Hourly Load Profile (Unified)
Average Hourly Load Analysis
Multi-select enabled
Attribution Analysis Upload Load Report

Average Hourly Load (MW)

Detailed Hourly Readings
Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
16 May 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC 17.15 16.15 15.4 14.95 14.8 15.95 INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F 4.85 4.7 4.7 7.9 8.2 8.05 23.05 20.6 25.35 LS/G LS/G LS/G 24.35 4.7 14.134375 None
16 May 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 5.5 7.15 6.6 6.5 6.4 6.65 7 7 6.9 7.1 7.15 7.1 7.15 7.6 7.9 7.9 7.95 8.2 9.2 10 10.3 9.6 6.5 LS/D 5.5 7.536956521739131 None
16 May 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 5.5 5.25 5.1 4.9 4.8 4.6 3.4 3.6 3.45 4.4 4.35 4.55 4.5 4.85 4.9 4.9 4.6 5.05 5.85 6.4 3.2 3 3.1 6.65 3 4.620833333333334 None
16 May 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 5.95 8.35 7.85 7.65 5.6 5.7 5.6 11.25 10.6 10.65 10.25 11.6 10.9 11.6 11.65 11.05 11.05 LSD 13.2 13 15 14.35 14.4 13.35 5.6 10.460869565217392 None
16 May 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.95 1.65 1.65 1.65 1.6 1.2 0.1 1.7 0.95 2.05 2.3 1.5 1.1 2.4 2.2 1.95 2.2 0.85 1.45 0.9 1 1.55 2.1 1.9 0.1 1.5791666666666664 None
16 May 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC 13.2 12.1 11.5 11.3 11.5 12.4 12.7 12.5 12.5 12.6 12.7 12.7 13.1 13.3 13.5 13.7 13.7 13.8 15.3 16.8 LS/D LS/D 16.2 14.5 11.3 13.254545454545452 None
16 May 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC LS/D 7.5 7 6.7 6.8 7.4 7.9 8.1 7.9 11.6 18.5 16 SG SG SG SG 19.5 18 LS/D LS/D LS/D LS/D LS/D LS/D 6.7 10.99230769230769 None
16 May 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC LS/D 5.8 5.1 4.7 4.7 4.7 5.3 5.3 5.2 5.2 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 8.7 8 LS/D LS/D LS/D 6.8 4.7 5.791666666666667 None
16 May 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC 11.5 10.6 10.1 9.1 9.4 13 14.3 12 11.3 13.9 LS/D LS/D LS/D LS/D LS/D LS/D INST OC INST OC INST OC INST OC 10.6 10.3 14 11.5 9.1 11.542857142857143 None
16 May 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC 12.1 E E E E E E SG SG SG 16.5 15.7 14.9 15.8 16 16.5 LS/D LS/D LS/D LS/D 17.9 17.5 LS/D LS/D 12.1 15.877777777777778 None
16 May 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC LS/D LS/D LS/D 7.4 7.3 8.1 8.3 8.3 9.2 8.2 LS/D LS/D 8.6 8.9 9.2 9.1 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 10.5 7.3 8.591666666666667 None
16 May 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC O/C O/C 13.1 10.8 10.2 9.2 O/C 10.8 14 13 13.1 12.8 12.8 12.8 13.1 15.8 16.6 17.2 LS/D LS/D 3.1 2.9 13.8 LS/D 2.9 11.95 None
16 May 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 12.8 8.94 12.38 12.07 12.48 13.2 14.54 10.25 10.3 10.4 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5.9 12.3 15.4 15.5 14.2 13.1 LS/D 5.9 12.11 None
16 May 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 15.8 12.5 11.9 11.6 11.5 12.4 13 13.8 13.8 10.4 14.5 14.8 14.9 15.2 LS/D 14.8 15.9 16.1 17.2 17.8 O/C O/C O/C 15.3 10.4 14.16 None
16 May 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 9.2 8.9 8.46 8.42 8.69 9.73 11.77 E/F 11.4 10.5 10.4 10.5 10.9 10.4 10.6 10.7 I/S I/S 13.4 LS/D LS/D LS/D LS/D LS/D 8.42 10.248125 None
16 May 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 3.8 3.8 3.7 3.5 3.3 3.3 3.5 3.4 3.3 3.5 3.6 3.7 3.8 3.9 3.9 4 4 3.8 4.3 4.8 4.9 5 4.7 4.5 3.3 3.9166666666666665 None
16 May 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
16 May 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 10.8 10.6 10.2 9.9 9.6 9.5 9.2 8.3 9.7 10.3 10.7 11 11.4 11.9 11.8 E 12.6 11.8 12.9 13.6 13.3 13.1 12.7 12.3 8.3 11.182608695652174 None
16 May 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 11.6 9.7 14.8 14.1 14.4 11.8 11.7 11.7 3.2 3.3 3.3 12 17.9 16.6 3.2 11.15 None
16 May 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 4.4 4.4 4.3 4.1 4 4.3 4.9 5.2 6.5 5.7 6.1 5.8 5.3 6.4 5.1 3.9 5.1 5.7 5.1 4.9 4.9 4.9 4.9 4.7 3.9 5.025000000000001 None
16 May 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S 3.3 E/F 5.1 4.7 4.8 4.8 4.7 4.8 5 4.9 5.1 4.9 4.7 4.2 3.8 2.5 2.5 4.486666666666666 None
16 May 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 10 9.6 9.4 9 8.8 8.6 8.4 9.2 9.3 9.4 9.6 9.6 9.3 10.2 10.6 8.8 10.3 10.5 11.8 12.3 12.1 11.8 11.5 10.9 8.4 10.041666666666668 None
16 May 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
16 May 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 0.2 0.25 0.25 0.25 0.25 0.25 0.3 0.4 0.4 0.4 0.4 0.55 0.55 0.55 0.5 0.45 0.4 0.4 0.4 0.4 0.4 0.4 0.35 0.4 0.2 0.3791666666666667 None
16 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GANFENG-PENSTOCK FDR — AEDC 8.6 8.6 8.5 9 8.2 8.3 7.6 7.8 N/S N/S N/S N/S 0.2 4.5 0.6 1.8 1.8 2 2.1 4.3 7.6 7.7 7.7 7.6 0.2 5.725 None
16 May 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 1.75 1.75 1.6 1.5 1.75 1.7 1.8 1.8 1.75 1.9 4.4 5 2.15 1.85 1.9 2.2 8.45 8.15 8.2 5.5 2 2.1 1.9 1.75 1.5 3.0354166666666664 None
16 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 4.6 4.2 4.3 4.2 4.3 5 5.6 5.3 N/S N/S N/S N/S N/S N/S 6.2 3.9 E/F E/F 4.2 7.1 6.9 6.5 6 5.7 3.9 5.250000000000001 None
16 May 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 12.5 11.9 11.3 11.1 10.9 10.9 10.2 10.5 11 10.9 11.2 11.6 12.1 12.1 11.8 12.1 LS/G 14.9 14.2 INST E/F INST E/F EMERG EMERG EMERG 10.2 11.733333333333334 None
16 May 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC E/F E/F 1.9 2.1 3.1 4 4.8 5.4 8.2 8.6 8.4 7.5 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4 3.3 2.3 2.3 1.9 4.707142857142856 None
16 May 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 1.75 1.5 1.5 1.25 1.75 1.35 1.3 1.85 2.2 2.3 2.4 2.3 2 1.85 1.9 1.8 2.3 1.3 1.1 1.65 1.7 1.8 1.95 1.95 1.1 1.7812500000000002 None
16 May 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC 4 3.8 3.9 4 4.3 4.8 5 5.2 5.5 2.1 0.6 O/C&E/F O/C&E/F O/C&E/F O/C&E/F 0.8 1.2 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 0.6 3.476923076923077 None
16 May 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 14.5 13.3 INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F 5.4 S/G S/G S/G 10.7 17.2 16.6 16 16.2 17 17.7 17.9 17 16.1 15.1 5.4 15.05 None
16 May 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 14.6 13.2 12.9 12.9 13.3 14.2 14.8 15 15.7 INST.E/F SG SG 4.9 LS/G LS/G LS/G 17.4 11.8 18 EMRG EMRG EMRG EMRG EMRG 4.9 13.746153846153847 None
16 May 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC 2.25 2.5 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 8.3 8 7.65 8.8 6.85 INST. E/F INST. E/F INST. E/F 4.4 6.2 7.35 2.25 6.23 None
16 May 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC 6 6 6.25 6.5 6.65 6.5 8.55 8.75 9.2 7 5 5.25 7.65 7.9 7 9.35 LS/G 7.95 6.15 9.5 7.1 7.1 5.1 6.95 5 7.104347826086957 None
16 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 2.5 4 4.2 3.3 4.6 3.6 4.3 4.3 N/S N/S N/S N/S N/S 4.5 8.8 7.3 3.1 3 3.1 3 3 2.6 2.6 2.5 2.5 3.9105263157894736 None
16 May 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 15.2 6.7 6.4 6.2 6.3 6 5.8 7.2 7.2 7.5 10.9 10.8 16.6 16.5 LS/G LS/G 5.2 5.1 5.4 5.8 6.05 12.4 11.2 9.3 5.1 8.625000000000002 None
16 May 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 1.9 1.9 1.9 1.8 1.8 2.2 2.4 I/S I/S I/S I/S I/S I/S I/S I/S 2.5 2.4 2.5 1.6 I/S I/S 0.9 2.4 1 0.9 1.9428571428571426 None
16 May 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 10.1 9.5 9 8.3 8.2 8.5 8.3 8 7.4 8 8.4 8.7 9.4 9.5 8.7 8.9 9.2 9.7 10.9 12 11.9 11.56 11.4 11 7.4 9.440000000000001 None
16 May 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
16 May 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.9 0.9 0.8 0.8 0.9 1 1.1 1.1 1.3 1.4 1.3 1.4 1.4 1.4 1.4 1.5 1.4 1.3 1.4 1.4 1.4 1.1 1.1 1 0.8 1.1958333333333333 None
16 May 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 1.8 1.6 1.6 1.5 1.6 1.6 1.8 1.8 1.9 1.9 1.9 1.9 2.1 2 2.1 2.1 2 2.1 2.2 2.6 2.6 2.5 2.3 2.1 1.5 1.9833333333333336 None
16 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.6 0.6 0.6 0.6 0.4 0.5 0.5 0.5 0.7 0.6 0.7 0.6 0.6 0.5 7 8.4 0.5 0.6 0.5 0.6 0.6 0.6 0.6 0.6 0.4 1.166666666666667 None
16 May 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 11.6 5.1 6 4.8 4.6 4.6 4.6 8.6 8.8 8.8 8.9 13.3 13.1 13.6 13.7 13.5 13.4 13.7 14.25 LS/G LS/G 12 7.1 7.1 4.6 9.59772727272727 None
16 May 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 4.9 4.8 4.9 5.4 5.8 6.8 7 5.5 3 0.6 0.6 0.6 0.6 0.6 0.6 4.3 LS/D LS/D LS/D LS/D LS/D LS/D 4.4 4.2 0.6 3.5888888888888895 None
16 May 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.5 0.5 3.1 6 7 7.2 8 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 0.5 4.614285714285714 None
16 May 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1.1 1.1 1.1 1.2 1.3 2 2.5 2.4 2 1.8 1.6 3.6 6.2 6.6 6.8 6.2 6 4.5 9 9.2 8 7.8 6.4 6.2 1.1 4.358333333333333 None
16 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 3.8 3.5 3.4 1.1 3.6 3.4 3.1 3.3 3.6 4.1 4 3.8 1.6 3.8 4 4.2 3.9 1.3 3.6 3.7 3.4 3.8 3.8 3.6 1.1 3.391666666666666 None
16 May 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 6.75 5.75 6.25 6.65 7.7 7.05 7.7 8.55 14.25 12 11 10.25 10.05 6.6 7.5 I/S I/S I/S I/S 8.2 9.45 7 7.7 8.3 5.75 8.434999999999999 None
16 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 8.1 8.1 8.1 0.1 0.1 0.1 E/F E/F 0.1 1.1909090909090911 None
16 May 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2 2 2 2.1 2.3 2.4 2.5 2.8 2.7 2.8 2.9 3 2.2 2.5 2.7 2.5 2.8 2.7 2.7 3 2.8 1.8 L/S 1.5 1.5 2.4652173913043476 None
16 May 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 19.4 18.4 17.6 23.5 13.3 13.3 17.9 18.5 18.7 17.7 S/G S/G S/G 19.1 25.3 24.6 27.1 26.2 26.95 22.6 22.9 17.5 17.1 18 13.3 20.26904761904762 None
16 May 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 1.1 1.1 1.1 1.1 1.2 1.4 1.6 5.8 5.7 5.5 0.8 0.8 5.2 0.9 5.3 0.9 5.6 5.6 5.7 1 5.3 0.9 0.7 4.3 0.7 2.858333333333333 None
16 May 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
16 May 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 4 4 4 5 5 6.8 8 7 6 7 6 6 7 8 7 2.2 7 8 9.2 8.6 7 6 6 6 2.2 6.283333333333334 None
16 May 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.4 0.5 0.4 E E E 0.1 0.1 0.4 0.4 0.4 0.4 0.1 0.20476190476190476 None
16 May 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.3 0.3 0.3 0.1 0.1 0.1 0.1 0.7 0.7 0.6 0.8 0.7 0.3 0.2 1 E E E 0.8 0.8 0.8 0.2 0.4 0.7 0.1 0.47619047619047616 None
16 May 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
16 May 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 7.5 7.2 7.2 7.4 8.1 8.8 0.1 0.1 0.1 0.1 7.7 9.3 9.1 8.6 0.1 0.1 0.1 0.1 0.1 0.1 10.6 10 9.1 8.3 0.1 4.995833333333331 None
16 May 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 1.8 2 2 2 2 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 1.6 1.7 1.8 E E E I/S 0.1 2.5 2.2 2 1.8 0.1 1.8076923076923077 None
16 May 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
16 May 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.1 0.2 0.2 0.2 0.2 0.1 0.3 0.3 0.3 0.3 0.3 0.1 0.1 0.2 0.3 0.2 0.3 0.1 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.2041666666666667 None
15 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.35 3.85 4.17 3.33 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 3.33 3.925 None
15 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC LS/D LS/D 1.33 1.33 1.92 2 2.42 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2 1.67 1.5 1.33 1.33 1.7222222222222223 None
15 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC 2.33 2.33 2.33 2.67 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.33 3.67 3.33 3 LS/D LS/D 3.67 3.5 LS/D LS/D LS/D LS/D 2.33 3.1160000000000005 None
15 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D I/S I/S I/S I/S LS/D I/S I/S I/S LS/D LS/D LS/D LS/D 0 nan None
15 May 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC 0.37 0.27 0.27 0.33 0.53 LS/D LS/D LS/D LS/D LS/D 0.28 0.3 0.53 0.52 0.58 0.6 0.35 0.35 0.33 0.4 0.35 0.3 0.28 0.28 0.27 0.38 None
15 May 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 1.3 1.3 1.3 1.3 1.4 1.4 1.9 2.2 2.4 2.3 2.2 2.3 2.2 2.2 2.1 2.2 2.1 2 2 2 2.1 1.8 1.6 1.5 1.3 1.8791666666666667 None
15 May 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 5.3 2 4.15 5.35 4.25 5 5 0.55 1.55 5 1 0.5 5.15 5 4 3.95 0.5 0.5 3.25 1.05 5 5 4 0.05 0.05 3.2125 None
15 May 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 1.4 2.1 2.1 2.5 3.1 3.6 3.9 4.2 4.3 1.9 2.4 2.5 2.1 0.2 2.6 2.5 2.5 2.3 2.7 2.6 2.5 0.8 1.6 2.3 0.2 2.4458333333333333 None
15 May 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 4.1 4.2 4.2 4.2 3.8 4 4.1 4 3.7 3.7 4.4 4.2 4.2 4.2 3.6 3.7 3.7 4.4 4.2 4.2 4.4 4.2 4.3 4.1 3.6 4.075000000000001 None
15 May 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC 17.6 16.7 16 18.9 18.05 21.65 20.5 18.2 17.9 17.2 LS/G LS/G LS/G 16.7 20.2 15 20.2 20.6 LS/G LS/G LS/G LS/G LS/G LS/G 15 18.359999999999996 None
15 May 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.6 0.6 0.6 0.6 0.7 0.75 0.7 0.6 0.5 0.5 0.5 0.4 0.45 0.4 0.7 0.6 0.7 0.656 0.8 0.8 0.7 0.7 0.6 0.6 0.4 0.6148333333333332 None
15 May 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 3.4 3.2 3.15 3 10.8 12.9 8.5 12.3 12.1 13.9 14.1 14.4 10.7 9.8 3 9.446428571428571 None
15 May 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F 7.3 LS/D 13.7 13.3 12.4 11.1 7.3 11.559999999999999 None
15 May 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
15 May 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 11.9 12.5 12.2 12.3 13.2 10.7 13.8 14.4 O/C 5.7 5.8 5.5 3.1 2.9 2.8 2.8 2.3 8 10.6 11 9.5 5.6 8.6 10.8 2.3 8.521739130434783 None
15 May 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC 1.5 1.5 1.4 1.4 1.5 2 2.3 2.1 2.1 2.2 8.4 8.4 8.7 8.1 8.5 5.4 8.3 8.2 9 8.9 8.3 7.5 7 6.1 1.4 5.366666666666667 None
15 May 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F 1.9 2.2 2.1 1.9 1.8 1.8 1.98 None
15 May 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
15 May 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F 6.6 6.7 6.6 6.7 6.6 6.9 14.1 9.1 8.5 7.9 11.7 12.1 6.6 8.625 None
15 May 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 1.82 3.09 3.59 3.7 3.15 4.4 3.2 4.1 6.07 7.81 6.95 7.92 8.19 5.87 7.56 6.3 5.45 4.61 4.43 4.05 3.78 3.76 3.94 3.35 1.82 4.87875 None
15 May 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F O/C & E/F 3.5 4.2 4.4 4.4 4.2 3.8 3.6 3.5 4.014285714285714 None
15 May 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 4.93 9.02 9.92 10.08 8.58 12.1 9 10.6 14.33 16.27 14.53 15.3 14.31 3.02 4.03 6.59 13.07 12.83 12.85 13.94 11.23 10.96 12.17 9.86 3.02 10.813333333333333 None
15 May 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 1.09 1.82 2.08 2.15 1.83 2.6 2.2 3.5 5.39 6.32 6.08 5.8 5.02 5.56 8.55 7.38 6.88 5.61 4.77 4.36 3.33 3.26 3.27 2.49 1.09 4.222499999999999 None
15 May 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 3.4 5.29 6.66 6.41 5.21 7 6.5 9.3 14.47 15.75 13.88 15.57 16.09 14.19 18.12 14.71 14.54 10.78 9.42 10.29 7.35 7.5 7.96 6.43 3.4 10.284166666666666 None
15 May 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 6.82 11.11 12.61 12.8 11.23 17.2 13.1 14.4 19.38 15.51 23.27 20.63 21.07 19.51 23.89 20.65 17.7 11.47 11.22 12.94 9.83 15.06 14.4 15.03 6.82 15.451249999999996 None
15 May 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
15 May 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 18.26 16.3 18.39 18.36 15.74 21.4 14.7 14.8 14.79 14.8 12.02 16.02 16.52 16.11 21.33 18.53 19.81 17.21 INST O/C 22.69 19.71 20.22 22.03 19.78 12.02 17.805217391304346 None
15 May 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
15 May 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 10.2 9.6 9.3 9.1 10.7 9.7 10 8.7 8.2 8.5 8.8 8.9 9.3 9.5 9.9 9.9 7.2 7.7 9.2 LS/G LS/G LS/G 11.4 9.9 7.2 9.319047619047618 None
15 May 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 14.9 14.2 13.7 10.7 14.4 13.6 13.4 12.7 13.4 13.4 13.6 13.9 14.3 13.2 15.4 12.2 15.5 15.8 17.8 18.8 19 18.4 LS/G LS/G 10.7 14.65 None
15 May 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
15 May 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
15 May 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S 0.41 0.46 0.43 0.15 I/S I/S 0.68 0.37 I/S I/S I/S I/S I/S I/S I/S I/S 0.15 0.4166666666666667 None
15 May 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.18 1.13 1.07 1.06 1.15 1.07 1.02 0.83 0.8 0.8 0.83 0.82 0.87 0.9 0.96 0.96 OC/EF OC/EF OC/EF OC/EF 0.64 0.6 0.6 0.53 0.53 0.8910000000000003 None
15 May 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 8.35 8.1 7.8 7.7 8.35 9.2 10 11.45 13.35 14.1 14.25 13.95 14 13.4 13.95 12.4 11.5 10.5 9.8 9.85 9.7 9.5 8.95 8.6 7.7 10.78125 None
15 May 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 4.1 3.95 1.2 3.3 3.4 3.9 4.45 5.45 8.2 3.4 7.2 7.15 6.8 8.2 9.2 8.9 8 6.85 6.55 6.25 6.05 5.9 5.4 5.2 1.2 5.791666666666667 None
15 May 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
15 May 2026 None 132KV APO TS TR1 60MVA 33KV FDR H15 132KV APO TS_33KV FDR H15_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10000000000000003 None
« Previous Page 53 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —