.01 - 0 0.007500000000000001 None
28 Apr 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 2.85 2.95 3 3.65 3.7 3.6 3.9 3.75 0.55 4 4.05 2.45 2.45 2.95 3.85 4.4 4.65 6 5.8 4.45 4.4 4.4 5.4 - 0.55 3.885416666666668 None
28 Apr 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA CBF CBF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF C/BF - 0 0 None
28 Apr 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 4.6 4.6 4.4 3.4 3.7 3.8 4 6.1 6.1 5.9 3.8 4.5 4.7 4.9 4.4 3.8 5.5 5.1 3.4 4.5 4.8 4.6 4.6 - 3.4 4.574999999999999 None
28 Apr 2026 None YAURI TR1-40MVA NGASKI — KADUNA DS DS DS DS DS DS DS DS DS DS DS MTT MTT MTT MTT MTT MTT MTT DS DS 2.6 2.7 2.3 - 2.1 0.40416666666666673 None
28 Apr 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA 1.6 1.5 1.3 1.3 1.4 1.7 1.5 2.5 2.1 3.4 3.9 4.1 3.8 3.5 3.9 LSD LSD LSD LSD LSD 2.4 2.6 2.7 - 1.3 1.9958333333333333 None
28 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC L/S L/S L/S L/S L/S L/S L/S L/S L/S LS LS LS 2.3 2.4 2.4 2.4 1.9 1.9 2.1 0.3 0.4 2 1.9 1.9 0.3 1.825 None
28 Apr 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 5.1 5 4.7 4.3 4.1 4.4 4.3 4.4 6 5.2 7 7.4 7.5 9 9.2 7.5 1.6 13.1 13.4 1.1 1.1 1.1 1.1 - 1 5.358333333333332 None
« Previous Page 73 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —