Hourly Load Profile (Unified)
Average Hourly Load Analysis
Multi-select enabled
Attribution Analysis Upload Load Report

Average Hourly Load (MW)

Detailed Hourly Readings
Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
06 May 2026 None None T2- 60MVA CONFLUENCE — AEDC 7.9 7.8 7.8 7.7 9.1 0.1 0.1 0.1 0.1 0.1 0.1 5.5 9.2 8.5 8.3 0.1 0.1 0.1 0.1 0.1 10.6 9.9 8.9 8.3 0.1 4.6083333333333325 None
06 May 2026 None None T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 1.3 1.2 1.1 1 0.7 0.4 0.2 0.1 0.1 0.2 0.2 0.3 1.5 1.5 1.6 1.6 1.5 1.2 1.1 0.1 2.5 1.5 1.5 1.8 0.1 1.0083333333333335 None
06 May 2026 None None TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
06 May 2026 None None T1- 30MVA STEELPLANT — AEDC 0.1 0.3 0.3 0.3 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.3 0.3 0.3 0.1 0.1 0.16666666666666666 None
05 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0 nan None
05 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC LS/D LS/D LS/D LS/D LS/D 2.5 LS/D LS/D LS/D 2.02 1.67 1.58 1.5 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.5 1.67 1.42 1.25 1.25 1.79 None
05 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0 nan None
05 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0 nan None
05 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC LS/D LS/D LS/D LS/D LS/D 0.57 0.45 0.42 0.58 1.68 0.6 0.73 0.67 0.63 1 0.72 0.5 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0.42 0.7124999999999999 None
05 May 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 1.5 1.5 1.5 1.5 1.5 1.6 1.9 2.4 2.72 2.65 2.6 2.65 2.7 2.65 1.2 2.8 2.8 2.6 1.6 2.4 2.3 1.8 0.7 0.7 0.7 2.01125 None
05 May 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 3.35 4.5 5.3 5.3 5.3 5.35 5.35 I/S 4.45 4.05 0.25 I/S I/S I/S I/S I/S I/S I/S INST.O/C.E/F INST.O/C.E/F INST.O/C.E/F INST.O/C.E/F INST.O/C.E/F INST.O/C.E/F 0.25 4.32 None
05 May 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 0.4 0.5 1.7 2 2.1 2.5 2.6 3.1 2.9 2.3 2.6 2.2 2.5 2.4 2.4 2.8 0.8 0.8 0.9 0.5 E/F 2.2 2.1 2 0.4 1.9260869565217387 None
05 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 4 3.7 3.7 3.6 3.9 3.7 3.6 4.1 3.7 4.3 4.1 4.1 3.8 3.3 3.4 4.3 3.8 3.6 3.8 4.3 4.3 E/F 4 3.3 3.3 3.8434782608695643 None
05 May 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC 16.2 15.1 14.3 13.9 15.2 18.2 16.75 20.35 19.95 17.3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 15.6 20.9 18.75 16.55 17.6 13.9 17.110000000000003 None
05 May 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.7 0.6 0.6 0.6 0.7 0.9 0.75 0.6 0.9 0.65 0.6 0.65 0.65 0.95 0.55 0.65 0.75 0.85 E/F 1 0.9 0.75 0.7 0.7 0.55 0.726086956521739 None
05 May 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC 10.9 11.2 11.2 10.9 11 12.1 11 7.35 6.9 8.2 8.2 8.3 8.45 8.7 9 9.2 10.25 1.05 E/F 13.7 13.05 12.45 11 10.4 1.05 9.76086956521739 None
05 May 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC LS/D 13.9 12.6 11.9 12.3 14 18.6 14.9 15.95 16.15 15.5 15.35 15.5 15.9 16.95 17.3 17.8 18.5 INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C 11.9 15.476470588235296 None
05 May 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC I/S I/S I/S I/S I/S I/S 0.4 0.4 .0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 I/S I/S I/S 0.4 0.4 None
05 May 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 10.6 10.3 10.1 12.9 13.9 8 11.9 12.8 9.9 11 14.6 14.6 9.6 9.8 14.8 inst. o/c inst. o/c inst. o/c inst. o/c 8.4 E/F E/F E/F E/F 8 11.450000000000001 None
05 May 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC 1.5 1.4 1.4 1.4 1.5 7.9 2.1 7.8 5 6.5 6.3 6.3 1 1 1 1.1 1.2 1.2 1.2 E/F E/F 6 6 5.4 1 3.3727272727272735 None
05 May 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF 1.9 1.9 2 2 2.2 2.2 2.1 2.2 4 3.8 3.6 3.4 INST O/C 1.9 2.6083333333333334 None
05 May 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
05 May 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 15.8 15.9 15.4 15.2 17.2 18.5 19.3 15.7 17.2 18.7 13 INST. O/C INST. O/C 3.1 4.1 INST. O/C 1.4 6.4 I/S INST. O/C 6.3 14.3 16.1 15.3 1.4 13.1 None
05 May 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 4.92 4.41 4.35 4.56 5.23 4 5.26 6.03 7.38 8.35 8.62 9.45 5.81 7.84 8.3 9.44 8.33 7.49 6.35 6.37 5.93 5.5 4.76 4.09 4 6.365416666666666 None
05 May 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 4.3 4.3 4 3.9 4.2 4.2 INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF INST. OC&EF 2 4.4 5.2 5 4.8 4.5 4.6 5.3 5.2 4.8 4.7 4.5 2 4.438888888888888 None
05 May 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 9.29 8.1 7.79 7.94 7.18 9 9.33 10.58 12.67 16.38 13.49 16.48 15.88 19.17 19.57 20.1 17.55 16.98 15.26 16.29 14.99 13.79 9.87 12.83 7.18 13.354583333333332 None
05 May 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 3.05 2.73 2.67 2.71 2.55 3 3.89 5.34 6.39 8.14 7.86 9.87 6.59 7.92 9.5 8.98 8.77 4.53 5.08 5.22 4.32 3.8 3.08 1.41 1.41 5.308333333333333 None
05 May 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 6.58 6.01 5.93 6.3 4.5 6.01 7.97 11.49 14.47 16.11 4.21 0.05 12.75 17.26 13.37 20.97 14.49 13.53 10.04 9.57 7.98 6.93 5.5 7.17 0.05 9.549583333333333 None
05 May 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 14.99 12.64 12.42 12.42 11.25 15.68 9.27 11.93 11.99 19.69 12.4 15.95 19.3 22.33 21.71 22 21.89 17.01 10.78 12 12.75 12 9.6 15.59 9.27 14.899583333333332 None
05 May 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
05 May 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 11.5 9.98 9.84 9.04 OC/EF OC/EF OC/EF OC/EF 0.09 10.5 14.3 11.3 3.3 7.8 8.08 9.06 9 10.26 9.92 14.52 17.89 18.8 19.28 20.04 0.09 11.225 None
05 May 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
05 May 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 11.5 11 10.6 10.5 10.8 12.3 11.4 9.7 9.4 9 9 9.1 9.4 10 10.1 10.3 10.8 11.6 INST. E/F & O/C INST. E/F & O/C 7.8 7.8 7.3 6.6 6.6 9.81818181818182 None
05 May 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 11.8 11.3 10.9 10.5 10.4 11 10.5 15 15.5 15.4 15.6 15 15.7 16.3 16.5 16.8 13.8 18 0.7 1.5 0.95 17 20.5 18.2 0.7 12.868749999999999 None
05 May 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
05 May 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
05 May 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S 0.39 0.29 I/S I/S I/S I/S 0.32 0.32 I/S I/S I/S I/S I/S I/S I/S I/S 0.29 0.33 None
05 May 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.37 1.28 1.27 1.23 1.22 1.34 1.15 0.97 0.95 0.94 0.97 0.95 1 0.9 1.01 1.03 1.12 1.16 1.25 1.38 1.51 1.55 1.56 1.39 0.9 1.1875000000000002 None
05 May 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 8.8 8.45 8.15 8.05 8.2 9.25 10.2 11.65 13.8 13.8 14.6 15.4 13.7 14.75 15.25 14.3 13.4 11.9 11.15 11.05 10.4 10.3 INST/OC INST/OC 8.05 11.661363636363637 None
05 May 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 4.85 4.5 4.25 4.15 4.4 4.95 5.45 6.6 8.45 8.45 9.05 9.4 9.7 10.3 8.55 9.95 8.4 8 7.25 6.75 5.2 6.55 5.55 5.2 4.15 6.9125000000000005 None
05 May 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
05 May 2026 None 132KV APO TS TR1 60MVA 33KV FDR H15 132KV APO TS_33KV FDR H15_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10000000000000003 None
05 May 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H2 132KV APO TS_33KV FDR H2_PL_PL AEDC 4.5 4.25 4.15 4.1 4.15 4.55 4.6 4.9 5.6 5.6 6.6 6.85 6.6 7.1 6.4 6.95 6.6 6.05 5.4 5.05 5.15 5.15 INST/EF 4.7 4.1 5.434782608695653 None
05 May 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H21 132KV APO TS_33KV FDR H21_PL_PL AEDC 16.05 14.8 13.8 13.2 14.35 13.6 12.5 8 13.75 12.4 12.05 11.8 8.45 9.3 9.65 6.8 11.45 14.2 16.4 17.3 14.8 12.85 INST/EF 10.75 6.8 12.532608695652176 None
05 May 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H23 132KV APO TS_33KV FDR H23_PL_PL AEDC 10.8 10.4 10.4 7 7.4 8.2 7.6 9.6 9 15.2 15.2 13.2 13 12.4 12.6 13 BC BC 8 10.4 10.2 9.8 INST/OC 7.8 7 10.533333333333335 None
05 May 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H3 132KV APO TS_33KV FDR H3_PL_PL AEDC 13.2 12.8 12.35 11.7 11.8 12.35 14 15.15 17.6 18 19.5 19.5 20.45 18.9 19.95 19.7 17.6 16.5 16.65 15.6 15.55 11.7 11.15 11.2 11.15 15.5375 None
05 May 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H31 132KV APO TS_33KV FDR H31_PL_PL AEDC 16 15.05 14.45 14.25 14.5 16 3 11.6 12.1 12.1 12.4 12.25 LS/D LS/D LS/D 17.5 12 14.1 16.05 20.6 19.9 LS/D LS/D 11.6 3 13.971052631578948 None
05 May 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC 20.1 18.95 18.15 17.55 18.4 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 16.3 17 19.25 20.3 21.1 22.35 19.6 16.8 16.8 INST/EF INST/EF INST/EF 16.3 18.760714285714283 None
05 May 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 6.05 5.6 5.3 5.2 5.35 9.65 6 5.05 5 4.45 5 4.7 2.75 2.7 2.8 5.7 6.2 6.5 7.5 4 7.35 10.95 INST/EF 4.3 2.7 5.569565217391304 None
05 May 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 6.4 6 5.7 5.4 5.4 5.6 5.55 4.8 4.7 4.75 3.95 3.9 4 4.05 5.05 5 5.1 5.4 6.8 7.05 7.05 7.2 5.1 6 3.9 5.414583333333333 None
05 May 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 15.35 9.7 9.45 9.35 9.8 10.45 10.95 12 12.85 12.85 13.2 13.05 19.45 19.75 19.5 12.05 18.05 16.95 17.9 17.1 16.95 18.75 14.55 14.7 9.35 14.362499999999999 None
05 May 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.45 1.65 1.7 1.65 1.65 1.3 0.465 1.45 2 2 1.85 2 2.25 2.25 2.35 2.2 2.4 2 2.2 0.6 1.45 1.8 1.05 4.65 0.465 1.8485416666666665 None
05 May 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC 13.7 12.8 12.4 12.1 12.8 14.3 12.4 11.2 8.9 9.3 8.4 9.1 9.2 7.5 9.9 5.3 10.8 15.4 17.4 LS/D LS/D 18 13.2 12 5.3 11.640909090909092 None
05 May 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC 15.6 14.5 13.9 LS/D LS/D LS/D LS/D LS/D LS/D 18.6 16 15.5 16.8 17.23 7.5 17.8 16.6 17.2 LS/D LS/D LS/D LS/D LS/D LS/D 7.5 15.6025 None
05 May 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC LS/D LS/D LS/D 6.7 6.8 8 7.1 6.4 5.8 5.7 LS/D LS/D LS/D LS/D 6.3 6.3 6.4 7.6 LS/D LS/D LS/D LS/D LS/D LS/D 5.7 6.645454545454545 None
05 May 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC E E E E E E E E E E E E E E E E E E 8.8 14.5 13.7 13.2 11.4 10.3 8.8 11.983333333333334 None
05 May 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC E E E E E E E E E E E E E E E E E E 17.6 20.7 19.4 LS/D LS/D 14.4 14.4 18.025 None
05 May 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC LS/D LS/D LS/D 9.3 9.6 10.9 10.2 9.2 8.8 E LS/D LS/D LS/D LS/D LS/D L S /D L S /D L S /D 12.1 LS/D LS/D 12.2 10.4 LS/D 8.8 10.3 None
05 May 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 15 15 13.4 13 12.7 13.8 13.1 12.1 15.7 14.8 14.3 14 14.4 14.8 15.4 16 O/C 2.1 2.2 2.3 O/C O/C O/C O/C 2.1 12.321052631578949 None
05 May 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 5.9 5.6 5.5 5.5 5.7 6.7 6.3 5.7 5.8 5.5 6 5.9 5.9 5.8 7.1 6.3 7.6 7.7 10.6 12.3 11.6 10.8 E/F 5.1 5.1 6.995652173913043 None
05 May 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 7.5 7.7 8.2 8.4 8.5 10 8.8 14 14.5 14.2 13.7 13.4 13.4 13.7 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 0.1 I/S 0.1 10.406666666666666 None
05 May 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 2.9 3.3 4.3 4.4 E/F E/F E/F E/F E/F E/F E/F E/F 2.9 3.725 None
05 May 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 4.4 4.5 4.2 4.2 4.2 4.4 4.4 4 4.3 4.2 4.4 4.4 4.5 4.6 4.6 4.6 4.7 4.8 5.4 5.7 5.7 5.6 INST. E/F 4.8 4 4.634782608695652 None
05 May 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - 10.2 - - - - - - - - - - - - 10.2 10.2 None
05 May 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 10.8 10.9 10.4 10.1 10.3 10.6 10.4 10.5 10.7 12.6 13.1 14.1 14 14.4 14.7 14 14.6 13.8 13.8 13.7 13 12 12.6 12 10.1 12.379166666666668 None
05 May 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 9.3 8.8 8.6 2.3 2.3 7.5 7.3 7 7.9 7.4 7.5 7.6 7.7 14.2 8 6.7 13.6 12.5 12.8 13.5 12.9 14.5 E/F & O/C 1.7 1.7 8.765217391304349 None
05 May 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 1.6 1.6 3.3 3.3 2.8 3.1 3.2 4.1 5.9 6.9 6.4 7.1 6.8 7.5 7.1 5.7 5.4 4.5 4.3 5 5.1 6.6 2.1 2.6 1.6 4.666666666666665 None
05 May 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C E/F E/F 1.8 4.7 4.5 4 2.1 1.8 1.8 3.1500000000000004 None
05 May 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 10 10 9.6 9.5 9.7 9.6 5.6 10.6 12.9 8.5 12.8 11.8 11.6 13 13.8 11.4 12.8 11.8 INST. E/F 12.6 12.3 11.3 10.9 10.4 5.6 10.97826086956522 None
05 May 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
05 May 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 1.6 1.65 1.65 1.6 1.6 1.8 1.7 1.7 1.6 7.5 0.25 0.25 0.25 0.2 0.4 0.3 0.3 2.2 0.2 0.15 0.2 0.2 0.15 0.15 0.15 1.1499999999999997 None
05 May 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 7.75 7.25 7.5 7.4 5 2.05 2.2 0.3 INST.O/C.E/F 2 2.2 2.2 1.25 1.25 0.2 2.1934782608695653 None
05 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 4 3.8 3.7 3.7 3.6 4 4.1 3.8 4 3.9 4.2 5.6 5.6 5.8 5.8 5.6 6 6 6.9 7.2 7.1 E/F E/F E/F 3.6 4.9714285714285715 None
05 May 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 14.1 13.4 12.7 12.2 12.1 12.9 12.4 11.7 12.01 11.05 10.85 11 11.35 11.35 12.4 13.6 13.83 14.14 9.2 16.1 15.6 15.4 14.9 13.5 9.2 12.824166666666665 None
05 May 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 7.2 7 6.9 OC/EF OC/EF OC/EF OC/EF 4 5.8 6.5 7.5 8.4 9.8 6.5 6.8 OC/EF OC/EF OC/EF OC/EF OC/EF 6.8 6.7 6.5 6.4 4 6.853333333333334 None
05 May 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 1.65 1.7 1.7 1.4 1.5 1.05 1 1.5 1.85 1.45 2.3 1.85 1.75 1.55 1.85 2.2 2.1 1.3 INST.O/C.E/F 1.2 1.35 1.4 1.4 1.5 1 1.5891304347826085 None
05 May 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 1.2 1 1 5 5.3 5.8 8.6 OC/EF OC/EF OC/EF OC/EF 1 3.9857142857142853 None
05 May 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 14.7 13.9 13.5 13.2 13.5 15.2 15.7 15.2 15.68 14.75 14.8 15 14.9 15.05 15.45 L/S 17.81 7.16 INST,E/F&O/C E/F E/F E/F E/F E/F 7.16 14.441176470588237 None
05 May 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 14.7 13.9 13.4 14.3 15.6 16.1 14.6 12 11.8 L/SG 4.1 14.2 14.7 L/SG 8 17.3 5.2 17.9 INST. O/C 7.2 21 19.9 16.7 15.9 4.1 13.738095238095235 None
05 May 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D INST.E/F INST.E/F INST.E/F 5.6 7.85 8.6 8 9.85 6 8.5 7 INST O/C INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F 5.6 7.675 None
05 May 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D 9.75 9 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 6 8 13 6.35 INST. E/F 14.65 13.85 12.5 9.9 9.5 6 10.227272727272727 None
05 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 2.7 2.6 2.5 4.7 4.8 5.5 5.7 5 3 3 3.2 5.5 5.6 5.6 5.8 3.2 LS/D LS/D LS/D 2.3 6.5 E/F 4.8 4.9 2.3 4.345000000000001 None
05 May 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 8.5 8 7.8 7.6 7.7 6 3.35 3.6 3.7 3.65 7.3 13.1 LS/D LS/D 4.4 4.4 4.6 LS/D E/F E/F E/F E/F E/F E/F 3.35 6.246666666666667 None
05 May 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 2.1 2 1.9 1.8 1.1 1.4 1.4 I/S I/S I/S I/S I/S I/S I/S I/S I/S 3 3.2 3.3 1.1 O/C O/C O/C O/C 1.1 2.027272727272728 None
05 May 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 10.9 10.4 10.1 9.7 9.7 10.3 9.6 8.55 8.78 7.95 7.85 7.95 1.2 7.45 8 9.9 10.46 11 INST.E/F 1.1 1 15.4 13.9 12.2 1 8.84304347826087 None
05 May 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
05 May 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 1 0.9 0.9 0.9 1 1.1 1.2 1.2 1.3 1.3 1.4 1.4 1.4 1.4 1.4 SG SG SG SG 1.1 1.1 1.1 1 0.9 0.9 1.1500000000000001 None
05 May 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 1.9 1.8 1.7 1.7 1.9 2.3 2.2 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.7 SG SG SG SG 1.7 2.8 2.7 2.5 2.3 1.7 1.9900000000000002 None
05 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.5 0.5 0.5 0.5 0.4 0.5 0.6 0.6 0.6 5.8 7.3 8.8 8.9 8.6 8.6 8.4 0.5 0.6 0.6 0.6 0.7 E/F 0.4 0.6 0.4 2.830434782608696 None
05 May 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 11.9 E/F E/F E/F E/F E/F E/F 7.25 6.35 8.9 5.5 8.2 8 12.15 12.25 12.7 5.75 6.2 6.2 7.55 10.9 11.9 11.05 9..4 5.5 8.98529411764706 None
05 May 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 3 2.9 2.9 5.2 6.8 9 9.2 7 0.7 0.7 0.6 0.6 3.9 4 4.8 0.7 0.6 0.6 4 4.2 4.6 5.2 5 4.8 0.6 3.7916666666666674 None
05 May 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC E/F E/F E/F E/F E/F E/F 0.4 0.5 0.6 0.7 0.7 0.8 E/F E/F E/F E/F 0.8 2.5 E/F E/F E/F E/F E/F E/F 0.4 0.875 None
05 May 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1.3 1.3 1.3 1.4 1.9 2.6 3 2.3 2.5 3.5 3.6 E/F E/F 3.8 1.2 1 4.4 4.5 5 4 4.7 4.6 E/F E/F 1 2.8950000000000005 None
05 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 2.5 2.4 2.4 2.6 2.4 2.3 2 2.6 3.1 2.9 3.4 2.4 2.7 3 3.1 3.5 2.2 2.2 2.1 2.3 2.3 E/F 2.5 2.9 2 2.6 None
05 May 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 7.4 6.9 6.95 6.7 7.55 8.1 11.5 10.3 6.25 9.3 6.45 6.8 6.85 6.5 7.15 7.7 I/S I/S I/S I/S I/S 10.75 0 12.25 0 7.652631578947369 None
05 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 E/F E/F E/F 0.1 0.1 0.1 11.6 13 12.1 E/F E/F E/F 0.1 0.1 0.1 2.1222222222222222 None
05 May 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2.9 3.1 3 2.9 3.2 3.7 3.4 3.2 2.5 2.7 2.6 2.7 2.6 2.8 2.8 3 2 2.8 2.5 LS/D LS/D 2.5 2.5 2.1 2 2.795454545454545 None
05 May 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 20.3 19.2 18.4 18.1 18.1 19.3 21.3 25.4 29.7 27.15 25.75 INST. O/C 28.6 28.95 INST. O/C INST. O/C 27.26 26.04 23.3 22.9 25.3 21.9 20.7 19.1 18.1 23.178571428571427 None
05 May 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 1.6 1.6 1.6 1.7 1.7 2.1 2 0.8 0.9 0.4 0.4 0.4 1 S.G S.G 0.1 0.2 0.2 0.2 1 2 1.9 1.7 1.6 0.1 1.1409090909090909 None
05 May 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
« Previous Page 64 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —