Hourly Load Profile (Unified)
Average Hourly Load Analysis
Multi-select enabled
Attribution Analysis Upload Load Report

Average Hourly Load (MW)

Detailed Hourly Readings
Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
17 Jul 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H3 132KV APO TS_33KV FDR H3_PL_PL AEDC 11.7 11.5 11.3 11.3 8.75 12.4 10.55 11.75 12 12.45 12.05 12.95 13.4 13.35 12.5 12 11.85 10.75 11.15 11.35 11 10.55 7.4 9.1 7.4 11.37916667 None
17 Jul 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H31 132KV APO TS_33KV FDR H31_PL_PL AEDC 9.7 9.2 9 8.95 9.75 10.75 11.9 11.75 11.4 9 9.15 8.65 11.65 11.4 12 11.9 11.85 12.25 13 14.6 13.9 13.4 12.5 4.35 4.35 10.91666667 None
17 Jul 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC 8.6 8.1 7.8 7.75 8.25 9.8 11.6 10.85 10.5 9.7 9.2 8.9 8.85 8.75 8.45 6.9 INST.E/F INST.E/F INST.E/F INST.E/F 21.75 22.85 19.45 16.6 6.9 11.2325 None
17 Jul 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 4.2 4 3.95 3.8 4 4.2 6.95 7 6.6 6.2 6.05 6.05 6 5.95 6 6.05 6.5 6.85 7.7 6 5.4 5.8 5.35 5 3.8 5.65 None
17 Jul 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 4 3.8 3.6 3.55 3.55 3.85 4 3.8 3.6 3.6 3.65 3.45 3.7 3.25 3.45 3.35 3.65 3.75 3.8 4.2 5.2 4.95 4.65 4.45 3.25 3.86875 None
17 Jul 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 8.9 8.6 8.5 8.1 8.2 8.6 8.8 9.3 9.6 9.8 - - - - - - - - - - 12.2 10.7 - - None None None
17 Jul 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 9.6 8.95 8.55 8.35 8.85 9.85 10.5 10.95 11.3 6.2 11.7 11.35 11.9 11.55 11.7 11.3 8.4 10.7 11.3 11.85 11.4 10.75 9.15 9.3 6.2 10.22708333 None
17 Jul 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.45 1.5 1.5 1.5 1.35 1.25 1.5 1.55 1.5 4.15 1 1.05 1.05 0.95 1.25 1.1 1.7 1.65 1.85 1.65 1.6 1.45 1.4 0.3 0.3 1.46875 None
17 Jul 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC 9 8.4 8.2 8.1 9 10 10.6 10.4 10.2 9.9 OC/EF OC/EF SG SG SG SG SG WT 15.7 16.8 16 14.2 12.4 10.9 8.1 11.2375 None
17 Jul 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC L/SD 11.2 9.7 9.5 10.6 12.5 14.1 13.7 12.8 12.2 0 11.9 11.9 11.5 11.7 12.5 13 13.9 16.1 17 LS/D LS/D LS/D LS/D 0 11.88421053 None
17 Jul 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC 3.5 3.4 3.3 3.3 3.7 4.5 4.7 4.4 4 4.2 0 4.1 4.2 4.3 4.4 4.5 4.7 LS/D LS/D LS/D LS/D 7 5.6 4.7 0 4.125 None
17 Jul 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC 5.1 O/C 4 8 5.3 6.4 7.3 6.6 13 8.2 8.4 8.1 11.5 LS/D LS/D LS/D LS/D 14.3 14.9 15.6 14.4 1.2 7 8.8 1.2 8.847368421 None
17 Jul 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC 7.5 7.1 7.1 7.3 9.2 11.8 14.2 12.2 11.4 9.4 10 9.8 10.8 11 11.1 11.6 11.2 12.1 13.8 LS/D LS/D LS/D LS/D 10 7.1 10.43 None
17 Jul 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC 5.1 4.3 4.7 4.7 5.5 6.7 L/SD L/SD L/SD L/SD 7.5 7 7.2 6 7.1 7.1 7.4 7.8 7 LS/D LS/D 9.3 7.7 6.6 4.3 6.594444444 None
17 Jul 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 7 6.6 6.6 6.4 6.7 7.2 7.9 7.4 INST. E/F 1.5 7.7 7 13.5 12.2 11.8 10 11.8 LS/D 12.6 13 12.7 11.7 11.1 INST. E/F 1.5 9.161904762 None
17 Jul 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 13.45 12.66 8.82 8.99 9.89 11.93 13.9 14.2 14.3 SWS SWS SWS 10.6 13.4 15.3 15 19.7 19.9 20.4 14.6 14.8 13.9 16.6 14.5 8.82 14.1352381 None
17 Jul 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 8.5 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 6.7 6 5.5 INST. E/F INST. E/F LS/D 15 14 13.9 15 15.4 14.8 13.9 12.2 10.8 5.5 11.66923077 None
17 Jul 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 5.26 5.33 4.7 4.8 5.47 6.88 8.6 8.8 E/F E/F I/S I/S 2 E/F E/F E/F 2.8 E/F 3.9 13.5 L/SD L/SD 1.9 1.8 1.8 5.41 None
17 Jul 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 3.5 3.6 3.3 3.2 3.3 3.4 3.5 3.5 3.5 3.6 3.5 3.5 3.7 3.6 3.3 3.3 3.2 3.6 3.7 4.2 4 4.1 4 3 3 3.545833333 None
17 Jul 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
17 Jul 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 7.6 7 6.8 6.7 7.1 7.2 7.9 INST. E/F 2.4 8.5 3.4 W.P W.P W.P W.P 10.5 9.6 8.3 9.2 9.2 10 9.3 9.6 INST. E/F 2.4 7.794444444 None
17 Jul 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 9.3 8.87 8.6 4.9 5 7.2 8.1 8.3 8.3 SG SG SG 0.2 0.2 0.2 0.3 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 3.37 None
17 Jul 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 6 5.4 5.7 5.5 5.6 5.2 5 5.5 6.1 6.2 2 W.P W.P W.P W.P 4.8 5 4.5 4.8 3.9 4.9 5.9 5.8 5.8 2 5.18 None
17 Jul 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 #DIV/0! None
17 Jul 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 6.8 6.5 6.4 6.4 6.6 6.8 7.1 8.3 9.1 7.7 INST. E/F W.P W.P W.P W.P 11.8 11.8 10.3 10.9 11.2 10.5 10.5 9.8 INST. E/F 6.4 8.805555556 None
17 Jul 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC - - - - - - - - - - - - 0.6 1.2 1.3 5.9 5.4 5.5 5.5 1.4 4.8 4.4 3.9 5 0.6 3.741666667 None
17 Jul 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 0.4 0.4 0.4 0.4 0.4 0.45 0.4 0.4 0.55 0.55 0.55 0.5 0.4 0.3 0.5 0.55 0.55 0.35 0.4 0.4 0.35 0.4 0.35 0.35 0.3 0.4291666667 None
17 Jul 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GANFENG-PENSTOCK FDR — AEDC 8.2 8.2 8.1 7.6 8.4 7.8 7.4 8.5 7.7 8.1 8.4 8.2 6.4 8.3 8.2 8.5 8.8 8.8 7.5 7.8 7.6 8.6 8.9 8.6 6.4 8.108333333 None
17 Jul 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 1.05 1.05 1.1 1.1 1.1 1.2 1.4 1.3 1.3 1.25 1.7 1.7 1.7 1.65 1.75 1.1 1.1 1.5 8.05 7.7 7.15 1.6 1.65 1.75 1.05 2.164583333 None
17 Jul 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 2.6 2.4 2.4 2.3 2.6 3.1 3.5 3.1 3.1 3.3 3.2 3.3 3.6 3.5 3.6 3.5 3.7 3.7 3.9 4.3 4.1 3.8 3.4 2.8 2.3 3.283333333 None
17 Jul 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 8.74 8.15 7.77 7.69 7.91 8.4 9.22 8.94 8.5 8.7 8.4 8.5 8.5 8.2 EMERG. 10.1 9.2 9.4 11 11 11 11 10 10 7.69 9.144347826 None
17 Jul 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 1.3 1.2 1.2 1.5 2.6 4.8 5.9 4.2 3.4 3.1 3 3 5.6 4.1 4 4.1 4.4 O/C&E/F O/C&E/F O/C&E/F O/C&E/F 2 1.9 1.9 1.2 3.16 None
17 Jul 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 0.95 0.95 0.85 0.95 0.95 0.95 0.9 0.9 1.1 0.5 1.15 1.1 1.1 0.95 1.05 1.1 1.1 0.8 1 0.95 1.35 0.85 0.9 1 0.5 0.975 None
17 Jul 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 0.9 1.2 1.2 1 3.6 3.7 4.1 4 E/F E/F E/F E/F E/F E/F E/F 0.9 2.4625 None
17 Jul 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 8.91 8.54 8.14 8.13 8.68 10.19 11.4 11.4 11 10.8 10.6 10.6 INST. E/F INST. E/F INST. E/F INST. E/F 3.5 3 7 6 6.3 5.9 5.2 5 3 8.0145 None
17 Jul 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 10.7 10.1 10 11.1 12.3 13.9 15.2 14.1 12.7 11.8 11.4 11.1 11.5 11.5 11.7 11.9 6.4 7.2 8.2 9.2 15.5 17.1 14.7 INST. E/F 6.4 11.70869565 None
17 Jul 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC INST.E/F 4.3 INST.E/F 4.35 INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F 7.6 8.85 8 9.15 7.95 2.75 I/S I/S I/S I/S I/S I/S 3 INST.E/F INST.E/F 2.75 6.216666667 None
17 Jul 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC 4 3.85 3.6 3.75 4.25 5.3 8 8.8 8.5 5 8.4 9 LS/D 6.65 5.55 9.65 9.65 9.85 9.05 10 9.4 6 6.25 6.25 3.6 6.989130435 None
17 Jul 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 3.8 3.5 3.5 3.5 5.4 6.3 6.6 6.1 4.9 3.2 3.1 3.1 3.2 4 3.8 3.8 SG 2 7.2 5.6 5.3 5 4.3 3.8 2 4.391304348 None
17 Jul 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 12.15 10.5 9.75 9.75 10.1 10.15 11.35 6.2 11.3 11.2 11 11.2 11.55 11.35 11.6 7 7.3 7.5 7.8 11.5 10.8 10.1 9.1 13 6.2 10.13541667 None
17 Jul 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C I/S I/S I/S 1.9 2.1 O/C O/C O/C 1.9 2 None
17 Jul 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C 0.88 1 0.9 9.8 8.6 7.9 7.1 7.4 7.3 1 8 9 9.5 8.2 8.1 8.9 8.3 0.88 6.581176471 None
17 Jul 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 #DIV/0! None
17 Jul 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.8 0.9 0.9 1 1 1.2 1.2 1.3 1.1 1 1.1 1.1 1.1 1.1 0.8 0.7 0.7 0.6 0.8958333333 None
17 Jul 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 1.4 1.3 1.4 1.4 1.4 1.7 2 1.9 1.8 1.7 1.7 1.7 1.6 1.6 0.4 0.4 0.4 1.1 2.1 2.5 2.4 2.2 1.9 1.1 0.4 1.545833333 None
17 Jul 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.3 0.3 0.4 0.4 0.3 0.4 0.4 3 7.5 8 8.2 6.2 8.7 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.3 0.4 0.5 0.4 0.3 2.05 None
17 Jul 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 7.5 7.1 6.95 6.85 7.5 7.5 10.1 9.85 4.1 4.2 3.9 3.9 4 3.85 10.7 10.6 4.2 10.62 8.1 13.1 12.9 11.4 10.5 9.4 3.85 7.8675 None
17 Jul 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 3.4 3.3 3.3 4.2 6.4 9.5 9.7 0.5 0.5 2.5 3.3 3.4 4.1 0.5 0.5 2.9 INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F 0.5 3.625 None
17 Jul 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 0.4 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 0.4 0.4 None
17 Jul 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 1 1 1.1 1.5 O/C O/C O/C O/C 2.6 E/F E/F 1.7 2.5 2.4 2.4 3.1 3.3 E/F E/F E/F E/F E/F E/F E/F 1 2.054545455 None
17 Jul 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 1.6 1.8 1.9 1.7 1.9 1.7 1.6 2 2.7 2.5 2.1 2.4 1.7 1.7 2 2 2.1 2.1 1.5 1.5 1.5 2.1 2.2 1.9 1.5 1.925 None
17 Jul 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 4.8 4.6 4.55 4.4 4.6 5.4 5.95 6.3 6.6 7 6.95 6.7 6.5 6.55 6 6.3 6.3 I/S I/S I/S I/S 5.75 5.75 5.5 4.4 5.825 None
17 Jul 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 6.8 6 5.8 5.9 7.1 9.3 12 10.5 0.1 0.1 0.1 9.4 10.3 9.9 0.1 0.1 0.1 0.1 0.1 0.1 0.1 12.6 10.3 8.8 0.1 5.2375 None
17 Jul 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 1.7 1.8 1.7 1.7 1.5 2 3 3.3 3 1.4 2.2 2.4 2.2 2.3 3 3.3 2.1 1.9 1.5 2.1 2.3 2.6 O/C O/C 1.4 2.227272727 None
17 Jul 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 13.28 13.3 12.83 12.46 12.89 13.7 15.3 17.3 19.3 21.1 21.8 22.3 17.5 21.3 21.9 21.3 21.4 20 20 21 19 16 12 15 12 17.58166667 None
17 Jul 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 0.4 0.4 0.4 0.4 0.6 0.9 1.2 0.9 0.1 0.1 1 0.1 0.6 0.8 0.2 0..2 0.2 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.4086956522 None
17 Jul 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 3/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0 #DIV/0! None
17 Jul 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 4 4 4 4 4 4 4 4 4 2 4 4 4 4 4 4 4 4 6 6 4 3 3 3 2 3.958333333 None
17 Jul 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 0.5 0.5 0.5 0.5 0.6 0.6 0.7 0.7 0.7 0.7 0.6 O/C 0.5 0.6 0.6 0 0 0 0 0 0 0 0 0.4 0 0.3782608696 None
17 Jul 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F CB/F WP WP WP WP WP 0.3 0.7 0.8 0.3 0.6 None
17 Jul 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC 0.1. 0.1 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.4 0.1 0.4 0.4 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1565217391 None
17 Jul 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 5.3 5.2 5.1 4.5 5.7 8.6 0.1 0.1 0.1 0.1 0.1 0.1 9.2 7.9 0.1 7.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 2.504166667 None
17 Jul 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 3.5 3.4 3.4 3.4 3.6 3.7 2.7 3.1 1.8 2.7 3 3.1 2.7 1.6 1.8 2 0 0 0 0 0 0 0 0 0 1.895833333 None
17 Jul 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
17 Jul 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.2 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1666666667 None
16 Jul 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.67 LS/D LS/D 4.33 4.67 4.33 LS/D LS/D LS/D LS/D 4.33 4.5 None
16 Jul 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC LS/D LS/D LS/D LS/D 0 LS/D 2.67 2.67 2.25 2.08 1.67 1.67 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0 1.858571429 None
16 Jul 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC 2.17 2 2 1.67 2.33 3.17 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 1.67 2.223333333 None
16 Jul 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC I/S I/S I/S I/S I/S LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0 #DIV/0! None
16 Jul 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC 0.28 0.27 0.2 0.25 0.33 0.37 LS/D LS/D LS/D LS/D 0.33 0.33 0.33 0.38 0.42 0.37 0.37 LS/D LS/D LS/D 0.33 0.27 0.23 0.22 0.2 0.3105882353 None
16 Jul 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 1.7 1.6 1.6 1.6 1.5 1.5 1.8 INST.E/F 1.98 INST.E/F INST.E/F 1 1.8 2 1.85 1.85 2.2 1.74 1.69 1.7 1.6 1.8 1.64 1.5 1 1.697619048 None
16 Jul 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 #DIV/0! None
16 Jul 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 3.2 3.3 2.6 2.5 3.5 3.6 0.9 0.3 0.4 0.4 0.4 2 3.5 3.5 3.2 5.7 5.6 4.3 4.2 3.8 4.9 2.8 2.4 2.1 0.3 2.879166667 None
16 Jul 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 3.3 3.3 3.3 3.3 3.3 3.5 3.3 3 3.5 3.5 3.4 3.6 3.5 3.4 3.5 3.5 3.7 3.7 3.7 3.7 3.7 4.2 3.6 4.1 3 3.525 None
16 Jul 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC 13.9 10.05 9.8 13.2 15.2 17.6 INST.O/C&E/F 15.6 14.35 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 21 18.5 20.6 17.3 14.4 9.8 15.5 None
16 Jul 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.55 0.5 0.6 0.6 0.6 0.6 0.75 0.8 0.6 1 0.65 0.55 0.45 0.4 0.3 0.4 0.5 0.6 0.7 0.6 0.6 0.5 0.45 0.45 0.3 0.5729166667 None
16 Jul 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC 7.75 7.15 6.9 12.7 7 7.6 6.05 5.5 4.9 E/F E/F E/F E/F 8.3 6.65 6.2 6.15 6.85 8 8.7 8.6 7.45 7.4 6.65 4.9 7.325 None
16 Jul 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC 13.3 12.45 12 12.3 13.1 14.7 15.9 15.3 14.95 E/F E/F E/F 10.45 8.6 9.95 3.1 3.2 3.5 4 4.45 4.3 13.5 15.05 12.45 3.1 10.31190476 None
16 Jul 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC 0.6 0.5 0.5 0.6 0.6 0.6 0.6 0.6 LNTRIP LNTRIP 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.1 0.5 0.6 0.5 0.6 0.1 0.5227272727 None
16 Jul 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 9.4 9.1 9.7 9.2 10.9 10.8 11.9 E/F E/F E/F 4.6 8.5 8 10.4 10.5 5.7 5.1 5.1 7.6 O/C O/C O/C 11.4 13.7 4.6 8.977777778 None
16 Jul 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC 5.6 5.2 5.1 5.1 5.7 7.2 8.3 7.2 E/F E/F 5.9 5.9 5.8 6.1 1.9 2 1.9 1.9 0.7 0.8 0.7 0.7 0.6 0.5 0.5 3.854545455 None
16 Jul 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC 1.9 1.8 1.7 1.8 2 2.4 2.5 2.3 2.3 2.3 2.2 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 1.2 1.8 2.7 3.3 3.6 3.4 3.3 3 1.2 2.394736842 None
16 Jul 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Jul 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 17.8 17.1 16.8 17.4 20.2 24.7 17.4 14.5 13.8 17.2 16.8 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 5 5.3 5.6 11.8 16.8 14.3 17.6 15.8 5 15.04736842 None
16 Jul 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 3.39 4.01 4.01 3.31 4.19 3.46 4.07 4.41 4.95 4.3 3.71 3.45 4.23 4.75 5.87 5.51 4.36 4.15 4.67 4.39 2.25 2.9 4.12 3.22 2.25 4.07 None
16 Jul 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 3.1 2.8 2.8 2.7 2.8 3.2 3.1 3.2 3.7 3.9 4 O/C&E/F O/C&E/F 3.4 3.6 3.5 3.3 2.8 3.3 3.6 3.5 3.3 3 3 2.7 3.254545455 None
16 Jul 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 7.42 8.45 8.45 6.73 8.43 7.21 9.6 10.8 11.54 8.56 EF 4.5 7.69 9.25 11.29 11.61 10.92 10.32 11.48 9.92 8.26 10.14 8.74 6.59 4.5 9.039130435 None
16 Jul 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 2.43 0.04 0.04 0 2.32 2.54 3.4 4.72 5.87 4.75 2 2.79 3.49 3.15 5.24 6.22 5.28 4.55 3.75 2.57 2.74 3.47 2.99 2.19 0 3.189166667 None
16 Jul 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 5.21 6.14 6.14 5.1 5.98 5.02 7.15 10.06 11.39 7 EF 5.98 10.51 10.41 12.99 12.35 9.79 8.46 8.46 7.85 5.65 6.68 5.99 4.56 4.56 7.776956522 None
16 Jul 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 6 6.54 6.54 5.17 7.06 6.57 8.56 9.2 8.61 7.3 2.6 1.26 2.79 3.02 6.84 7.63 3.04 2.96 3.52 1.91 3.15 3.69 3.31 2.51 1.26 4.990833333 None
16 Jul 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Jul 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 11.8 13.9 13.9 10.98 13.83 12.02 14.08 13.05 13.21 12.35 8.67 5.87 7.87 7.45 10.93 12.87 9.77 11.99 16.45 17.14 13.08 16.93 15.09 10.89 5.87 12.255 None
16 Jul 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Jul 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 8.9 8.4 8.1 8.1 8.4 9.1 10 9 8.8 5.8 7.8 7.4 7.1 7 SG SG SG 6 10.8 11.5 11.2 10.4 9.2 8.2 5.8 8.628571429 None
16 Jul 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 12.5 11.7 11.4 11.2 8.7 9 9.5 9.1 9.7 OC/EF 13.9 12.4 11.1 9.6 9.1 9.8 10.1 12.1 13.5 14.4 14.1 13.6 12.4 11.3 8.7 11.31304348 None
16 Jul 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Jul 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Jul 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.43 0.5 0.26 I/S OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 0.26 0.3966666667 None
16 Jul 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.1 1.1 1 1 0.9 1.1 0.9 1 0.93 OC/EF 0.91 0.82 0.84 0.78 0.78 0.8 0.84 0.86 1.03 1.14 1.17 1.14 1.12 1 0.78 0.967826087 None
16 Jul 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 7.25 6.8 6.7 6.6 6.4 7.7 9.15 10.35 11.15 6.5 7.15 9 9.2 9.65 9.6 9.25 8.65 7.7 8.1 6.85 7.95 7.4 7.1 6.65 6.4 8.035416667 None
« Previous Page 17 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —