Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
18 Feb 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA 8.1 7.5 7.1 7.5 6.4 6.3 7.1 7 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 7.7 8.7 12.5 11.4 - 6.3 3.8 None
18 Feb 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.4 0.2 0.2 0.2 0.3 0.3 0 0.1 0.1 0 0.1 0.1 0 0.1 0.1 0 0.1 0 0.3 0.3 0.4 0.4 0.4 - nan nan None
18 Feb 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 4 4 3 4 4 4 7 6 6 4 4 4 2 2 2 4 7 8 9 8 8 8 6 6 2 5.16666666666667 None
18 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 1.8 1.8 1.8 1.8 1.9 1.9 2.2 2 2 2 2.1 2.1 2.2 2.3 2.3 2.5 2.5 OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 1.8 2.07058823529412 None
18 Feb 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 - 0.02 0.0183333333333333 None
18 Feb 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA 5 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 6.4 6.5 EF EF LSD LSD LSD LSD LSD LSD LSD LSD - 6.4 0.804166666666667 None
18 Feb 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA 2.4 2.3 2.3 2.5 2.8 2.7 2.7 2.3 2.3 2.3 2.2 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A - 2.2 1.0125 None
18 Feb 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
18 Feb 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
18 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.6 1 0.9 0.8 1 0.9 1 0.4 1.1 0.7 0.7 1.1 0.7 0.9 L/S L/S L/S L/S 0.1 0.62 None
18 Feb 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
18 Feb 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC E/F E/F E/F E/F E/F E/F E/F 0 E/F E/F E/F E/F 9.2 9.3 13 0.1 0.1 0.1 0.1 0.1 9.9 9.8 7.6 8 0 5.17692307692308 None
18 Feb 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 0.2 0.2 0.2 0.2 6 4.8 4.8 4.5 4.3 4.2 0.4 0.4 0.4 0.4 0.5 0.4 0.4 0.5 0.5 0.5 0.5 5.9 5.2 - 0.2 1.89166666666667 None
18 Feb 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.5 0.5 0.6 0.6 0.6 0.7 0.8 1 1 1.1 1.1 1.1 1 1.1 1 1.1 1.1 0.9 E/F 0.7 E/F 0.5 - 0.4 0.704166666666667 None
18 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 17.6 16.1 8.5 4.5 5 5 0.1 0.1 1.3 1.3 1.4 1.4 1.6 12.5 0.1 11.5 12.1 11.8 1.2 13 7.2 7.1 1.3 - 0.1 4.55 None
18 Feb 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 10.4 0.3 5.5 0.4 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.5 0.6 0.6 0.7 5.8 12.7 6.5 0.6 5.9 0.5 0.5 0.4 - 0.3 1.8375 None
18 Feb 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 4.1 3.6 3.7 4 4.3 4.9 4.9 4.8 4.9 4.5 4.5 4.8 0.3 0.2 0.2 0.2 6.7 7.2 4.5 3.5 2.5 2.6 6 - 0.2 3.475 None
18 Feb 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 2.7 2.8 3.4 3.9 4.1 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 3.1 NCL/A 1.3 1.6 0.4 0.25 0.25 0.25 0.4 2 2 - 0.25 1.10208333333333 None
18 Feb 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA NCL/A 2 2.4 2.8 3.3 0.9 1 1.2 1.1 3.4 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A - 0.9 0.670833333333333 None
18 Feb 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 1.3 1 1 1 1 1 1.3 2.1 2.1 2.4 1.8 2.1 2.5 2.1 2 2 1.8 1.8 1.5 2.8 2.5 2.1 2.3 - 1 1.71666666666667 None
18 Feb 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 10.5 3.95 10.63 7.75 8.77 7.62 11.71 6.89 11.05 9.94 - 3.95 4.165 None
18 Feb 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 3.08 3.2 6.6 6.41 6.22 6.59 6.39 5.73 - nan nan None
18 Feb 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.4 0.8 0.8 0.8 0.8 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 - 0.2 0.4125 None
18 Feb 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 4 3.5 3.4 3.5 5.4 1.5 2.3 E/F E/F 4.7 4.4 4.3 1.6 E/F 0.6 1.6 2.2 2.2 3.8 3.9 3.8 0.1 1.4 - 0.1 2.32083333333333 None
18 Feb 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA LSD 7 7 7.3 LSD LSD LSD LSD 6.6 6.5 6.6 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 6.5 1.125 None
18 Feb 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 1.6 1.5 1.4 1.6 2.1 1.9 0.4 0.4 0.5 0.5 0.4 0.4 0.4 0.6 0.6 0.7 0.7 0.7 0.6 0.5 0.4 2.3 2.1 - 0.4 0.870833333333333 None
18 Feb 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 0.23 0.23 0.23 0.24 0.25 0.24 0.25 0.26 0.25 0.25 0.25 0.25 0.25 0.18 0.23 0.19 0.2 0.19 0.22 0.17 0.23 0.21 0.2 - 0.17 0.205 None
18 Feb 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.07 0.07 0.07 0.07 0.08 0.08 0.08 0.06 0.07 0.08 0.06 0.07 0.06 0.07 0.07 - nan nan None
18 Feb 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 5.75 6.1 8.9 10.5 10.6 2.7 8.55 8.2 8.55 8.35 8.85 6.35 6.4 6.45 6.55 7.6 8 3.8 7.25 10.7 11.2 7.7 9.6 - 2.7 7.32083333333333 None
18 Feb 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
18 Feb 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA NC L/A NC L/A NC L/A NC L/A NC L/A NC L/A O/C O/C 5.2 OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF DS DS 5.9 5.8 NCL/A NCL/A NCL/A - 5.2 0.704166666666667 None
18 Feb 2026 None YAURI TR2-40MVA KOKO — KADUNA DS DS DS DS DS DS DS DS DS DS DS DS 3.2 3.1 DS DS DS DS DS DS DS DS 2.4 - 2.4 0.3625 None
18 Feb 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 3.3 8.6 9.1 8.7 7.5 E/F 6.8 E/F E/F - 3.3 1.83333333333333 None
18 Feb 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 4.2 5.3 5.3 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A - 4.2 0.616666666666667 None
18 Feb 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 4 3.7 3.6 3.6 3.3 3.6 3.8 0.7 0.7 0.8 0.8 0.9 0.7 0.6 0.6 0.5 6.3 0.6 0.4 0.6 2.2 2.8 3 - 0.4 1.7875 None
18 Feb 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0 0 0 0 0 0 0 0 0 0 0.4 0.4 0.4 0.2 0.4 0.4 0.1 0.1 0.1 0 0 0 0.2 - 0 0.120833333333333 None
18 Feb 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA NC L/A NC L/A NC L/A NC L/A NC L/A NC L/A O/C 8.1 8.2 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 3.7 3.6 3.5 3.2 NCL/A NCL/A NCL/A NCL/A - 3.2 1.2625 None
18 Feb 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA NCL/A NCL/A NCL/A NCL/A 6 5.6 5.7 5.6 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A - 5.6 0.954166666666667 None
18 Feb 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.5 0.5 0.5 0.5 0.55 0.55 0.65 0.5 0.45 0.8 0.4 0.45 0.4 0.45 0.55 0.55 0.65 0.7 0.8 0.75 0.75 0.65 0.55 - 0.4 0.527083333333333 None
18 Feb 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 6.1 6.2 6.2 3.5 3.7 3.7 3.6 3.4 5.3 6.1 5.9 4.4 4.3 NCL/A NCL/A 3.2 3 4.8 2.7 2.8 1.7 3.2 4 - 1.7 3.25 None
18 Feb 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0.19 0.1 0.14 0.19 0.08 0.16 0.15 0.016 0.016 0.015 0.019 0.011 0.16 0.15 0.15 0.16 0.14 0.19 0.16 0.17 0.15 0.16 0.14 - nan nan None
18 Feb 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 4.35 4.4 4.45 2.85 2.65 10.3 1.65 2 2.75 2.75 9.4 3.65 4.8 10.35 4.65 4.75 4.9 4.85 4.5 10.5 4.45 4.6 4.75 - 1.65 4.58958333333333 None
18 Feb 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA 0.1 2.5 2.5 2.6 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.1 2.9 3.2 3.2 0.1 0.2 0.1 0.1 0.1 0.1 0.1 - 0.1 0.679166666666667 None
18 Feb 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 3.7 2.9 2.8 3.5 7.3 8.2 9.2 7.9 4.5 7.9 7.9 7.9 4.9 1.1 5 6.2 0.6 5.8 4.5 4.1 4 4.4 4.1 - 0.6 4.80833333333333 None
18 Feb 2026 None YAURI TR1-40MVA NGASKI — KADUNA DS DS DS DS DS DS DS 2.1 2.2 2 DS DS DS DS DS DS DS DS DS DS DS 2.3 DS - 2 0.358333333333333 None
18 Feb 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA 2.1 2.1 2.3 2.5 2.6 2.6 2.5 3.1 2.7 2.9 3.5 3.5 NCL/A NCL/A NCL/A NCL/A NCL/A 1.8 2.9 2.8 2.8 2.6 2.5 - 1.8 1.90833333333333 None
18 Feb 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 1.5 1.5 1.5 1.6 1.8 1.8 2.5 2 2 2 1.8 0.2 0.2 0.1 0.1 0.1 1.8 1.3 2.7 2.7 1.5 1.1 1.3 1.1 0.1 1.425 None
18 Feb 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 4.3 4.5 6.2 7.4 8.8 10.1 1 1.6 3.8 4.5 4.8 6.6 7 7.2 7.5 2 1.5 1.4 1.2 7.5 7.4 6.7 2.5 - 1 4.57916666666667 None
18 Feb 2026 None SOKOTO TR1- 40/30MVA P/STATN — KADUNA 9 8.4 4.8 5 10.2 6.7 6.5 9.5 12.7 12.4 12.5 6 7.1 7.5 8.2 9.2 9.1 2.4 7.4 8.3 7 6.4 11.8 - 2.4 7.53333333333333 None
18 Feb 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
18 Feb 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.1 O.1 O.1 O.1 O.1 O.1 O.1 0.1 0.3 0.3 0.3 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.155555555555556 None
18 Feb 2026 None B/KEBBI TS TR6-100MVA TAMBUWAL — KADUNA 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.4 0.5 1.9 2.6 2.7 0.6 2 1.9 2 O/C - 0.2 0.8625 None
18 Feb 2026 None KONTAGORA TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA 6.1 5.8 5.7 4.1 4.7 4.6 4.6 4.1 4.9 0.3 4.6 4.1 4.5 4.4 7.1 6.6 6.6 6.6 7.1 7.7 7.5 5.5 5.8 - 0.3 4.85416666666667 None
18 Feb 2026 None SOKOTO TR 3 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL KADUNA 0.2 0.2 0.2 0.2 6.5 7.6 7.2 0.2 4.1 4 0.2 6.2 6.9 7.3 4.1 0.1 0.1 6.2 5.6 5.6 3.9 3.9 0.3 - 0.1 3.35833333333333 None
18 Feb 2026 None BIDA TR5-60MVA Town 11KV fdr — ABUJA CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F S.G S.G S.G S.G S.G LSD 7.6 6.3 6.2 6 LSD LSD - 6 1.0875 None
18 Feb 2026 None B/KEBBI TS TR5-60MVA UNIVERSITY — KADUNA 0.2 0.2 0.2 0.2 0.2 2 0.2 0.1 0.2 0.2 0.3 0.35 0.35 0.8 0.4 0.4 0.2 0.3 0.2 0.2 0.2 0.2 0.2 - 0.1 0.316666666666667 None
18 Feb 2026 None KONTAGORA TR1- 60MVA WATER WORKS 132KV KONTAGORA TS_33KV WATERWORKS FDR_PL_PL ABUJA 0.4 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.6 0.5 0.6 0.4 0.6 0.7 0.4 0.4 0.4 0.4 0.4 0.5 0.4 0.4 0.4 - 0.3 0.383333333333333 None
18 Feb 2026 None SOKOTO TR 3 60MVA YABO — KADUNA 2.7 2.5 2.4 2.5 2.6 2.8 3 3.3 3.4 3.4 3.4 3.6 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 3.6 3.4 3.4 3.9 3.4 - 2.4 2.12916666666667 None
18 Feb 2026 None YAURI TR1-40MVA YAURI — KADUNA 2.8 2.7 2.6 3.4 3.5 3.4 0.5 0.5 0.7 0.6 DS DS DS 0.1 0.1 4 0.1 0.1 3.3 3 0.1 0.1 0.1 - 0.1 1.09166666666667 None
18 Feb 2026 None MINNA TS TR7- 60MVA ZARUMAI FDR 132KV MINNA TS_33KV ZARUMAI FDR_PL_PL ABUJA 2.5 2.5 4.6 5.2 5.7 5.2 2.2 2.1 4.5 6 6.2 2.7 4.1 4.2 4.3 2 3 3 4.2 NCL/A NCL/A 3.2 3 - 2 3.25416666666667 None
18 Feb 2026 None YAURI TR1-40MVA ZURU — KADUNA 1 1 1 1 1.1 1 1.2 1.3 1.4 NCL/A 4.7 O/C O/C 0.6 0.6 0.6 0.7 0.7 0.5 0.5 0.6 0.7 0.5 - 0.5 0.8 None
17 Feb 2026 None MINNA TS TR4- 15MVA 11KV CHANCHAGA FDR — ABUJA LSD LSD 5.4 7.4 7.6 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 8.5 8.5 LSD LSD LSD LSD LSD - 5.4 1.55833333333333 None
17 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC 1.67 1.58 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.17 2.5 2.67 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.67 4.33 4 3.83 1.58 3.04666666666667 None
17 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC LL LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2 1.67 1.67 2 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 1.67 1.835 None
17 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC LS/D LS/D 2.5 3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 3.33 3.33 5 3.33 LS/D LS/D LS/D LS/D 2.5 3.415 None
17 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC LS/D LS/D I/S I/S LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D I/S I/S I/S I/S LS/D LS/D LS/D LS/D 0 nan None
17 Feb 2026 None MINNA TS TR3- 15MVA 11KV PARLFDR — ABUJA LSD 9 LSD LSD LSD LSD LSD 5.2 8.2 8 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5.2 0.891666666666667 None
17 Feb 2026 None MINNA TS TR4- 15MVA 11KV SHIROROFDR — ABUJA 2.8 LSD LSD LSD LSD 3.7 3.4 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 3.4 0.295833333333333 None
17 Feb 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC 0.63 0.55 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0.5 0.67 0.72 0.5 0.58 0.83 LS/D LS/D LS/D LS/D 0.33 0.37 0.25 0.28 0.25 0.5175 None
17 Feb 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 1.4 0.3 0.3 1.2 1.2 1.1 1.1 1.4 1.5 1.7 1.8 1.8 1.7 1.8 1.9 1.9 1.8 1.5 1.6 1.6 1.6 1.4 1.3 1.3 0.3 1.425 None
17 Feb 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 1.5 1.75 4 1.5 4 1.75 2 3.5 1.5 2.5 2 1 1.5 2.5 4 1 4 5 8.1 1.7 1.55 1.45 1.3 1.2 1 2.5125 None
17 Feb 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 3.2 3.1 3.2 2.8 3.2 3.2 0.6 0.4 0.4 0.3 2.6 0.8 1.3 2.1 2.2 2.2 2.2 2.3 2.4 2.8 2.9 2.5 2.4 3.8 0.3 2.20416666666667 None
17 Feb 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 3.5 3.4 3.3 3.3 3.5 3.2 3.2 3.3 3.2 3.3 3.3 3.7 4 3.6 3.2 3.2 3.4 3.4 3.4 3.3 3.5 3.4 3.4 3.5 3.2 3.39583333333333 None
17 Feb 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC L/SHED L/SHED 17.5 LS/D 17.4 L/SHED L/SHED L/SHED L/SHED L/SHED L/SHED L/SHED L/SHED L/SHED 25.9 19.4 26.8 L/SHED L/SHED 24.15 22.9 LS/D LS/D LS/D 17.4 22.0071428571429 None
17 Feb 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.55 0.55 0.5 0.5 0.55 0.7 0.7 0.6 0.5 0.5 0.5 0.4 0.4 0.5 0.6 0.65 0.65 0.8 0.8 0.8 0.8 0.65 0.6 0.6 0.4 0.6 None
17 Feb 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC 13.3 13.1 9.9 9.3 9.2 9.5 9.4 9.9 8.95 8.4 8.2 8.1 8.3 8.3 E/F E/F E/F E/F 15.5 16.05 15.6 15.2 14 13.15 8.1 11.1675 None
17 Feb 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC 16.2 15.8 10.2 15.8 16.6 19 18.8 12.4 12.25 10.2 7.2 10.6 10.7 L/SHED L/SHED 11.55 12.85 17.5 PH/IMB PH/IMB PH/IMB PH/IMB PH/IMB 15.45 7.2 13.7117647058824 None
17 Feb 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
17 Feb 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 6.8 6.7 6.4 6.3 6.5 O/C 4 4.5 4.8 7.1 7.4 9 11.5 E/F E/F E/F E/F E/F E/F 4.2 12.5 17 16.2 18.2 4 8.77058823529412 None
17 Feb 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC 6.7 6.6 6.4 6.4 6.8 8.1 8.6 8.2 8 8.1 7.1 7.1 7.2 6.6 6.8 7.8 8.1 2.5 2.5 2.5 2.4 8.6 7.9 7.3 2.4 6.59583333333333 None
17 Feb 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC 3.8 3.6 3.4 3.4 3.7 4.1 4.5 1.3 1.4 1.5 1.4 1.5 1.5 1.5 1.6 1.5 1.4 1.5 1.6 1.6 1.6 INST.O/C&E/F INST.O/C&E/F INST.O/C&E/F 1.3 2.25714285714286 None
17 Feb 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
17 Feb 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 14.6 19.6 19.4 17.8 18.9 20.5 19.8 11 10.5 12 12 19 8.9 11.7 12.2 12.5 17 11.8 INST O/C 11 17.8 INST.O/C&E/F INST.O/C&E/F INST.O/C&E/F 8.9 14.9 None
17 Feb 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 4.81 4.81 4.81 3.94 3.95 6.36 3.99 6.26 7.81 9.4 10.17 10.89 11.27 11.3 11.74 11.23 10.74 8.27 6.31 10.6 5 6.32 5.26 5.08 3.94 7.51333333333333 None
17 Feb 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 4.5 4.3 4.3 4 4 4 4 4.2 5 5.3 4.9 5.1 5.3 5.7 5.5 5.6 5.9 4.8 5.2 5.2 4.9 INST.O/C&E/F INST.O/C&E/F INST.O/C&E/F 4 4.84285714285714 None
17 Feb 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 9.39 9.39 9.39 9.31 9.32 11.83 7.72 10.87 11.33 14.47 15.03 15.66 16.25 16.62 16.39 16.51 16.54 14.96 13.14 11.63 13 12.9 11.79 11 7.72 12.685 None
17 Feb 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 2.7 2.7 2.7 2.36 2.36 3.3 2.16 4.03 4.74 6.78 7.47 7.94 8.19 8.25 8.4 8.07 7.65 6.53 4.88 3.93 3 2.77 2.84 2.78 2.16 4.85541666666667 None
17 Feb 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 6.55 6.55 6.55 6.06 6.06 7.88 5.22 13.05 4.95 EF EF EF 0.65 15.77 17.96 17.1 16.09 16.35 12.9 9.56 8 8.9 6.3 6.54 0.65 9.47571428571429 None
17 Feb 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 14.88 14.88 14.88 12.76 12.77 18.38 11.84 11.27 11.83 16.4 17.13 21.44 23.76 23.02 19.69 19.55 19.35 19.03 13.05 12.92 12 11.9 17.2 16.39 11.27 16.0966666666667 None
17 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
17 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 18.52 18.52 18.52 15.79 15.79 20.68 13.52 15.91 13.97 17.39 17.71 18.03 18.63 17.95 14.94 14.92 13.92 15.6 16.65 18.48 18 21.4 19.74 19.73 13.52 17.2629166666667 None
17 Feb 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
17 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 7.8 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 12.4 12.2 11.7 11.5 11.4 11.6 12.2 14.1 10 15.1 14.2 13.6 E/F 7.8 12.1384615384615 None
17 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 12.7 16.3 13.8 13.9 13.5 14.3 14 12.9 13.3 13.9 14.2 E E 15.6 16.1 16.6 16.8 17.2 12.6 12.8 8.9 14.6 15.9 14.6 8.9 14.2954545454545 None
17 Feb 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
17 Feb 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
17 Feb 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.43 0.34 I/S 0.33 I/S 0.25 0.24 I/S I/S I/S I/S I/S I/S I/S 0.24 0.318 None
17 Feb 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.61 1.47 1.4 1.3 1.3 1.4 1.2 1.1 0.9 0.86 0.89 0.95 0.94 0.9 0.95 0.98 1.03 1.18 1.49 1.64 1.63 1.69 1.66 1.5 0.86 1.24875 None
17 Feb 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 8.65 8.1 7.85 7.6 8.1 9 9.75 10.95 13.05 14.1 14.05 14.55 14.6 15.15 12.8 1.8 12.15 11.05 9.3 10.4 10.3 8.85 9.5 8.9 1.8 10.4395833333333 None
17 Feb 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 6.3 5.75 5.45 5.55 5.7 5.75 6.95 8.05 9.7 10.5 10.45 10.15 10.5 10.85 11.3 10.9 L/S L/S 9.1 8.6 8.1 7.8 7.2 6.7 5.45 8.24318181818182 None
« Previous Page 186 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —