Hourly Load Profile (Unified)
Average Hourly Load Analysis
Multi-select enabled
Attribution Analysis Upload Load Report

Average Hourly Load (MW)

Detailed Hourly Readings
Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
14 Feb 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.6 1.6 1.5 1.3 1.4 1.45 1.55 1.55 1.7 1.65 1.5 1.9 1.85 1.85 1.75 1.75 1.05 1.05 1.75 1.8 1.75 1.65 1.6 1.65 1.05 1.59166666666667 None
14 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC LS/D LS/D LS/D 11 13.4 14.2 11 10.9 10.9 13.7 13.7 13.7 7 7.2 7.6 7.7 7.8 8.2 9.5 10.6 10.4 10.1 13.5 LS/D 7 10.605 None
14 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC 19.2 17.8 16.5 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 19.4 17.9 19.9 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 16.5 18.45 None
14 Feb 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D INST OC INST OC 8.2 7.6 7.4 LS/D 7.1 7.5 7.6 LS/D LS/D LS/D LS/D LS/D LS/D 7.1 7.56666666666667 None
14 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D 8.9 9.9 LS/D SWS SWS SWS SWS SWS SWS SWS LS/D 15.9 15.5 13.7 21.5 LS/D LS/D 8.9 14.2333333333333 None
14 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D 8.9 LS/D LS/D LS/D MTCE MTCE MTCE MTCE MTCE MTCE MTCE LS/D LS/D LS/D LS/D LS/D LS/D 13.2 8.9 11.05 None
14 Feb 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC LS/D LS/D LS/D 9.1 9 LS/D LS/D LS/D LS/D 8 10.8 10.3 LS/D LS/D LS/D 11.1 LS/D LS/D LS/D LS/D LS/D LS/D 11 LS/D 8 9.9 None
14 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC O/C 13 15.6 14 13 13 13.6 13.4 12.8 12.9 LS/D LS/D LS/D 2 14.8 13.8 9.8 13.3 14.3 14.5 14.3 13.6 13.1 11.9 2 12.835 None
14 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D 18.8 20.3 13.4 13.4 13.3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 14.39 14.9 LS/D LS/D LS/D 13.3 15.4985714285714 None
14 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 13.5 11.8 12.4 12 11.7 11.8 13 13.3 13.2 13.4 13.3 13.5 13.1 12.8 LS/D LS/D O/C O/C O/C O/C O/C O/C O/C O/C 11.7 12.7714285714286 None
14 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 11.3 10.6 10.3 10.2 10.6 11.9 LS/D LS/D LS/D LS/D LS/D I/S I/S E/F I/S I/S I/S E/F 15.9 LS/D LS/D LS/D LS/D LS/D 10.2 11.5428571428571 None
14 Feb 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 4.9 4 4.4 4.3 4.1 4 INST.O/C INST.O/C I/S 0.9 1 1 1 1 1 1 1 5 5.4 5.5 5.4 5.5 5.4 5.1 0.9 3.37619047619048 None
14 Feb 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
14 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 12.9 10.7 10.7 9.9 10 10.7 10.2 9.9 10.2 9.9 10.7 I/S 11.1 11.4 11.5 11.7 11.1 11.5 12.3 12.2 13.2 13.7 13.2 12.6 9.9 11.3608695652174 None
14 Feb 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 5.4 5.1 14.6 14.1 14 6.8 6.9 LS/D LS/D LS/D LS/D 1 8.4 8.36 3.06 13.5 3 LS/D LS/D LS/D LS/D 9.81 11.76 8.32 1 8.381875 None
14 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 5.1 4.7 5 4.9 4.8 4.7 4.2 5.3 5.9 5.9 5.3 5.7 5.3 5.1 5.5 5.4 6 5.5 INST. E/F 5.8 5.5 5.5 5.2 4.5 4.2 5.25217391304348 None
14 Feb 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.35 5 4.98 4.53 4.7 4.6 LS/D LS/D LS/D LS/D 4.16 3.76 LS/D 2.35 4.26 None
14 Feb 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 10.8 8.9 9.7 9.1 8.5 8.9 8.9 9.4 9.8 9.8 10.5 10.7 10.8 10.7 8.8 14.3 14.2 13.8 14.4 15 15 15 14.2 13.4 8.5 11.4416666666667 None
14 Feb 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
14 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.15 0.15 0.15 0.15 0.15 0.15 0.2 0.15 0.15 0.15 0.15 0.3 0.2 0.15 0.15 0.15 0.15 0.177083333333333 None
14 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 1.4 1.45 1.45 1.3 1.05 1 1.6 1.5 5.75 1.8 1.7 1.8 2.1 LS/G 1.35 1.7 1.75 1.7 1.9 2 2.05 1.9 1.8 1.65 1 1.81304347826087 None
14 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 5.7 5.6 5.6 5.8 5.4 5.3 5.1 4.7 4.4 4.4 5.28888888888889 None
14 Feb 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 16 13 13 14 13 12 12 12 11.3 11.3 11.7 12.17 12.3 9.5 12.7 13.2 13.2 13.7 14.7 15.3 15.29 LS/G LS/G LS/G 9.5 12.9219047619048 None
14 Feb 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 4.7 4.5 4.5 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 7.6 7.7 9 8.5 8.8 O/C&E/F O/C&E/F O/C&E/F 9.5 10 11.3 10.6 1.6 2.8 2.6 2.2 1.6 6.61875 None
14 Feb 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 2 2.05 2.1 1.7 2 1.35 1.5 2.1 2.25 2.25 2.8 2.7 2 1.95 1.95 2.1 2 1.55 1.3 1.7 1.9 2 1.7 1.8 1.3 1.94791666666667 None
14 Feb 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC E/F E/F E/F E/F E/F E/F E/F 1.4 1.3 6.5 E/F E/F E/F 1.2 4 O/C O/C O/C O/C O/C 6.6 6 5.5 5 1.2 4.16666666666667 None
14 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 17 15 13 13 13 13 13 13 13.2 13 13.2 13.2 13.5 13.5 13.4 13.9 14.2 E/F LS/G LS/G LS/G 10.5 17.5 15.9 10.5 13.75 None
14 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 16.8 15.4 14.2 14.7 14.9 15.7 INSTO/C,B/C INST. O/C,B/C INST. O/C,B/C INST. O/C,B/C INST. O/C,B/C INST. O/C,B/C 5.6 5 5 5.2 5.2 5.3 EMRG EMRG EMRG EMRG EMRG EMRG 5 10.25 None
14 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC LS/G LS/G LS/G LS/G LS/G LS/G LS/G 6 6 8.25 8.5 8.75 LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G LS/G 1.5 1.5 6.5 None
14 Feb 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC 4 3.5 3.55 4 4.4 4.4 4.5 LS/G LS/G LS/G LS/G LS/G 5.4 5.35 INST. OC/EF INST. OC/EF INST. OC/EF INST. OC/EF INST. OC/EF LS/G LS/G LS/G LS/G LS/G 3.5 4.34444444444444 None
14 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 2.6 2.4 2.4 2.3 2.4 2.7 3 3.1 3.2 3.2 3.1 3.2 2.8 3 3.1 3.1 6.7 6.7 3.2 3.2 3 2.8 2.6 2.5 2.3 3.17916666666667 None
14 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 16.1 L/SD 11.35 10.1 9.55 9.7 11.1 10.35 10 10.15 10.2 4.45 4.4 8.9 10.45 10.35 10.35 7.7 11.7 L/SHED L/SHED L/SHED L/SHED L/SHED 4.4 9.82777777777778 None
14 Feb 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 2.2 2.1 2.1 2.1 1.9 1 1.2 1.1 I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 1.2 2.8 2.9 2.6 2.3 1 1.96153846153846 None
14 Feb 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 13 12 11 10 10 10 9.4 9.3 9.3 9.4 8 9.4 10.17 10 10.2 10.5 10.6 11.12 12.4 12.8 12.92 12.9 12.4 11.6 8 10.7670833333333 None
14 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
14 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.9 0.9 0.9 0.8 1 1 1 1 1.1 1.2 1.2 1.3 1.4 1.3 1.2 1.2 1.2 1.2 1.3 1.3 1.3 1.2 1 1 0.8 1.12083333333333 None
14 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 2.1 1.9 1.7 1.7 1.7 1.9 1.9 2 1.9 1.5 1.9 2 2 2.1 2.2 2.3 2.2 1.2 1.4 1.5 2.7 2.9 2.6 2.4 1.2 1.9875 None
14 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.5 0.7 0.7 0.5 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.7 0.6 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.4 0.579166666666666 None
14 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 5.8 5.45 5 LS/D LS/D 5.45 5.15 14.4 9.3 9.05 13.65 13.2 5.3 13.1 13.5 13.6 13.75 10 L/SHED L/SHED L/SHED 12.1 11.75 11.25 5 10.0421052631579 None
14 Feb 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 5.3 5.1 5 5.5 6.6 9 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.6 4.2 INST. E/F INST. E/F INST. E/F INST. E/F 6 5.5 5.8 5.8 5.7 0.6 3.73 None
14 Feb 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F 0.5 0.5 0.5 0.5 8.2 8.2 8.4 8 9.2 E/F E/F E/F E/F E/F E/F E/F E/F 0.5 4.88888888888889 None
14 Feb 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1.7 1.6 1.6 1.8 2 2.8 3.6 3.7 1.6 E/F E/F 4.3 4.6 9.2 9 E/F E/F E/F E/F E/F 3.4 3.3 2.8 1.9 1.6 3.46470588235294 None
14 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 3.9 3.5 3.8 3.6 3.4 3.5 3.4 3.3 3.4 3.5 3.4 3.6 3.5 3.5 3.8 3.4 2.8 3.8 3.6 3.7 3.7 3.7 3.6 3.6 2.8 3.54166666666667 None
14 Feb 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 3.85 3.85 3.8 3.8 3.85 4 LS/G LS/G LS/G LS/G LS/G LS/G 2 7.6 5.3 8 8 7.8 7.3 8.45 9.7 9.55 8.65 8.5 2 6.33333333333333 None
14 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 nan None
14 Feb 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC LS/D LS/D LS/D LS/D 1.2 2.8 2.7 2.6 2.8 3.3 3.5 3.3 3.4 3.3 3.4 3.3 3.4 3.5 3.4 3.7 2.6 2.4 2.2 2.1 1.2 2.945 None
14 Feb 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 21 20 19 18 17 18 18 19 20.9 23.5 24.9 25.9 26.3 26.4 26.4 27.1 26.8 26.6 27.8 27 25.39 24.2 23.4 21.8 17 23.0995833333333 None
14 Feb 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 0.5 0.5 0.5 0.5 0.6 0.7 0.9 1 0.9 0.9 0.9 0.7 0.7 0.7 0.7 0.7 0.8 0.8 1 1 0.8 0.7 0.6 0.6 0.5 0.7375 None
14 Feb 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA NC L/A NC L/A 0.2 0.3 0.3 0.4 0.4 0.1 0.05 0.05 0.05 1.5 0.05 0.05 0.05 0.05 0.05 0.05 0.2 0.4 0.4 0.4 0.3 - 0.05 0.235416666666667 None
14 Feb 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL 1.02 0.99 1.02 0.99 0.96 1.08 1.32 LSD LSD LSD 1.32 1.28 1.36 1.34 1.26 1.26 1.26 1.37 1.44 1.32 1.29 1.17 1.11 - nan nan None
14 Feb 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO TAMBUWAL FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
14 Feb 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 0.9 0.9 0.9 0.9 0.8 0.8 0.8 8 8.7 8.2 0.1 0.1 0.1 0.1 2.4 None
14 Feb 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA 6.3 5.8 5.7 5.6 5.6 6.2 7.6 7.6 7.4 7.2 7.1 6.9 6.5 6.6 6.7 6.6 7 7 7.2 7.8 8.4 7.6 7.7 - 5.6 6.38333333333333 None
14 Feb 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.3 0.1 0.2 0.1 0.2 0.1 0.1 0 0.1 0 0 0.1 0 0 0.1 0 0 0.1 0.2 0.3 0.3 0.3 0.3 - nan nan None
14 Feb 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 6 4 4 4 4 4 4 4 5 4 4 4 4 4 4 4 5 5 5 4 4 5 5 4 4 4.33333333333333 None
14 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 2 1.9 1.9 1.9 1.8 1.9 2 2.1 2.1 2.3 2.4 2.3 1.9 2.6 1.9 1.9 2.6 2.6 3 2.9 3 2.7 3 2.5 1.8 2.3 None
14 Feb 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 - 0.02 0.0183333333333333 None
14 Feb 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA 5.3 3.9 5.3 5.2 5.3 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5.2 0.658333333333333 None
14 Feb 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA 2.7 2.7 2.5 2.3 2.6 2.7 NCL/A NCL/A NC L/A NC L/A NC L/A NC L/A O/C 2.6 2.7 2.6 2.4 2.4 NCL/A NCL/A NCL/A NCL/A NCL/A - 2.3 0.95 None
14 Feb 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
14 Feb 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
14 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.3 0.1 0.1 0.1 0.1 0.1 0.5 1.1 1 0.9 1 1.1 1.4 0.5 1 1 1.1 1.3 1.1 1.3 1.1 0.1 0.1 0.8 0.1 0.716666666666667 None
14 Feb 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
14 Feb 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 8.1 7.8 7.6 7.7 8.5 9.4 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 10.7 10.2 9.2 8.2 0.1 3.7 None
14 Feb 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 0.4 4.4 4.3 4.3 4.5 2.5 4.7 4.6 0.5 0.5 0.5 0.5 0.2 0.2 0.2 0.2 0.2 0.2 0.5 0.5 0.5 0.5 0.5 - 0.2 1.29583333333333 None
14 Feb 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.4 0.3 0.4 0.4 0.6 0.5 1 1 1.1 0.8 0.8 0.8 0.08 0.8 0.8 0.8 0.8 0.6 0.6 0.6 0.4 0.4 - 0.08 0.5825 None
14 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 19.8 17.8 9.3 5.2 5.4 6 0.3 0.2 1.7 1.6 1.6 1.6 1.5 11.4 6.1 17 7.2 1.6 6.3 2 1.6 7.7 7.5 - 0.2 4.5625 None
14 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 8.8 10 6 0.5 0.5 0.5 0.5 0.5 0.4 0.5 0.5 0.5 0.6 0.6 0.8 0.6 6.1 0.6 0.7 6.2 6.4 6.1 0.6 - 0.4 1.67916666666667 None
14 Feb 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 5.5 4.4 4.6 4.6 5.3 5.2 5.7 5.5 5.9 3.2 3.2 2.9 3.2 6.4 6.6 6.3 6.4 2.7 2.3 NCL/A 0.2 0.2 0.2 - 0.2 3.36666666666667 None
14 Feb 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 2.7 2.6 2.4 2.5 2.6 1 0.2 0.2 0.2 0.2 3.1 3.1 0.5 1.5 1.9 0.9 0.9 0.9 0.9 0.6 0.5 3.6 3.4 - 0.2 1.4125 None
14 Feb 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 2.1 2 2 2 2.2 2.4 3.1 2.8 2.9 2.7 2.8 2.5 2.5 3 NCL/A NCL/A NCL/A 3.6 NCL/A NCL/A NCL/A NCL/A NCL/A - 2 1.4375 None
14 Feb 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 1.3 1.1 1.1 1.1 1 1 1.4 1.5 2 2.4 2.5 2.7 2.5 2.5 2 2.2 2.1 NCL/A 2.3 2.3 2.3 2 1.8 - 1 1.6875 None
14 Feb 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 9.29 9.65 9.51 9.48 9.82 LSD LSD 10.77 11.69 0.02 0.03 0.03 0.03 0.03 0.03 0.09 10.45 10.53 9.53 4.43 11 10.57 9.88 - 0.02 5.30416666666667 None
14 Feb 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 4.11 4.03 3.94 3.91 3.95 4.33 5.24 OC&EF 2.82 2.87 2.83 3.56 2.51 3.22 5.42 5.89 5.92 6.26 6.39 5.79 5.28 4.93 4.56 - nan nan None
14 Feb 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.3 0.2 0.2 0.2 0.2 0.2 0.2 - 0.1 0.1875 None
14 Feb 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 5 4.4 4.2 4 4.3 4.4 5 5 4.7 O/C 2.7 3 3 0 4.7 4.2 4.2 0 3.6 4 3.8 3.6 0.1 - 0 3.02916666666667 None
14 Feb 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA 6.1 5.7 5.6 5.4 5.7 LSD LSD LSD LSD LSD LSD LSD LSD 5.8 LSD LSD 6.1 6 LSD LSD LSD LSD LSD - 5.4 1.20833333333333 None
14 Feb 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 1.7 1.5 1.5 1.5 1.5 1.8 2.4 2.6 2.4 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.5 0.5 0.5 2.1 - 0.5 1.025 None
14 Feb 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 0.19 0.19 0.21 0.2 0.2 0.27 0.27 0.23 0.21 0.28 0.28 0.28 0.27 0.27 0.26 0.25 0.2 0.19 0.21 0.24 0.21 0.21 0.21 - 0.19 0.215833333333333 None
14 Feb 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.08 0.08 0.07 0.08 0.08 0.09 0.07 0.06 0.1 0.07 0.08 0.09 0.08 0.08 0.07 0.08 0.1 0.08 0.08 0.08 0.08 0.08 0.08 - nan nan None
14 Feb 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 10.25 10.3 10.35 10.1 8.2 8.45 4.15 3.95 7.25 6.55 6.2 7.95 7.15 7 3.5 7.9 7.55 10 10.15 6.55 6.85 6.5 6.2 - 3.5 6.61041666666667 None
14 Feb 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
14 Feb 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A NCL/A O/C O/C O/C O/C O/C O/C 4.2 5.6 5.5 5.2 5.2 5 5 NCL/A NCL/A NCL/A NCL/A NCL/A - 4.2 1.4875 None
14 Feb 2026 None YAURI TR2-40MVA KOKO — KADUNA E/F E/F E/F E/F E/F E/F DS DS DS E/F DS DS DS DS DS DS DS DS DS 1.3 1.6 DS DS - 1.3 0.120833333333333 None
14 Feb 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA 5.1 4.8 4.4 2.3 2.2 5.1 EF/OC EF/OC EF/OC EF/OC EF/OC 5.9 7.2 7.5 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 3.1 5.5 - 2.2 2.0125 None
14 Feb 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 2.3 0.1 - 0.1 0.254166666666667 None
14 Feb 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 4.1 3.9 3.8 3.6 3.6 4 3.3 0.7 0.8 0.9 0.9 0.9 0.8 0.7 0.1 2.1 2.8 2.6 2.6 2.9 3.1 3.1 3 - 0.1 2.04583333333333 None
14 Feb 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0 0 0 0 0 0 0 0 0 0.1 0.3 0.2 0.5 0.4 0.4 0.3 0.4 0 0 0 0 0 0 - 0 0.108333333333333 None
14 Feb 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A NCL/A 9.5 11.2 11.7 NC L/A NC L/A NC L/A NC L/A NC L/A NC L/A NC L/A NC L/A NC L/A 3.3 NCL/A NCL/A NCL/A NCL/A NCL/A - 3.3 1.4875 None
14 Feb 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA NC L/A 3.4 3.6 3.6 3.8 3.6 4.9 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A - 3.6 0.8125 None
14 Feb 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.55 0.55 0.55 0.65 0.55 0.6 0.6 0.6 0.55 0.5 0.55 0.55 0.55 0.55 0.55 0.5 0.55 0.55 0.65 0.7 0.7 0.7 0.6 - 0.5 0.535416666666667 None
14 Feb 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 1.5 1.5 1.4 1.3 1.4 1.4 1.8 1.5 7.2 7 6.8 6.4 4.7 4.7 2.9 2.9 MTD MTD 1.8 1.8 1.7 2.1 2 - 1.3 2.6125 None
14 Feb 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0.17 0.21 0.23 0.25 0.2 0.2 0.21 0.2 0.2 0.21 0.21 0.22 0.24 0.2 0.24 0.21 0.23 0.23 0.22 0.15 0.14 0.16 0.16 - nan nan None
14 Feb 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 2.75 8.15 7.95 8.4 7.9 8.45 2.9 2.75 2.95 8.45 8.9 8.4 2.8 2.3 2.6 3.8 4.3 3.8 3.85 3.3 3.25 4.2 4.35 - 2.3 4.58333333333333 None
14 Feb 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F - 0 0 None
14 Feb 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 5.2 7.6 7.7 7.6 5.3 5.6 10.9 10.7 0.8 1.5 1.8 1.4 1.6 1.1 1.5 2.1 2 5.6 1.4 6.4 6 6 4.6 - 0.8 4.02083333333333 None
14 Feb 2026 None YAURI TR1-40MVA NGASKI — KADUNA 1.8 1.4 1.4 1.4 1.4 DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS - 1.4 0.175 None
14 Feb 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A NCL/A 2.3 3.1 2.5 3.4 3.3 3 3 3 2.6 3.5 2.8 2.6 2.3 2.5 NCL/A NCL/A NCL/A NCL/A - 2.3 1.6625 None
14 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC I/S 1.7 1.7 1.7 1.7 1.8 0.1 I/S 0.1 0.1 0.2 0.1 0.1 2.1 O/C O/C 2.3 2.4 2.3 2.3 3.9 3.8 3.5 3.3 0.1 1.76 None
14 Feb 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 1.1 1.1 1.1 1 0.9 0.9 1.1 1.2 7.6 8 7.5 6.7 4.3 4.3 4.3 MTD 3.3 1.1 1.2 1.2 1.1 6 1.1 - 0.9 2.70833333333333 None
« Previous Page 192 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —