Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
11 Mar 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 2 2 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 5.6 4.9 4.8 O/C 1 4.7 4.7 4 3.4 3.5 0.09 5 - 0.09 1.90375 None
11 Mar 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA 5.3 5.1 LSD LSD LSD LSD LSD LSD LSD LSD 6.5 6.6 6.8 6.3 LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5.1 1.525 None
11 Mar 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 0.27 0.27 0.3 0.26 0.26 0.24 0.24 0.27 0.2 0.3 0.3 E/F E/F E/F E/F 3 3 O/C & E/F 0 0 0.31 0.32 0.31 - 0 0.49375 None
11 Mar 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 0.21 0.28 0.34 0.31 0.27 0.24 0.21 0.23 0.2 0.23 0.18 0.21 0.19 0.26 0.21 0.21 0.25 0.21 0.21 0.19 0.2 0.19 0.19 - 0.18 0.2258333333 None
11 Mar 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.07 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.08 0.09 0.09 0.08 0.09 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 - 0.06 0.06958333333 None
11 Mar 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 6.85 6.75 6.2 11 9.2 10 7.6 6.7 9.8 7.85 8.75 6.4 8.35 7.25 6.85 6.7 12.9 7.65 9.7 6.35 6.5 7.05 6.25 - 6.2 7.875 None
11 Mar 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
11 Mar 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA LSG/S LSG/S LSG/S LSG/S LSG/S 5.5 DS DS DS 5.8 5.8 5.8 5.2 5.5 LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S - 5.2 1.4 None
11 Mar 2026 None YAURI TR2-40MVA KOKO — KADUNA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 2.7 DS DS DS DS DS DS DS 2.7 - 2.7 0.3375 None
11 Mar 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA 4.6 4.2 3.6 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 6.6 4.5 4.4 5.6 5.3 5.2 NCL/A NCL/A NCL/A NCL/A - 3.6 1.833333333 None
11 Mar 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA L/SG L/SG 3.8 4.6 4.5 4.4 L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG - 3.8 0.7208333333 None
11 Mar 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 2.9 3.1 2.2 2.4 2.4 0.5 1 0.5 0.7 1 1 1 1.7 0.8 2.3 0.8 0.9 0.8 0.7 0.9 0.8 0.1 0.1 - 0.1 1.2125 None
11 Mar 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0.037 0.037 0.033 0.034 0.033 0.033 0.04 0.04 0 0 0.1 0.1 0.1 0.1 0.1 0.1 0 0 0.038 0 0.043 0.042 0.04 - 0 0.04541666667 None
11 Mar 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S 12.6 LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S 12.5 9.3 - 8.7 1.795833333 None
11 Mar 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA L/SG L/SG L/SG L/SG L/SG L/SG 5.5 5.3 5 4.7 L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG - 4.7 0.8541666667 None
11 Mar 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.7 0.65 0.7 0.65 0.75 0.75 0.65 0.6 0.65 0.65 0.55 0.65 0.6 0.65 0.65 0.7 0.7 0.8 0.85 0.8 0.75 0.75 0.7 - 0.55 0.6895833333 None
11 Mar 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 6.2 6 3.5 3.7 3.9 3.9 6.3 6.3 LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S 5 7.8 3.3 3.1 5.5 4.4 4.7 2.5 2.4 - 2.4 3.391666667 None
11 Mar 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0.01 0 0.01 0 0.01 0 0 0.01 0.03 0.01 0.02 0.01 0.01 0.02 0.01 0.01 0.01 0.02 0.01 0 0.1 0.01 0.01 - 0 0.01375 None
11 Mar 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 4 9.6 NCL/A 0.65 3.4 3.95 4.05 3.85 3.5 4.05 3.85 3.3 4.2 4.05 4.1 9.85 NCL/A 1.05 4.25 3.55 3.75 4.3 4.15 - 0.65 3.825 None
11 Mar 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 0.1 O/C O/C O/C O/C O/C O/C O/C O/C O/C 0.1 - 0.1 0.0125 None
11 Mar 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 5.7 5.5 4.8 5.1 5.1 4.9 5.1 5.2 5.3 5.6 6.2 6.4 5.7 2 2.4 1.7 1 1.4 6.3 6.5 6.3 6.2 1.1 - 1 4.441666667 None
11 Mar 2026 None YAURI TR1-40MVA NGASKI — KADUNA DS DS DS DS DS DS DS 2.6 2.8 DS DS DS DS DS DS DS DS DS DS DS DS DS DS - 2.6 0.225 None
11 Mar 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA 4.5 4 4 4.3 3.9 4.2 2.7 2.5 3.3 OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF 1.5 2.1 3.3 4 3.8 4 3.8 - 1.5 2.433333333 None
11 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 0.5 0.4 0.4 1.6 2.5 2.8 3.5 0.4 0.6 0.6 2.4 2.4 2.5 0.5 0.7 0.6 0.6 0.6 0.5 0.4 0.3 3.3 O/C 2.6 0.3 1.334782609 None
11 Mar 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 3.5 3.4 11.5 12.7 6.7 7.2 6.9 6.9 7.4 5.2 5 5.2 5.5 5.4 2.6 7 8.1 7.5 7.4 1.2 1.3 1.3 1.2 - 1.2 5.475 None
11 Mar 2026 None SOKOTO TR1- 40/30MVA P/STATN — KADUNA 8.8 8.4 8.1 8.1 7.4 7.4 7.6 7.9 8.5 9 8.6 7.4 4 4.4 4.5 4.5 11.7 11.4 9.1 7 4.5 4.3 11 - 4 7.658333333 None
11 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
11 Mar 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.3 0.1 0.2 0.3 0.3 0.1 0.1 0.1 0.3 0.4 0.4 0.1 0.2 0.3 0.2 0.2 0.3 0.1 0.1 0.3 0.3 0.3 0.3 0.1 0.1 0.225 None
11 Mar 2026 None B/KEBBI TS TR6-100MVA TAMBUWAL — KADUNA 3.38 3.38 1.5 2 2 2 O/C O/C O/C 0.4 2.7 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.43 2.1 2.22 2.2 2 - 0.4 1.237916667 None
11 Mar 2026 None KONTAGORA TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA 4.8 4.5 4.3 4.2 4.38 2.9 3.2 3.8 3.8 4.8 2.6 4.9 7.1 7.6 6.1 NCL/A NCL/A 5.8 4.5 4.5 5.1 0.4 0.4 - 0.4 3.928333333 None
11 Mar 2026 None SOKOTO TR 3 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL KADUNA 0.4 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.4 5.1 5.5 0.5 0.1 0.5 8.4 0.5 0.5 0.6 0.6 0.6 0.5 0.5 - 0.1 1.170833333 None
11 Mar 2026 None BIDA TR5-60MVA Town 11KV fdr — ABUJA LSD LSD 5.6 5.7 5.8 5.4 LSD LSD LSD LSD LSD LSD LSD LSD 8.1 LSD 5 5.7 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F - 5 1.720833333 None
11 Mar 2026 None B/KEBBI TS TR5-60MVA UNIVERSITY — KADUNA 0.26 0.26 0.2 0.255 0.29 0.29 0.145 0.15 0.2 0.3 0.5 0.6 0.6 0.5 0.5 0.5 0.4 0.3 0.245 0.7 0.32 0.32 0.29 - 0.145 0.349375 None
11 Mar 2026 None KONTAGORA TR1- 60MVA WATER WORKS 132KV KONTAGORA TS_33KV WATERWORKS FDR_PL_PL ABUJA 0.5 0.3 0.4 0.3 0.4 0.4 0.3 0.4 0.3 MMT 0.4 0.4 0.5 0.5 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 - 0.3 0.4166666667 None
11 Mar 2026 None SOKOTO TR 3 60MVA YABO — KADUNA 1.8 1.8 1.6 1.6 1.6 1.6 1.6 1.6 1.8 O/C 2.8 0.3 0.3 0.7 0.5 0.1 0.2 0.3 0.3 0.4 0.5 0.7 0.8 - 0.1 1.016666667 None
11 Mar 2026 None YAURI TR1-40MVA YAURI — KADUNA 4.3 4.1 3.9 3.5 3.5 3.6 0.7 0.7 0.7 DS DS DS DS DS DS 4.7 4.7 1 4.2 4.2 0.7 0.7 0.7 - 0.7 1.941666667 None
11 Mar 2026 None MINNA TS TR7- 60MVA ZARUMAI FDR 132KV MINNA TS_33KV ZARUMAI FDR_PL_PL ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 3.5 7 4 4 7.4 8.5 7.4 7.3 8 8.6 8.5 3.5 3.5 - 3.5 3.579166667 None
11 Mar 2026 None YAURI TR1-40MVA ZURU — KADUNA 2.5 2.7 NCL/A NCL/A NCL/A NCL/A NCL/A 3.1 2.5 5.8 6.1 2.3 5.5 2.6 2.3 DS DS DS DS E/F DS DS DS - 2.3 1.475 None
10 Mar 2026 None MINNA TS TR4- 15MVA 11KV CHANCHAGA FDR — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 9 9 LSD LSD LSD LSD LSD - 9 0.75 None
10 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.67 5 4.17 LS/D LS/D LS/D 4.17 4.613333333 None
10 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.08 2.17 2.25 2.17 2.32 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.08 2.198 None
10 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0 #DIV/0! None
10 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0 #DIV/0! None
10 Mar 2026 None MINNA TS TR3- 15MVA 11KV PARLFDR — ABUJA LSD LSD LSD LSD LSD LSD 8.2 8 7 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 7 0.9666666667 None
10 Mar 2026 None MINNA TS TR4- 15MVA 11KV SHIROROFDR — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD 3.5 LSD 3.2 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 3.2 0.425 None
10 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC LS/D 0.83 0.77 0.77 0.73 0.73 LS/D LS/D LS/D LS/D LS/D 1.08 1.05 1.03 1 1.03 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0.73 0.902 None
10 Mar 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 1.6 1.5 1.5 1.4 1.5 1.6 1.5 1.8 2 2 2.1 2.1 2.19 2.4 2.3 2.2 2.1 1.9 2 1.9 1.9 1.7 1.7 1.7 1.4 1.857916667 None
10 Mar 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 3.6 3.5 3.3 3.3 4.7 4.45 0.05 5 1.2 2.5 4.5 5 4.5 4.5 4.5 4.5 4 4.65 2.65 5 4 5 1 4 0.05 3.725 None
10 Mar 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 1.8 LS/D LS/D 1.7 1.8 1.7 0.7 2.7 2.5 2.5 2.2 2.1 2.5 2.5 0.7 0.3 0.5 2 2.8 2.6 4.2 4.4 4.1 0.8 0.3 2.140909091 None
10 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 3.3 3.3 3.4 3.3 3.1 3.3 3.4 3.3 3.3 3.3 3.6 3.3 3.4 3.2 3.5 3.5 3.5 3.2 3.6 3.1 3.3 3.4 3.4 3.4 3.1 3.35 None
10 Mar 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC 23 21.9 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 22.15 INST. OF/EF INST. OF/EF INST. OF/EF INST. OF/EF INST. OF/EF INST. OF/EF INST. OF/EF INST. OF/EF 21.9 22.35 None
10 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.6 0.55 0.55 0.5 0.5 0.6 0.55 0.75 0.8 0.85 0.95 0.75 0.8 0.75 0.65 0.7 0.65 0.5 0.6666666667 None
10 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC 15.3 13.4 12.6 12.2 12.6 12.8 LS/D 10.7 E/F E/F 7.6 9.2 9.4 16.05 LS/D LS/D 10.45 10.65 12.05 12.95 13.25 16.9 13.4 12.4 7.6 12.31052632 None
10 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC LS/D LS/D LS/D 14.3 16.3 18.5 19.65 16.6 LS/D 14.3 14.55 LS/D LS/D LS/D 16.5 12.8 9.95 LS/D INST. EF INST. EF INST. EF INST. EF 17 16.5 9.95 15.57916667 None
10 Mar 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC I/S I/S I/S I/S I/S I/S 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.4 I/S I/S I/S I/S I/S I/S I/S 0.4 0.4545454545 None
10 Mar 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 11.1 13.1 16.2 15.7 6.6 6.4 7.5 7.6 2.9 5.3 6.1 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 9.8 8.7 15.5 2.9 9.464285714 None
10 Mar 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 1.2 1.4 7.4 7.5 9.1 7.3 8 7.9 9.8 9.7 9.6 9 LS/D LS/D LS/D 1.2 7.325 None
10 Mar 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC 1.5 1.5 1.5 1.5 1.6 1.7 1.6 1.5 1.5 2.1 2.2 2.1 2.2 2.2 2.2 2 2 2 2 2 2 1.9 1.8 3.1 1.5 1.904166667 None
10 Mar 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
10 Mar 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 9.6 13.1 13.4 15 11.2 12.8 12.1 10.7 15.2 5.6 8 8 8.3 7.3 OC/EF 8.5 10.9 6.3 6.3 11.4 INST.O/C 14.4 13.9 12.8 5.6 10.67272727 None
10 Mar 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 4.9 4.71 4.16 4.77 5.04 5.39 4.87 6.32 9.23 10.77 11.7 12.27 12.28 11.95 12.55 12.2 9.72 7.53 6.84 6.13 5.82 6.23 5.54 5.72 4.16 7.776666667 None
10 Mar 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 4.1 3.9 3.8 3.8 3.9 3.1 3.7 3.6 4.4 4.9 5.2 5.3 5.4 5.6 5.6 5.4 4.9 4.8 4.8 4.8 4.9 4.7 4.4 4.1 3.1 4.545833333 None
10 Mar 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 7.77 7.33 6.48 7.49 7.97 7.54 9.4 9.16 10.35 12.8 13.4 14.8 18.85 17.98 18.02 18.02 13.14 12.44 13.32 12.63 4 5.78 13.28 14.65 4 11.525 None
10 Mar 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 0 0 0 1.13 1.53 1.55 1.69 2.52 3.64 5 8.8 9.88 9.56 9.78 8.37 9.65 7.68 7.34 6.03 4.45 4.09 4.19 3.4 3.76 0 4.751666667 None
10 Mar 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 6.1 5.87 5.07 5.78 5.81 5.57 7.59 9.07 13.4 16.16 17.4 18.2 17.05 17.62 18.04 16.72 14.51 4.32 8.13 8.37 7.89 7.81 6.61 7.54 4.32 10.44291667 None
10 Mar 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 11.75 11.09 10.06 10.98 11.68 11.25 12.62 14.11 17.07 17.02 19.5 20.81 18.64 22.24 21.85 17.93 14.52 15.72 8.46 13.1 12.65 15.68 15.45 20.3 8.46 15.18666667 None
10 Mar 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
10 Mar 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 19.42 18.45 16.69 17.87 18.88 17.84 18.74 17.04 16.82 19.67 20.1 18.85 15.97 12.4 12.92 14.89 12.38 19.17 12.12 4.21 1.21 7.05 17.66 16.65 1.21 15.29166667 None
10 Mar 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
10 Mar 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 13 12.4 12 11.9 12.3 12.9 12.6 10.6 7.8 7.7 7.4 7.6 8 8.4 8.4 5 E/F E/F 11.9 16.6 12.3 12.1 L/S L/S 5 10.545 None
10 Mar 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 17.8 16.8 15.8 15.8 16 15.8 15 14.1 14.9 15.4 15.8 16.2 17 17.3 17.7 16.5 12.8 14.5 L/S L/S 3.2 14.6 15.7 20.3 3.2 15.40909091 None
10 Mar 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
10 Mar 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
10 Mar 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.57 I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.57 0.57 None
10 Mar 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.7 1.6 1.6 1.53 1.55 1.48 1.32 1.1 0.98 0.92 0.93 0.94 0.98 1.02 1.09 1.18 1.11 1.27 1.49 1.7 1.88 1.93 1.86 1.81 0.92 1.37375 None
10 Mar 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 9.9 9.3 8.9 9.2 9.25 9.7 11.1 12.9 15.3 L/S 8 16.55 13 13.35 14 L/S G 14.2 11.95 12.15 11.65 11.65 11.3 10.85 10.5 8 11.57727273 None
10 Mar 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 7 6.3 6.15 5.7 5.95 6.05 6.8 8.75 10.5 11.1 11.6 12.4 12.75 L/S D L/S D L/S D 11.4 9.55 8.4 8.3 8.3 7.7 7.45 7.35 5.7 8.547619048 None
10 Mar 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC L/S L/S L/S L/S L/S L/S L/S L/S L/S 6.95 6.5 6.1 5.95 5.9 6.1 6.35 6.4 6.85 6.95 7.5 7.5 7.55 7.2 6.6 5.9 6.693333333 None
10 Mar 2026 None 132KV APO TS TR1 60MVA 33KV FDR H15 132KV APO TS_33KV FDR H15_PL_PL AEDC 0.0615 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.061 0.08539583333 None
10 Mar 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H2 132KV APO TS_33KV FDR H2_PL_PL AEDC 4.85 4.7 4.35 4.5 4.5 4.6 4.75 5.15 5.75 6.45 6.8 7.15 7.35 7.4 L/S D L/S D L/S D L/S D 5.9 5.9 5.9 5.9 9.4 5.5 4.35 5.84 None
10 Mar 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H21 132KV APO TS_33KV FDR H21_PL_PL AEDC L/S L/S L/S L/S L/S L/S L/S L/S L/S 19.3 17.7 18.15 16.7 13 15.3 L/S G 15 4 19.25 18.35 18.35 15.2 18.15 16.6 4 16.075 None
10 Mar 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H23 132KV APO TS_33KV FDR H23_PL_PL AEDC 11.7 11.1 10.8 7.8 8 8.4 8 8.4 11 7 INST O/C INST O/C INST O/C INST O/C 10 11.8 14.6 10 10.4 11.2 11.2 10.8 10.4 13.6 7 10.31 None
10 Mar 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H3 132KV APO TS_33KV FDR H3_PL_PL AEDC 15.4 15.1 14.25 14.35 14.7 13.55 15.1 16.15 18.1 19.3 19.85 21.05 16.85 15.65 15.693 15.2 13.35 11.4 11.2 17.55 17.55 16.95 16.35 15.5 11.2 15.83929167 None
10 Mar 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H31 132KV APO TS_33KV FDR H31_PL_PL AEDC 10.15 9.5 9 9 9.3 9.95 9.8 9.2 9.75 3.9 10.2 INST E/F 6.35 6.5 7.35 11.85 11.7 11.3 12.2 7.4 7.4 7.25 12.05 L/S D 3.9 9.140909091 None
10 Mar 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC 25.65 23.5 21.4 21 21.9 23.85 23.7 20.5 19.05 L/S D L/S D L/S D L/S D L/S D L/S D L/S D L/S D L/S D L/S D L/S D L/S D L/S D 28.55 27.85 19.05 23.35909091 None
10 Mar 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 10 9.1 8.6 8.5 8.9 9.25 8.9 7.55 7.4 5 5.1 5.3 5.3 5.5 L/S D L/S D L/S D L/S D 4.5 6.3 6.3 12.2 11 10.4 4.5 7.755 None
10 Mar 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 6.65 6.15 5.8 5.8 5.9 2.8 2.7 2.55 2.55 5.4 5.05 5 5.1 5 5.35 5.5 5.5 6 7.1 7.35 7.35 7.8 7.5 7.35 2.55 5.552083333 None
10 Mar 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 15.2 L/S 13.9 13.25 14.15 14.85 15.05 15.65 16.8 17 18.05 L/S D 17.1 18.95 19.55 19.35 17.8 16.95 18.35 18.2 18.2 18.05 17.55 17 13.25 16.86136364 None
10 Mar 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.25 1.1 0.6 1.15 1.1 1.2 1.35 1.45 2 1.5 2.15 1.35 1.45 2.2 2.2 2.25 2.2 2.25 2 2.4 2.35 2.1 1.7 1.75 0.6 1.710416667 None
10 Mar 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC 14.2 LS/D LS/D 15.1 15.7 13 11.8 9.4 9 8.6 8.8 8.9 9.8 9.8 6.9 7.3 7.7 8.3 10.1 13.7 15.7 11.4 14.9 12.9 6.9 11.04545455 None
10 Mar 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC LS/D 19.7 19.4 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D INST. E/F 19.4 19.55 None
10 Mar 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 8.1 7.4 6.8 6.7 6.7 6.9 7 LS/D LS/D LS/D LS/D LS/D LS/D LS/D 8.1 6.7 7.2125 None
10 Mar 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D 11.4 13.3 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 15.6 13.4 12.1 10 10.9 10 12.38571429 None
10 Mar 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 22.8 LS/D LS/D LS/D LS/D LS/D 22.8 22.8 None
10 Mar 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC LS/D LS/D LS/D 10.8 11.1 10.9 10.7 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 13 12.2 11.3 10.7 11.42857143 None
10 Mar 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC O/C O/C O/C O/C O/C O/C O/C 3 3 13.7 12.4 11.5 LS/D LS/D LS/D LS/D LS/D 2.2 16.8 16.4 15.9 15.4 13.9 13.2 2.2 11.45 None
10 Mar 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 15.2 16.3 15.6 16.2 17.5 LS/D LS/D LS/D LS/D LS/D 11.2 11.2 12.1 LS/D LS/D LS/D LS/D LS/D LS/D 11 12.5 11.2 10 11.5 10 13.19230769 None
10 Mar 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 14.7 14.4 14 13.7 14.6 15.1 14.6 12.6 LS/D LS/D LS/D LS/D 13 13.1 LS/D 18 18.3 LS/D LS/D LS/D O/C O/C O/C O/C 12.6 14.675 None
10 Mar 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D 15 14.8 12.89 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 12.89 14.23 None
10 Mar 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 4.1 4.1 4 4 4.3 4.6 4.4 4.2 LS/D 3.7 4 4.3 4.2 4.6 5.1 4.7 4.6 5.2 5.3 5.5 5.6 5.5 5.3 5.1 3.7 4.626086957 None
« Previous Page 152 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —