Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
06 Feb 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC 8.05 7.35 6.8 6.7 7.2 8.3 5.6 7.45 7.25 6.75 6.6 6.15 6.05 LS LS 4.45 19.75 19.45 20.55 20.7 20.4 19.5 18.1 LS 4.45 11.102380952381 None
06 Feb 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 7.3 6.85 6.4 6.1 6.2 6.4 6.4 5.45 5.2 5.5 5.3 5.2 5.4 4.7 5.2 BC BC BC 2.1 8.25 8.4 8.3 7.9 7.5 2.1 6.19285714285714 None
06 Feb 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 6 5.8 5.4 5.2 5.2 5.4 5.4 4.7 4.45 4.7 4.8 4.5 4.5 3.8 4.55 4.6 5.05 5.05 6 3 3.05 3.15 7.15 7 3 4.93541666666667 None
06 Feb 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 14 13.55 10.4 10.1 10.3 14.4 14.6 14.75 15.95 16.6 17.15 12 12.25 10 15.7 10.4 14.55 15.1 16.85 16.7 14.15 13.95 13.35 12.7 10 13.7291666666667 None
06 Feb 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.5 1.55 1.3 1.6 1.9 1.3 1.6 1.6 1.9 1.95 1.8 0.015 0.85 0.1 1.15 1.3 1.8 1.4 1.85 1.65 1.2 1.6 1.55 1.4 0.015 1.41104166666667 None
06 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC 14.4 13 12.8 12.8 13.1 15.8 14.9 12.4 12.2 12.2 11.8 11.8 6.1 6.6 6.5 6.9 LS/D LS/D LS/D 14.7 14.6 14.7 12.9 12.1 6.1 12.0142857142857 None
06 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC LS/D 16.2 15.6 15.6 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 20.9 20.1 20 LS/D LS/D LS/D LS/D LS/D LS/D 15.6 18.0666666666667 None
06 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC LS/D LS/D LS/D LS/D 7.8 8.1 7.8 5.5 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 7.2 7.5 7.9 LS/D LS/D LS/D LS/D LS/D 5.5 7.4 None
06 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC 13 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 14.2 14.2 8.3 13.8 LS/D LS/D LS/D LS/D LS/D LS/D 15.8 15.4 13.9 11.6 LS/D LS/D 8.3 13.3555555555556 None
06 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC LS/D LS/D LS/D LS/D 17.3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 20.1 19.7 18.5 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 19.4 17.1 17.1 18.6833333333333 None
06 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC 9.7 5.1 8.7 8.7 LS/D LS/D LS/D LS/D LS/D LS/D 10.2 9.6 10 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5.1 8.85714285714286 None
06 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 15.6 14.2 13 12.4 12.5 13.3 14.5 11.7 11.2 11.7 10.4 SG SG LS/D 16.4 11.5 15.8 17.8 LS/D LS/D LS/D LS/D LS/D LS/D 10.4 13.4666666666667 None
06 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 17 LS/D LS/D LS/D LS/D LS/D 13 12.7 12 18 17.3 17 17 LS/D LS/D LS/D LS/D 12 14.1 15 15 14 12.8 6.4 6.4 14.22 None
06 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 14.9 16.6 15 14.2 14.1 17.4 17.5 15.4 14.5 13.8 8.4 E E E 15.1 15.1 15.6 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 8.4 14.8285714285714 None
06 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 15 16 12.5 12.5 14.5 None
06 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 4.4 4 4 3.8 3.9 4 3.7 3.8 3.8 4.2 4.1 2.8 4.7 4.2 4.6 4.5 4.7 4.8 4.6 5.3 5.7 5.5 5.2 5.6 2.8 4.4125 None
06 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
06 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 12.5 11.8 11.3 11 11.1 11.3 11.3 11.3 12.7 13.4 13.6 14 12.8 11.3 LS/D LS/D LS/D LS/D 9.8 13.9 15.8 15.3 14.3 10.7 9.8 12.46 None
06 Feb 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 15.3 14.4 2.2 2.1 2.2 6.1 7.9 7.1 7 10.1 10.1 7 13.8 9.4 9.3 12.5 8.6 3 3 3.1 9 3 3 3 2.1 7.175 None
06 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 4.7 5.4 5.1 4.3 4.4 4.7 4.5 5.6 5.9 6.8 6.3 5.6 5.7 4.6 4.6 5.5 5.2 5.2 5.1 6.5 5.1 5.1 6.3 6.2 4.3 5.35 None
06 Feb 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 3.1 3 3 3.1 4 4.6 5.1 E/F 3.3 3.3 3.2 3.1 4.3 4.4 3.3 3.3 3.4 I/S I/S I/S I/S I/S I/S I/S 3 3.59375 None
06 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 10.9 10.4 10.1 9.7 10 10.2 10.2 11.4 12.8 15.8 14.9 15.4 12.4 13.3 LS/D LS/D LS/D 11.3 12.4 13 13.7 13.4 12.4 INST. O/C 9.7 12.185 None
06 Feb 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P W/P 0 nan None
06 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 1.5 4 4.1 4.2 1 1 1 1.3 1.5 1.5 1.8 1.4 1.05 1 1.15 1 1.1 7.75 8.9 8.5 8.5 2 1.75 1.6 1 2.85833333333333 None
06 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.25 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.05 0.13125 None
06 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 3.9 3.8 3.6 3.6 3.7 4.2 4.5 4.2 4.3 4.6 4.6 4.7 4.9 5.2 4.8 4.4 4.4 4.9 4.8 5 5.2 4.8 4.6 4.3 3.6 4.45833333333333 None
06 Feb 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 13.56 12.8 12.3 11.8 11.8 12.3 12.1 11.7 11.8 11.8 11.8 10 11.6 12.3 12.4 11.9 12.8 13.6 15.3 15.4 15.7 15.5 L/S 12.7 10 12.7373913043478 None
06 Feb 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 2.2 2.2 2.1 2.2 2.6 4.1 5.7 5.5 4.5 3.4 5.1 5.1 5.3 6 6 6.3 7.2 8 3.6 5.7 6 5.9 6 6 2.1 4.8625 None
06 Feb 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 1.25 1 1.1 1.2 1 1 1.1 1 2.6 2.65 2.45 2.4 2 1.65 1 2.55 1.5 1.7 1.5 1.7 1.4 1.95 2 2 1 1.65416666666667 None
06 Feb 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 1.4 2.4 3.1 3.1 3.3 4.2 3.8 OC/EF OC/EF OC/EF OC/EF 1.2 4.2 OC/EF OC/EF OC/EF 1.2 2.96666666666667 None
06 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 14.2 13.4 12.8 12.57 12.8 14.8 14.8 14 14.1 14.1 14.2 14.2 L/S L/S 16.3 9 15.2 14.9 16.2 16.2 L/S L/S L/S 17.9 9 14.2984210526316 None
06 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC E E E E 18 18.9 17.4 15.8 15.4 15 LS/T 14.2 LS/G 15.5 16.1 15.8 16 16 19 19.9 19.9 LS/G LS/G LS/G 14.2 16.86 None
06 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC 5.5 5.5 5.6 5.7 5 5.5 4 6 4.5 I/S I/S I/S 2 LS/D LS/D LS/D LS/D I/S I/S I/S I/S 7 5.5 5 2 5.13846153846154 None
06 Feb 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC 5.5 6 6.1 6.2 6 5 4.5 5 5 5 5 6.5 5.25 LS/D LS/D LS/D LS/D 8 8.7 6.75 5.7 LS/D LS/D LS/D 4.5 5.89411764705882 None
06 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 6.3 6.4 6.1 7.7 8 8.7 9 8.8 2.6 2.8 11.8 LS/D LS/D LS/D LS/D 2.7 3.1 2.8 2.5 2.8 2.8 2.6 2.5 2.4 2.4 5.12 None
06 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC L/SHED 12 12.2 11 11.1 11.3 11 9.6 9.1 8.85 8.7 8.8 8.9 9.4 10.8 10.8 10.8 L/SHED INST. EF 7.85 8.5 8.25 8 8.7 7.85 9.79285714285714 None
06 Feb 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 0.8 0.8 0.9 1.6 1.7 1.7 2.2 I/S I/S I/S I/S I/S I/S I/S I/S 2 3 3.1 O/C I/S I/S I/S I/S I/S 0.8 1.78 None
06 Feb 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 11.3 10.6 10 9.67 9.6 9.9 9.6 8.3 8.8 8.8 8.1 8.7 0.7 0.9 1 1 SG 12.2 14.4 14.2 14.3 13.1 13.2 12.7 0.7 9.17695652173913 None
06 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
06 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.5 0.9 0.9 1.1 1.1 1.1 1.2 1.2 1.3 1.4 1.6 1.3 1.4 1.5 1.7 1.6 1.4 1.1 1.3 1.5 1.5 1.4 1.4 1.1 0.5 1.27083333333333 None
06 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 2.1 2 1.9 1.9 2 2.3 2.4 2.2 1.9 1.9 1.9 INST. O/C INST. O/C 1.9 2.1 2.1 1.4 0.4 0.5 0.6 0.6 0.6 1.6 1.4 0.4 1.62272727272727 None
06 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.5 0.6 0.6 0.5 0.7 0.6 0.7 0.4 8.7 10.8 0.8 8.2 0.5 0.7 0.7 0.7 0.7 0.9 0.7 0.5 0.6 0.7 0.6 0.4 0.4 1.7 None
06 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 9.5 L/SHED L/SHED 6.6 9.6 10.1 9.7 8.6 8.6 12.05 11.6 11.3 L/SHED L/SHED 12.4 12.6 12.6 12.75 9.6 L/SHED L/SHED L/SHED 11.6 10.25 6.6 10.5558823529412 None
06 Feb 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 0.6 0.6 0.5 0.5 0.5 0.6 0.7 0.8 5.6 5.2 5.2 0.6 0.6 3.8 4 4 0.7 3 4 4 5.1 4.8 4.4 4.3 0.5 2.67083333333333 None
06 Feb 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F 1.3 5 5 5.1 5.2 5 5 6 0.2 6.3 6.5 6 5.8 5.5 5.5 0.2 4.89333333333333 None
06 Feb 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 6.8 6.5 6.5 6.6 7.1 6.8 7.4 7.4 6 5 5.1 5.1 5 5 4.6 3.8 4.2 0.4 2 2 1.6 1.8 1.5 1.3 0.4 4.5625 None
06 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 3.4 3.3 3.2 3.4 3.4 3.3 3.3 3.4 4.2 4.3 4.9 4.2 3.4 3.1 3.2 3.4 3.2 3.1 1.6 2.9 3.3 3.9 3.9 3.6 1.6 3.45416666666667 None
06 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 1 1 1.1 1.2 1 1.25 1.4 1.5 I/S 4 6.5 7 6.5 9.5 8 9 8.85 8.1 8.4 9 9 8.9 0 7 0 5.18260869565217 None
06 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
06 Feb 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 1.9 1.9 1.9 2 2.1 2.3 3.2 3.2 3.3 3.3 3 2.6 LS/D LS/D LS/D LS/D 1.7 1.8 2.4 2.6 3.2 2.6 2.3 2.4 1.7 2.485 None
06 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 22.1 20.8 19.8 19.1 19 19.68 22.1 25.2 27.2 27.2 12.3 30.2 28.2 26.9 27.5 28.5 29.4 23.8 22.9 22.6 26.1 25.7 25.2 24 12.3 23.9783333333333 None
06 Feb 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.3 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.9 1 1 0.8 0.7 0.6 0.6 0.3 0.625 None
06 Feb 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA 0.4 0.6 0.6 0.5 0.6 0.05 0.05 1.3 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F - 0.05 0.129166666666667 None
06 Feb 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL 1.02 0.96 0.96 0.9 0.9 1.23 1.32 1.44 1.38 1.4 1.2 1.14 1.08 1.05 1.08 1.2 1.3 1.32 1.39 1.4 1.32 1.08 1.02 - nan nan None
06 Feb 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO TAMBUWAL FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
06 Feb 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
06 Feb 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA 8.6 8 7.7 7.6 8.1 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 11.2 12.4 8.5 8.3 7.9 - 7.1 3.28333333333333 None
06 Feb 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0 0.1 0.1 0 0.1 0 0 0.1 0.2 0.3 0.3 0.3 0.3 - nan nan None
06 Feb 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 6 6 6 4 4 4 6 8 6 6 6 4 6 6 4 4 6 7 8 8 8 7 6 6 4 5.91666666666667 None
06 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 1.8 1.8 1.8 1.7 1.7 1.9 2.1 1.6 1.6 1.8 1.9 1.8 2 2.2 1.9 2.2 2 2.1 2.3 2.5 2.1 2 1.9 1.9 1.6 1.94166666666667 None
06 Feb 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 - 0.02 0.0183333333333333 None
06 Feb 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA 4.8 4.7 4.4 4.4 4.8 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 4.4 0.566666666666667 None
06 Feb 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA 1.7 1.7 1.7 1.7 1.8 2.2 2.3 2.1 2.1 2.2 2.3 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 2.7 2.8 - 1.7 1.1 None
06 Feb 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
06 Feb 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
06 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.3 1 0.9 0.8 0.8 0.8 0.6 0.4 0.4 0.5 1 1.1 1.4 1 1.2 0.1 0.1 0.4 0.1 0.558333333333333 None
06 Feb 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
06 Feb 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 7.9 7.8 7.5 7.5 8.5 9.3 0.1 0.1 0.1 0.1 0.1 7.8 9.5 9.4 0.1 0.1 0.1 0.1 0.1 0.1 10.6 9.9 8.6 7.9 0.1 4.72083333333333 None
06 Feb 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 4.5 4.4 4.2 4.2 4.7 0.3 0.3 0.4 2.4 4.3 3.9 3.7 3.5 2.7 3.1 NCL/A NCL/A NCL/A NCL/A 0.5 0.6 5.1 5 - 0.3 2.20833333333333 None
06 Feb 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.3 0.3 0.3 0.4 0.5 0.6 0.6 0.7 0.7 0.7 NCL/A 0.8 0.8 0.8 0.6 0.8 0.8 0.7 0.6 0.6 0.6 0.5 - 0.3 0.5375 None
06 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 18.6 17 8.9 8.6 4.9 6 0.1 0.1 0.1 1.59 1.5 1.49 4.3 12.6 12 12 1.4 1.4 0.1 6.4 1.3 7 6.5 - 0.1 4.33666666666667 None
06 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 9.7 4.1 5.2 0.3 0.3 0.3 0.4 0.4 0.46 0.58 0.62 0.62 0.6 0.7 0.63 0.62 0.5 0.5 5.8 6.2 6.7 6.2 0.4 - 0.3 1.60125 None
06 Feb 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 4.3 4.1 4 4 4.1 4.1 4.9 4.8 5.2 5.3 0.2 0.1 5.5 5.6 5.2 5.8 0.2 0.2 5.4 6.1 6.1 5.7 5.5 - 0.1 3.8625 None
06 Feb 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 2.5 2.1 3.6 2.7 1.4 1.1 0.6 0.6 0.3 0.3 3.3 3.4 1.8 1.5 1.5 1.5 1.2 0.7 0.8 0.8 0.7 4.2 3.2 - 0.3 1.57916666666667 None
06 Feb 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 3.4 2.4 3.4 3.5 3.7 3.8 5.1 NCL/A 2.4 2.5 2.1 2.1 2.1 2.5 2.5 2.2 0.8 3.1 2.8 2.7 2.5 2.4 2.3 - 0.8 2.3625 None
06 Feb 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 2.3 1.9 2.5 2.4 2.6 2.6 2.8 3 3 NCL/A 1.6 1.6 1.5 1.5 1.5 1.5 1.5 3.8 3.8 NCL/A 3 NCL/A NCL/A - 1.5 1.675 None
06 Feb 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 0.17 8.3 7.88 7.98 8.71 11.08 11.19 10.1 9.31 9.22 9.07 8.86 8.81 8.05 8.42 8.61 7.83 8.57 8.88 0.15 10.21 9.56 11.07 - 0.15 8.06625 None
06 Feb 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 3.64 3.56 3.25 3.43 3.58 E/F E/F 0.99 2.96 5.59 E/F E/F 1.74 1.71 2.15 2.72 3.29 5.32 5.67 5.64 4.9 4.58 0.91 - nan nan None
06 Feb 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.3 0.4 0.2 0.2 0.2 0.2 - 0.1 0.175 None
06 Feb 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 4 3.6 3.5 3.4 4.2 4.4 5 4.9 3 2.44 0.055 4 4.1 3.5 4 1.29 3.3 3.3 3.1 1.2 0.1 3.7 3.7 - 0.055 2.799375 None
06 Feb 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA LSD LSD 5.5 5.7 6.3 LSD 7.2 E/F E/F E/F SG SG LSD LSD LSD LSD LSD LSD LSD 5.8 5.8 LSD LSD - 5.7 1.28333333333333 None
06 Feb 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 0.2 0.2 0.2 0.2 0.3 0.3 0.4 0.4 0.37 0.39 0.38 0.52 0.5 0.5 0.48 O/C O/C O/C O/C 0.1 0.3 1.9 2.3 - 0.1 0.476666666666667 None
06 Feb 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 0.27 0.2 0.2 0.2 0.2 0.2 0.18 0.19 0.19 0.19 0.22 0.19 0.2 0.21 0.2 0.2 0.21 0.23 0.21 0.3 0.23 0.24 0.21 - 0.18 0.192916666666667 None
06 Feb 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.07 0.08 0.08 0.08 0.08 0.09 0.09 0.08 0.06 0.06 0.07 0.07 0.07 0.07 0.07 0.06 - nan nan None
06 Feb 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 6.1 4.6 4.5 6.25 6.8 7.3 6.85 6.7 7.15 7 6.55 6.6 7.35 3.7 3.05 1.05 2.7 4.85 3.35 4 3.9 3.55 6.7 - 1.05 4.8375 None
06 Feb 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
06 Feb 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 4 3.8 3.4 3.4 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL.A 4 3.6 - 3.4 1.15416666666667 None
06 Feb 2026 None YAURI TR2-40MVA KOKO — KADUNA DS DS DS DS DS DS DS DS DS 3.3 DS DS DS DS DS DS DS DS DS DS DS DS DS - 3.2 0.270833333333333 None
06 Feb 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 6 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A - 6 0.25 None
06 Feb 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA 0.1 0.1 2.5 3 3.1 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 2.9 - 2.5 0.6125 None
06 Feb 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 2.2 2.1 2.1 2 2 2 2.2 2.3 2.2 0.8 2 1.9 1.6 0.3 0.5 0.5 0.9 1.4 1.9 3.9 4.1 4.2 4.1 - 0.3 1.94166666666667 None
06 Feb 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0 0 0 0 0 0 0 0 0.044 0.055 0.07 0.05 0.1 0 0.046 0.05 0 0 0 0 0 0 0 - 0 0.0172916666666667 None
06 Feb 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 2.9 3 3.1 3.2 10.7 8 8 8.3 NCL/A NCL/A - 2.9 1.96666666666667 None
06 Feb 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA 0.4 0.4 0.4 0.4 0.4 0.4 0.4 4.8 4.8 4.5 3.6 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 0.7 0.6 0.6 0.6 - 0.4 0.941666666666667 None
06 Feb 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.55 0.55 0.55 0.45 0.55 0.65 0.65 0.55 0.55 0.5 0.5 0.5 0.55 0.55 0.65 0.65 0.65 0.65 0.8 0.8 0.75 0.75 0.7 - 0.45 0.5625 None
06 Feb 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 2.3 2.8 3 4.9 5.1 5.6 3 2.7 2 6.5 6 3.8 3.5 4.5 4.5 1.5 4.4 4.3 2.1 2.2 3.3 3.3 4.2 - 1.5 3.48333333333333 None
06 Feb 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0.16 0.16 0.14 0.14 0.16 0.14 0.15 0.16 0.16 0.05 0.02 0.02 0.03 0.02 0.02 0.01 0 0.01 0.01 0 0.01 0.01 0.01 - nan nan None
06 Feb 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 4.4 4.5 8.35 8.8 8.95 10.15 3.95 4.5 4.55 3.8 4.35 4.5 1 9.35 3.7 4.1 3.95 4.4 4.4 6.55 10.1 8.8 4 - 1 5.26041666666667 None
06 Feb 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF 0.2 0.1 2.5 E/F - 0.1 0.116666666666667 None
06 Feb 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 3.6 3.5 3.5 3.5 3.7 3.9 4.4 7.6 8.2 5 8.7 8.6 8.1 3.8 3.9 5 4.3 5.5 4.8 4.9 4.7 4.8 4.5 - 3.5 4.81666666666667 None
« Previous Page 205 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —