Hourly Load Profile (Unified)
Average Hourly Load Analysis
Multi-select enabled
Attribution Analysis Upload Load Report

Average Hourly Load (MW)

Detailed Hourly Readings
Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
10 Feb 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA 0.05 0.05 0.05 0.05 0.05 0.05 0.8 0.8 0.6 0.7 0.7 OC&EF OC&EF OC&EF OC&EF 0.05 1 1 1 1.7 0.05 0.05 0.05 - 0.05 0.364583333333333 None
10 Feb 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL 1.02 1.01 0.99 0.99 0.99 1.02 1.44 1.41 1.26 1.26 1.23 1.26 1.23 1.23 1.23 1.26 1.35 1.44 1.38 1.38 1.29 1.23 1.14 - nan nan None
10 Feb 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
10 Feb 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC 8.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 7.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 10.8 10.6 0.1 0.1 0.1 0.1 1.62083333333333 None
10 Feb 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA 7.6 NCL/A NCL/A NCL/A NCL/A 8 10 14 12 11.7 11.2 E/F E/F E/F E/F E/F E/F E/F E/F 11.6 12.2 12 11.1 - 8 5.12916666666667 None
10 Feb 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.3 0.2 0.2 0.3 0.2 0.3 0.1 0.2 0.1 0.1 0 0.1 0.1 0 0.1 0 0.1 0 0.2 0.3 0.5 0.3 0.3 - nan nan None
10 Feb 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 7 7 5 4 4 4 8 8 7.6 6 6 6 6 6 6 7.6 8 8 8 8 8 8 8 6.6 4 6.7 None
10 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 2.3 1.2 1.2 2.2 2.3 2.4 2.3 2.2 2.1 2 1.2 2.02 None
10 Feb 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 - 0.04 0.0366666666666667 None
10 Feb 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA 4.7 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 5.6 5.9 O/C O/C O/C 5.5 - 5.5 0.9375 None
10 Feb 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA 1.8 1.6 1.6 1.6 2 2.1 1.9 1.5 1.4 0.5 1.5 1.5 1.5 1.5 DS DS DS DS DS DS DS 2.5 2.5 - 0.5 1.075 None
10 Feb 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
10 Feb 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
10 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.4 0.3 0.4 0.4 0.4 0.4 0.4 1.1 1.1 1.2 1.3 1.2 1.2 1.2 1 1.2 O/C 1.3 0.8 1.4 0.7 0.6 0.4 0.3 0.3 0.81304347826087 None
10 Feb 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S L/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
10 Feb 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 7.8 7.4 7.3 8 8.3 9.2 0.1 0.1 0.1 0.1 0.1 9.3 9.5 9.1 0.1 0.1 7.8 0.1 0.1 0.1 10.3 9.7 9.5 8.5 0.1 5.1125 None
10 Feb 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 0.4 0.3 0.4 0.3 0.3 0.3 0.3 6.1 5.6 5.3 5 4.7 0.4 0.4 0.4 0.4 0.4 0.4 4 4.2 3.9 3.6 0.4 - 0.3 1.96666666666667 None
10 Feb 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.4 0.4 0.4 0.4 0.6 0.7 0.7 0.7 0.7 0.8 0.8 0.7 0.7 MTT MTT 0.8 1.1 0.9 0.7 O/C 0.5 0.5 - 0.4 0.520833333333333 None
10 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 14.4 13.3 5 5 5.19 0.072 0.12 5 10.8 1.7 1.7 1.7 2 13.7 13.6 13 7.1 1.6 6.5 6.2 1.5 7.6 11 - 0.072 5.54508333333333 None
10 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 5.2 9.2 5 5 4.46 0.48 0.51 0.5 0.6 0.6 0.7 0.7 0.8 0.8 0.8 6.2 0.8 0.7 0.7 6.3 5.6 6.5 0.5 - 0.48 2.03125 None
10 Feb 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 3.8 4.5 4.4 4.5 4.8 5.5 6.3 5.9 5.4 5.4 0.3 0.2 4.7 5.5 5.4 4.9 0.2 0.2 6.7 6.1 0.3 0.2 0.2 - 0.2 3.22083333333333 None
10 Feb 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 2.5 2.3 2.2 2.2 2.5 1.1 0.5 0.3 0.3 0.3 2.8 0.3 0.7 1.7 1.4 0.9 0.9 0.8 0.8 0.5 1.4 4.4 NCLA - 0.3 1.08333333333333 None
10 Feb 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 3 2.9 2.9 2.9 3.1 NCL/A NCL/A NCL/A 2.7 2.7 2.6 2.5 2.3 3 3 3.2 3.2 3.2 3.4 3.2 3 2.8 2.6 - 2.3 2.27916666666667 None
10 Feb 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA NCLA 2.5 2.5 2.5 2.5 2.8 3.5 2.9 3 E/F 2.1 2.5 2.6 E/F E/F 2.2 2.7 2.5 2.6 3.9 3.7 3.3 E/F - 2.1 1.99166666666667 None
10 Feb 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 10.42 10.04 9.74 9.35 10.29 10.58 9.18 7.9 8.18 9.22 8.98 9.48 9.59 9.76 9.97 10.25 10.12 9.85 9.98 11.09 10.56 10.14 11.04 - 7.9 8.90083333333333 None
10 Feb 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 4.29 0.78 3.95 3.45 3.95 4.25 5.31 5.6 5.96 5.25 5.84 5.91 5.76 5.69 5.45 5.7 6.07 6.47 6.43 5.73 5.1 4.91 2.47 - nan nan None
10 Feb 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.3 0.3 0.2 0.1 0.1 0.5 0.5 0.3 0.2 0.2 0.2 - 0.1 0.233333333333333 None
10 Feb 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 1.6 NCL/A NCL/A NCL/A NCL/A 5 5.38 5.33 2.1 0.1 4.7 4.6 4.5 0.1 5 3 3.1 4.5 4.8 0 3.8 4 0.1 - 0 2.65875 None
10 Feb 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA LSD LSD LSD LSD LSD LSD LSD 6.1 6.1 6 5.9 5.6 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5.6 1.2375 None
10 Feb 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 1.8 1.7 E/F E/F E/F E/F E/F E/F E/F E/F 2.6 0.4 0.5 0.6 0.6 O/C O/C 0.5 0.6 0.6 0.5 0.4 0.4 - 0.4 0.4125 None
10 Feb 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 0.17 0.2 0.18 0.19 0.2 0.22 0.2 0.2 0.19 0.19 0.2 0.22 0.19 0.2 0.19 0.18 0.17 0.18 0.19 0.2 0.2 0.2 0.19 - 0.17 0.178333333333333 None
10 Feb 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.06 0.09 0.07 0.07 0.07 0.07 0.07 0.07 0.08 0.08 0.09 0.08 0.09 0.06 0.09 0.09 0.08 0.08 0.08 0.07 0.06 0.07 0.07 - nan nan None
10 Feb 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 6.25 6.55 7.75 7.35 7.45 7.55 8.4 5.05 7.4 8.4 8.35 8.9 10.25 7.1 9.25 10.3 10.4 10.45 7.15 6.65 0.85 9.85 8.75 - 0.85 7.35416666666667 None
10 Feb 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
10 Feb 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A 5.4 5.4 DS DS DS DS DS DS DS DS DS DS 4.5 7.1 DS 6.3 6.8 6.3 5.1 - 4.5 2.1625 None
10 Feb 2026 None YAURI TR2-40MVA KOKO — KADUNA NCL/A NCL/A NCL/A NCL/A NCL/A DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS 3.7 3.7 DS - 3.7 0.308333333333333 None
10 Feb 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA NCLA NCLA NCLA NCLA NCLA NCLA NCLA NCLA NCLA NCLA NCLA NCLA NCLA 5.6 MTT MTT 2.3 3.5 7.5 7.2 O/C 5.1 4.8 - 2.3 1.675 None
10 Feb 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA NCL/A 3.4 3.7 3.7 3.7 3.7 OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF 3.3 3.2 3.4 NCLA - 3.2 1.02916666666667 None
10 Feb 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 3.6 3.6 3.7 3.5 3.5 3.7 NCL/A NCL/A NCL/A NCL/A 0.9 1.1 0.9 1 0.9 0.7 0.8 0.8 0.8 0.9 0.9 0.9 2.7 - 0.7 1.225 None
10 Feb 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0 0 0.043 0.043 0.047 0.044 0.043 0.04 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0 0 0 0 0 0 - 0 0.0483333333333333 None
10 Feb 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA 3.7 3.4 3.4 3.2 3.1 3.1 3.9 4.2 2.1 0.9 2.7 8 NCL/A NCL/A NCL/A NCL/A 7.5 10 10 NCL/A NC L/A NC L/A NC L/A - 0.9 2.5875 None
10 Feb 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA 0.4 3 3.1 3 3.2 3.5 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.5 0.5 0.5 0.6 0.6 0.4 - 0.4 0.908333333333334 None
10 Feb 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.55 0.65 0.55 0.55 0.65 0.75 0.7 0.55 0.55 0.55 0.5 0.55 0.55 0.65 0.55 0.65 0.7 0.6 0.75 0.8 0.75 0.65 0.55 - 0.5 0.56875 None
10 Feb 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 6.1 5.9 5.5 2.7 4.3 4.3 3.6 3.1 6.1 6.1 2.5 2.5 2.5 2.5 2.5 4.2 4.1 6.2 2.2 3 2.3 6.4 5.9 - 2.2 3.65833333333333 None
10 Feb 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0 0.01 0 0.01 0 0.01 0.01 0 0.01 0.01 0 0.01 0.01 0.01 0.01 0 0.01 0.01 0 0.01 0 0.01 0.01 - nan nan None
10 Feb 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 4.2 4.15 4.15 4.5 4.3 5.1 5.3 5.25 4.4 4.4 8.85 4.55 4.35 3.7 4.1 4.8 4.75 4.45 4.9 9.7 1.65 4.5 4.4 - 1.65 4.43541666666667 None
10 Feb 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA 0.1 2.8 2.8 2.6 2.8 0.1 3.1 0.1 0.1 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F - 0.1 0.483333333333333 None
10 Feb 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 6.9 0.7 1 1 1 1 6.2 5.3 4.8 4.7 4.8 4.7 5.9 6 5.8 4.7 5.2 5.4 5.4 5.1 1.1 1.2 1.1 - 1 3.4375 None
10 Feb 2026 None YAURI TR1-40MVA NGASKI — KADUNA DS DS DS DS DS DS DS DS 2.6 DS DS DS DS DS DS DS DS DS DS DS DS DS 2.6 - 2.6 0.325 None
10 Feb 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA 3.4 2.7 2.5 2.4 3.1 3.1 1.8 1.6 3.8 4.5 5.1 5.2 NCL/A 3.3 5.4 5 4.2 3 3 3.1 NC L/A NC L/A NC L/A - 1.6 2.5875 None
10 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 4 4 3.9 3.9 4.1 5.1 5.1 1.2 1.1 1.1 1.1 1.2 1.2 O/C 1 O/C O/C O/C 4.1 4.2 4 4 3.8 3 1 3.055 None
10 Feb 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 6.3 7 7 7.2 7 7.1 1.1 1.6 8.6 11 5 5.1 5.1 2.5 2.1 7.6 MTT 1.1 7.3 7.1 6.5 6.1 6.8 - 1.1 4.96666666666667 None
10 Feb 2026 None SOKOTO TR1- 40/30MVA P/STATN — KADUNA 6.1 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 1.7 9.6 9.4 9.3 9.5 9.2 11.7 12.8 15.2 15 12.2 12.2 17.1 7.4 - 1.7 6.62916666666667 None
10 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
10 Feb 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 None
10 Feb 2026 None B/KEBBI TS TR6-100MVA TAMBUWAL — KADUNA 1.4 1.4 1.39 1.33 1.32 O/C O/C O/C O/C O/C O/C O/C 0.1 0.1 0.4 0.4 0.4 0.4 2.4 INST. E/F INST. E/F 0.3 3.4 - 0.1 0.635 None
10 Feb 2026 None KONTAGORA TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA 8.2 3.6 4.9 5 5.1 5.5 6.3 6 5.8 8.7 6.6 6.6 6.4 6.9 7.3 7 6.9 10.3 6.5 6.4 7.4 5.9 6.1 - 4.9 5.975 None
10 Feb 2026 None SOKOTO TR 3 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL KADUNA 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 7.7 7.1 7.1 7.1 6.4 7.3 4.8 5.1 0.4 0.4 0.4 0.4 - 0.3 2.38333333333333 None
10 Feb 2026 None BIDA TR5-60MVA Town 11KV fdr — ABUJA LSD LSD LSD LSD LSD LSD E/F E/F E/F E/F E/F E/F 8.7 9 8.8 8.4 8.1 LSD LSD LSD LSD LSD LSD - 8.1 1.79166666666667 None
10 Feb 2026 None B/KEBBI TS TR5-60MVA UNIVERSITY — KADUNA 0.2 0.2 0.195 0.2 0.2 0.2 0.044 0.2 0.3 0.7 0.5 0.5 0.6 0.5 0.8 0.2 0.3 0.2 0.2 0.3 0.2 0.2 0.2 - 0.044 0.289125 None
10 Feb 2026 None KONTAGORA TR1- 60MVA WATER WORKS 132KV KONTAGORA TS_33KV WATERWORKS FDR_PL_PL ABUJA 0.3 0.2 0.3 0.3 0.2 0.3 0.3 0.3 0.3 0.2 0.3 0.3 0.3 0.3 0.3 0.4 0.3 0.3 0.4 0.3 0.4 0.4 0.3 - 0.2 0.283333333333333 None
10 Feb 2026 None SOKOTO TR 3 60MVA YABO — KADUNA 2.6 2.8 2.8 2.7 2.6 2.9 3.6 3.6 3.5 3.6 3.6 3.5 3.6 3.7 3.6 3.4 1.1 E/F E/F E/F 1.7 1.7 1.5 - 1.1 2.32916666666667 None
10 Feb 2026 None YAURI TR1-40MVA YAURI — KADUNA 3.8 4.1 3.9 3.8 5.8 3.4 0.5 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 4.4 4.3 0.6 4.3 3.9 DS 0.5 0.5 - 0.5 1.6875 None
10 Feb 2026 None MINNA TS TR7- 60MVA ZARUMAI FDR 132KV MINNA TS_33KV ZARUMAI FDR_PL_PL ABUJA 3.6 3.4 3.5 7.2 8 8.4 6.9 2.3 6.6 6.8 3 3 3.3 3.3 7 6.7 MTT 2.5 8 8.1 4.2 4.4 5.3 - 2.3 4.73333333333333 None
10 Feb 2026 None YAURI TR1-40MVA ZURU — KADUNA 2 1.8 1.8 1.8 1.9 1.9 2.4 2.4 2.3 2.5 2.5 5.2 5.2 5.2 DS DS DS DS DS DS DS DS DS - 1.8 1.4625 None
09 Feb 2026 None MINNA TS TR4- 15MVA 11KV CHANCHAGA FDR — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 7.4 7.4 7.5 7.6 LSD LSD LSD LSD LSD LSD LSD - 7.4 1.24583333333333 None
09 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.67 4.33 4 4 4.33333333333333 None
09 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.83 2.92 2.25 LS/D LS/D LS/D 2.25 2.66666666666667 None
09 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D 5.17 4.83 4.17 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.17 4.72333333333333 None
09 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S LS/D LS/D LS/D 0 nan None
09 Feb 2026 None MINNA TS TR3- 15MVA 11KV PARLFDR — ABUJA 5.8 5.5 5 6 6.5 8 LSD LSD LSD LSD 7.7 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5 1.38333333333333 None
09 Feb 2026 None MINNA TS TR4- 15MVA 11KV SHIROROFDR — ABUJA LSD LSD 7 6 6 7.8 4 3.4 2.8 2.8 LSD LSD LSD LSD LSD LSD LSD 3 3.2 3 3.5 3 LSD - 2.8 2.3125 None
09 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC 0.67 0.63 0.63 0.67 0.83 0.92 LS/D LS/D LS/D LS/D LS/D 0.53 0.83 0.87 LS/D LS/D LS/D 0.8 0.8 0.8 0.8 0.8 0.78 0.68 0.53 0.7525 None
09 Feb 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 1.9 1.9 2 2 2.1 2.1 2 1.7 1.7 1.6 1.59 1.57 1.53 1.6 1.53 1.80642857142857 None
09 Feb 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 5 3 4 5 4.5 2 2.5 4.75 5 5 3.5 4.45 3.9 3.75 4 5.25 2.6 3.7 4.1 1 2.25 4 0.25 1 0.25 3.52083333333333 None
09 Feb 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 1.9 2.2 2.2 2.4 2.7 1 1 0.5 0.5 3.1 3.4 3.8 4.1 2.5 2 1.8 1 0.4 1.8 2.2 2 4.1 3.9 3.5 0.4 2.25 None
09 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 3.5 3.5 3.3 3.2 3.3 3.7 3.7 3.5 3.4 2.4 3.4 3.4 3.5 3.4 3.5 2 2 3.6 3.4 3.6 3.5 3.3 3.4 3.4 2 3.2875 None
09 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC 15.9 19.3 18.6 18.7 17.8 19.5 18.5 20.5 7.15 14.4 19.1 18.9 17.7 TRF LIM TRF LIM TRF LIM TRF LIM 23.3 18.5 TRF LIM TRF LIM TRF LIM TRF LIM TRF LIM 7.15 17.8566666666667 None
09 Feb 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.5 0.6 0.5 0.5 0.6 0.7 0.7 0.6 0.55 0.55 0.6 0.5 0.7 0.5 0.5 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.5 0.608333333333333 None
09 Feb 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC 10.7 10.12 9.7 11.3 11.9 12.9 9.3 7.5 20 LS/D LS/D LS/D 7.3 8.7 E/F E/F E/F E/F 15.1 16.8 16.9 17 16.1 14.3 7.3 12.6835294117647 None
09 Feb 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC 17.8 16.8 16.2 16 18 16.5 4.4 4 3.8 3.7 3.7 3.6 3.4 11.5 16.1 16.8 15.5 15.4 L/SHED 17.5 TRF LIM TRF LIM 18.5 17 3.4 12.2 None
09 Feb 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC I/S I/S I/S I/S I/S I/S 0.4 0.5 0.4 0.4 0.4 0.5 0.5 0.4 0.4 0.4 0.4 I/S I/S I/S I/S I/S I/S I/S 0.4 0.427272727272727 None
09 Feb 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 16.8 16.3 15.7 15.9 17.1 5.6 9.9 8.3 10.9 11 11.1 10 6.9 10.1 10.7 12.2 10.6 9.8 12.8 9.3 12.9 18.6 19.1 18.6 5.6 12.5083333333333 None
09 Feb 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC 6.4 6.1 6.1 6.1 6.6 8 8.9 7.7 7.2 6.9 7 7.1 7.2 7.1 7.4 7.6 7.9 8.5 9 E/F E/F E/F E/F E/F 6.1 7.30526315789474 None
09 Feb 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC 3.8 3 3.8 3.5 4 4.4 1.5 1.5 1.5 1.4 1.5 1.6 1.6 1.6 1.6 1.8 1.7 1.7 1.9 1.9 1.6 1.5 1.5 2.3 1.4 2.175 None
09 Feb 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Feb 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 12.9 12.7 22.1 22.9 17 I/S I/S I/S I/S 26.5 11.5 11.9 11.8 16 16.6 21 25.5 I/S I/S I/S 17.1 17.1 18.6 19.6 11.5 17.6941176470588 None
09 Feb 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 4.49 3.74 3.37 3.52 3.93 4.87 3.01 5.44 6.68 7.77 8.01 8.19 9.36 7.38 9.51 10.24 10.71 6.59 5.83 6.24 5.42 6.18 5.16 4.91 3.01 6.27291666666667 None
09 Feb 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 4 3.8 3.9 3.5 3.7 3.7 3.7 3.9 4.6 4.8 5.2 5.3 5.3 5.4 5.4 5 4.6 4.6 4.8 5.1 4.8 4.6 4.3 4.1 3.5 4.50416666666666 None
09 Feb 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 11.34 9.38 8.28 8.59 9.37 7.39 12.4 12.11 14.06 16.49 16.3 17.97 20.82 11.24 16.54 15.42 14.45 6.94 8.1 10.2 10.44 12.68 10.63 9.45 6.94 12.1079166666667 None
09 Feb 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 4.14 3.52 3.15 3.3 3.63 3.83 4.02 5.87 8.06 9.99 9.33 10.06 11.79 9.13 6.76 6.05 7.98 6.64 5.18 4.77 3.96 4.11 2.82 2.45 2.45 5.85583333333333 None
09 Feb 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 6.62 5.96 4.99 5.34 5.58 4.87 7.93 11.81 15.37 17.62 17.57 18.05 18.42 13.82 15.46 16.08 8.93 2.41 10.11 10.01 8.32 8.12 6.73 5.97 2.41 10.25375 None
09 Feb 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 15.75 13.62 11.94 12.63 14.28 12.01 12.32 11.61 12.93 15.87 20.79 21.98 23.74 18.24 23.72 23.65 22.54 12.04 11.56 12.29 11.7 16.83 16.71 14 11.56 15.9479166666667 None
09 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 17.59 17.98 15.37 15.88 17.03 14.52 19.93 17.85 17.82 19.44 15.34 19.6 20.85 13.26 18.36 20.85 18.8 5.4 19.4 18.94 18.74 19.11 18.69 17.2 5.4 17.4145833333333 None
09 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC L/S L/S 13.2 12.3 12.2 13.7 10.2 7.6 10.8 10.3 10.1 9.8 9.5 10 10.2 10.4 11.3 11.6 13.7 10 10.2 10.1 15.5 14.2 7.6 11.2227272727273 None
09 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 17.2 16 L/S L/S L/S L/S 15.1 13.5 16.5 16.5 16 16.02 15.8 16.3 16.4 17.2 17.4 17.4 19.9 20.7 20.9 20.2 8.9 11.2 8.9 16.456 None
09 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Feb 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
« Previous Page 199 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —