17 Mar 2026 None None TR1- 60MVA ARMY BARRACK — ABUJA - 0.3 0.3 0.3 0.1 0.2 0.1 0.1 0.2 0 0.1 0.1 0.1 0.1 0 0.1 0.1 0 0.3 0.4 0.4 0.4 0.3 - 0 0.1958333333 None
17 Mar 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 4 4 4 6 6 8 8 8 6 6 6 6 6 6 8 8 8 8 8 8 8 8 8 8 4 6.833333333 None
17 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 1.1 1.1 1.1 1.3 1.3 1.3 1.3 1.2 1.2 1.1 1.1 1 1 1.175 None
17 Mar 2026 None None TR2-30MVA Al-Hassin Company — ABUJA - LSD LSD LSD LSD 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 - 0.05 0.03958333333 None
17 Mar 2026 None None TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA - LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 6.6 6.8 6.6 LSD LSD LSD LSD LSD LSD LSD LSD LSD - 6.1 1.0875 None
17 Mar 2026 None None TRI- 60MVA BIRIGIFDR — ABUJA - 2.1 2.1 2.1 2.2 2.2 2.3 2.3 O/C O/C O/C O/C MTD MTD MTD 2.1 LSG/S LSG/S LSG/S LSG/S LSG/S 2.9 2.8 - 2.1 1.066666667 None
17 Mar 2026 None None TR4-60MVA BUNZA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
17 Mar 2026 None None TR 3 60MVA CCNN — KADUNA - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
17 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.4 0.4 0.4 0.2 0.1 0.1 1.2 1.4 1.2 0.9 0.9 0.9 1.2 1.4 1.6 1.4 1.4 1.4 1.5 0.6 0.6 0.3 0.1 0.1 0.1 0.8208333333 None
17 Mar 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 #DIV/0! None
17 Mar 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 8.9 8.9 8.8 0.1 0.1 0.1 0.1 0.1 0.1 0.1 10.6 9.8 9 8.5 0.1 2.758333333 None
17 Mar 2026 None None TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA - 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.4 0.6 0.6 0.6 0.7 0.6 0.6 0.6 E/F E/F E/F E/F E/F E/F - 0.4 0.3583333333 None
17 Mar 2026 None None TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA - NCL/A NCL/A NCL/A NCL/A NCL/A 0.5 0.9 1.1 1.2 0.8 1.2 0.9 E/F 1.4 EF/OC 1.4 1.1 1.1 1 0.8 0.8 0.8 - 0.5 0.6541666667 None
17 Mar 2026 None None TR6-100MVA FADAMA 2 — KADUNA - 15.8 11.6 6.1 4.5 5.4 0.2 1.9 2 2 2.3 2.4 8.1 3.1 7.7 13.6 18.8 11.2 0.2 5.5 5.5 11.7 1.5 - 0.2 6.433333333 None
17 Mar 2026 None None TR6-100MVA FADAMA1 — KADUNA - 6.3 0.5 0.5 4.5 1.7 4.9 0.5 0.5 0.6 0.6 0.7 0.7 0.8 9.7 9.5 6.7 7 5.8 8.6 8.3 0.6 0.5 - 0.5 3.783333333 None
17 Mar 2026 None None TR 3 60MVA FARFARU — KADUNA - 5.5 5.3 5.5 6.2 5.6 5.6 5.4 6 0.2 0.2 4.1 0.2 0.2 0.2 5.3 5.2 5.3 5 5 4.9 4.9 4.5 - 0.2 4.258333333 None
17 Mar 2026 None None TR1- 30MVA FDR1 — KADUNA TEGINA 3.3 3.2 3.3 3.2 1.7 0.7 0.3 0.4 0.4 0.4 3.3 0.8 1.7 2.2 1.4 1.2 1.2 1.2 0.6 0.6 NCL/A NCL/A - 0.3 1.441666667 None
17 Mar 2026 None None TR1- 30MVA FDR2 — ABUJA - 2.9 3.2 3.1 3.1 2.9 3.1 E/F 2.1 NCL/A L/SG L/SG 2.6 1.3 1.3 1.4 1.4 3.2 NCL/A NCL/A 2.2 2.2 2.5 - 1.3 1.829166667 None
17 Mar 2026 None None TR1- 30MVA FDR3 — ABUJA - 1.6 EF EF EF EF 1.6 2.1 2 2.6 2.6 2.5 NCL/A 2.3 2 1.8 2 1.5 3 2.7 NCL/A 2.3 2.5 - 1.5 1.525 None
17 Mar 2026 None None TR1- 40MVA FEEDER 1 — IBADAN KAINJI 132KV 9.36 11.65 12.44 10.1 9.27 10.03 10.64 1.43 10.25 6.84 6.59 7.87 7.44 5.88 11.17 8.37 8.82 5.32 6.49 9.68 11.53 10.73 - 1.43 8.805 None
17 Mar 2026 None None TR2- 40MVA FEEDER 6 — IBADAN - 4.56 4.46 5.12 5.01 5.11 LSD LSD LSD LSD 3.53 4.65 6.13 6.34 6.39 6.7 7.28 7.08 LSD LSD LSD LSD LSD - 3.53 3.408333333 None
17 Mar 2026 None None TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA - 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.6 0.8 0.7 0.7 0.7 0.4 0.3 0.3 0.3 0.1 0.2 - 0.1 0.3125 None
17 Mar 2026 None None TR4-60MVA GAYA — KADUNA - 4.6 4 4.1 5.6 5 4.7 4.8 2.6 2.8 2.8 2.8 4.3 4.4 4.6 4.5 2.2 3 2.6 2.5 2.4 1.7 1.6 - 1.5 3.5125 None
17 Mar 2026 None None TR2-30MVA GRA 11kv fdr — ABUJA - LSD LSD LSD LSD 7.6 LSD LSD LSD 6.6 6.9 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 6.6 0.8791666667 None
17 Mar 2026 None None TR4-60MVA GWANDU — KADUNA - 1.6 1.5 1.6 1.8 5 0.1 0.1 0.1 0.1 0.1 0.3 0.3 0.3 0.4 0.4 0.3 0.3 O/C O/C O/C O/C O/C - 0.1 0.6708333333 None
17 Mar 2026 None None TR1- 40MVA HYDROPOLIS 1 — IBADAN - 5.9 5.92 5.98 5.91 5.86 5.81 5.87 5.78 5.86 5.81 5.81 5.8 5.87 5.88 5.93 8.32 5.88 5.8 5.78 6.02 5.94 5.98 - 5.1 5.949166667 None
17 Mar 2026 None None TR2- 40MVA HYDROPOLIS 2 — BILATERAL - 0.06 0.06 0.06 0.06 0.07 0.07 0.07 0.09 0.09 0.08 0.08 0.09 0.08 0.08 0.09 0.07 0.08 0.08 0.07 0.07 0.07 0.07 - 0.06 0.07375 None
17 Mar 2026 None None TR1- 30MVA J/Bachita — IBADAN - 5.95 9.05 6.65 7 6.2 9.2 9.55 9.95 9.25 9.4 9.4 6.85 8.75 9.3 6.95 7.75 7.05 7.35 4.4 6.85 7.1 8.95 - 4.4 7.841666667 None
17 Mar 2026 None None TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
17 Mar 2026 None None TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA - LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LS/GS LS/GS LS/GS LS/GS LS/GS LS/GS LS/GS LSG/S LSG/S LSG/S 7.2 LSG/S LSG/S LSG/S LSG/S LSG/S - 7.2 0.3 None
17 Mar 2026 None None TR2-40MVA KOKO — KADUNA - DS DS DS DS DS DS 3.3 2.6 DS DS DS DS DS DS DS 0.1 DS DS DS DS DS DS - 0.1 0.25 None
17 Mar 2026 None None TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA SHIRORO2 NCL/A NCL/A NCL/A NCL/A NCL/A 2.2 3.1 5.6 3.1 2.1 5.1 2.6 E/F 5.1 EF/OC EF/OC 3.7 EF/OC EF/OC EF/OC EF/OC EF/OC - 2.1 1.358333333 None
17 Mar 2026 None None TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA - L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG 5 4.7 O/C O/C O/C - 4.7 0.4041666667 None
17 Mar 2026 None None TR 3 60MVA KWARE — KADUNA - 3.2 2.9 NCL/A NCL/A NCL/A 0.9 1 1.2 1.2 1.4 2.6 3.3 1.1 1.2 1.2 1.2 1.2 1 1.1 1.2 1.1 1.1 - 0.9 1.395833333 None
17 Mar 2026 None None TR5-60MVA LABANA — KADUNA - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 None
17 Mar 2026 None None TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA - E/F E/F E/F E/F E/F E/F E/F E/F MTD MTD MTD MTD 3.2 3.5 3.5 2.7 LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S - 2.7 0.5375 None
17 Mar 2026 None None TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA - L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG 4 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 6.4 6.4 L/SG - 4 0.7 None
17 Mar 2026 None None TR1- 30MVA Life Camp — IBADAN - 0.6 0.6 0.65 0.7 0.65 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.65 0.65 0.7 0.75 0.75 0.8 0.8 0.75 0.75 0.7 - 0.55 0.6520833333 None
17 Mar 2026 None None TR2- 30MVA M/KUNKEL0DR — ABUJA - 3.5 3.5 4.5 5.5 2.1 3 3.1 2.8 3.2 5.8 4.6 4.6 4.4 LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S LSG/S 2.8 LSG/S - 2.1 2.370833333 None
17 Mar 2026 None None TR1- 60MVA MASUGA FDR — ABUJA - 0.01 0.01 0 0.01 0.01 0.03 0.04 0.05 0.09 0.07 0.04 0.07 0.08 0.06 0.18 0.22 0.22 0.2 0.13 0.14 0.14 0.13 - 0 0.08625 None
17 Mar 2026 None None TR1- 30MVA Mokwa — IBADAN JEBBA 3.6 3.6 3.95 3.5 3.65 3.55 3.75 4.1 4.45 4.15 4.15 3.95 4 4.35 3.6 0.65 4 4.15 7.1 4.55 4 4.6 - 0.65 3.99375 None
17 Mar 2026 None None TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA - E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F - 0 0 None
17 Mar 2026 None None TR 3 60MVA NEW INJECTION — KADUNA SOKOTO 3.8 4.3 4.5 4.8 4.6 4.7 5.1 5.7 5.9 1.6 1.6 0.7 1.6 1.6 6.6 6.8 6.1 5.6 1.3 1.4 1.3 1.3 - 0.7 3.658333333 None
17 Mar 2026 None None TR1-40MVA NGASKI — KADUNA YAURI DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS 2.8 2.8 2.8 2.7 DS - 2.7 0.4625 None
17 Mar 2026 None None TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA MINNA TS 3.9 4.2 3.2 3.5 3.5 4 4 3 3.6 4.9 5.3 3.7 4.9 LSG/S LSG/S 3.1 3.7 4.1 4.5 3.1 LSG/S 2.5 - 2.5 3.133333333 None
17 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 2.5 2.5 2.5 2.7 2.7 2.7 2 1.8 1.9 1.5 1.5 0.5 2.3 2.5 2.7 2.8 2.5 2.6 2.7 1.4 1.5 1.6 1.7 1.7 0.5 2.7 None
17 Mar 2026 None None TR7- 60MVA P/ HOUSE — ABUJA - 1.2 1.2 1.2 1.2 4.1 4.3 4.8 5 7.6 7.4 7.5 2.5 2.5 2.4 7.8 2.1 1.6 6.3 6.1 8.1 8 8.2 - 1.2 4.695833333 None
17 Mar 2026 None None TR1- 40/30MVA P/STATN — KADUNA - 7.2 6.9 6.9 7.1 6.9 9.9 10.2 8 7.9 10.1 10.5 8.4 13.8 14.5 3.4 3.3 3.2 3 6 10 14.8 13.3 - 3 8.5625 None
17 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
17 Mar 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.1 0.2 0.2 0.2 0.1 0.2 0.2 0.3 0.2 0.2 0.2 0.1 0.2 0.3 0.3 0.3 0.4 0.1 0.1 0.2 0.3 0.3 0.3 0.1 0.1 0.2125 None
17 Mar 2026 None None TR6-100MVA TAMBUWAL — KADUNA - 1.8 1.7 1.7 1.7 1.7 1.9 2 INST. E/F INST. E/F 0.4 0.5 0.5 0.5 0.5 0.3 2.7 3 2.6 1.9 2 2.3 2.1 - 0.3 1.479166667 None
17 Mar 2026 None None TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA KONTAGORA 5.2 6 6.1 4.6 4.5 4.7 2.3 2.7 2.7 2.6 2.6 2.5 4.8 5.1 5.3 5.3 5.5 5.9 2.8 2.8 5.9 5 - 2.3 4.383333333 None
17 Mar 2026 None None TR 3 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL KADUNA - 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.2 6.8 6.6 0.4 0.3 0.4 5 4.9 6.3 6.6 0.3 0.3 0.3 - 0.2 1.7375 None
17 Mar 2026 None None TR5-60MVA Town 11KV fdr — ABUJA - LSD LSD LSD LSD LSD 6.5 6.6 6.2 LSD LSD LSD LSD LSD EMR 6 6 5.6 LSD LSD LSD LSD LSD - 5.6 1.5375 None
17 Mar 2026 None None TR5-60MVA UNIVERSITY — KADUNA - 0.2 0.2 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.3 0.3 0.35 0.3 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.4 - 0.2 0.25625 None
17 Mar 2026 None None TR1- 60MVA WATER WORKS 132KV KONTAGORA TS_33KV WATERWORKS FDR_PL_PL ABUJA - 0.1 0.4 0.4 0.2 0.4 0.4 0.4 0.3 0.4 0.4 0.4 0.4 0.5 0.5 0.4 0.5 0.4 0.5 0.4 0.5 0.4 0.5 - 0.1 0.4 None
17 Mar 2026 None None TR 3 60MVA YABO — KADUNA - 0.4 0.2 0.2 0.2 0.2 0.2 0.2 0.2 4.5 4.6 0.2 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.2 - 0.1 0.5416666667 None
17 Mar 2026 None None TR1-40MVA YAURI — KADUNA - 4.2 6.3 6.2 3.2 3 0.5 0.7 0.7 DS DS DS DS 3.2 4 4 5 5.2 0.6 0.6 0.7 0.6 0.7 - 0.5 2.2625 None
17 Mar 2026 None None TR7- 60MVA ZARUMAI FDR 132KV MINNA TS_33KV ZARUMAI FDR_PL_PL ABUJA - 4.4 4.1 4.3 4.3 4.1 6.3 6.5 3.2 3.4 EMR 3.4 3.7 4 3.6 3.7 3.9 3.8 3.5 3.6 3.6 LSG/S LSG/S - 3.2 3.55 None
17 Mar 2026 None None TR1-40MVA ZURU — KADUNA - DS DS DS DS DS DS DS DS 3.2 6.9 6.3 6.6 3 DS DS DS DS DS DS DS DS 5.4 - 2.9 1.429166667 None
16 Mar 2026 None MINNA TS TR4- 15MVA 11KV CHANCHAGA FDR — ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 7 6.9 EMR D LSD 7.5 7.5 5.5 6 5.5 - 5.5 1.9125 None
16 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.5 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5 4.67 4.17 4.17 4.585 None
16 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC 1.75 1.67 1.67 1.67 2.17 2.17 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 1.67 1.85 None
16 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5 5 4.67 O/C 4.67 4.67 4.67 3.67 LS/D LS/D LS/D 3.67 4.621428571 None
16 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D I/S I/S I/S O/C I/S I/S I/S I/S LS/D LS/D LS/D 0 #DIV/0! None
16 Mar 2026 None MINNA TS TR3- 15MVA 11KV PARLFDR — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5.5 0.2291666667 None
16 Mar 2026 None MINNA TS TR4- 15MVA 11KV SHIROROFDR — ABUJA 1.8 1.8 2 2 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 1.8 0.3166666667 None
16 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D 0.6 0.5 0.5 0.52 0.68 0.67 0.7 LS/D LS/D 0.67 0.5 0.5 0.52 0.5 0.5 0.52 0.52 0.48 0.48 0.555 None
16 Mar 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 1.5 1.4 1.4 1.4 1.4 1.5 1.6 1.86 2.1 2.1 2.1 2.2 2.2 2.2 1.4 1.4 2.4 2 1.9 1.9 1.8 1.7 1.7 1.6 1.4 1.781666667 None
16 Mar 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 4.5 5.35 1.2 1.8 5.25 5.35 2 1.75 3.55 5 4.7 0.25 I/S I/S I/S 4.35 0.1 0.25 5 0.1 1.4 1 2.5 3 0.1 2.780952381 None
16 Mar 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 2.5 2 2.1 2 2.5 2.3 2.1 0.6 0.5 2.7 2.5 2.6 2.7 2.8 2.1 2.4 2.2 1.5 2.7 2.4 3.9 4 2.5 1.9 0.5 2.3125 None
16 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 3.5 3.7 3.3 3.4 3.5 3.4 3.4 3.4 3.3 3.3 3.4 3.4 3.3 3.4 2.9 3.3 3.5 3.4 3.5 3.6 3.2 3.4 3.3 3.5 2.9 3.3875 None
16 Mar 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 18.1 26.5 25.8 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 18.1 23.46666667 None
16 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.75 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.7 0.8 0.6 0.6 0.6 0.8 0.7 0.7 0.8 0.9 0.8 0.8 0.9 0.8 0.7 0.7 0.6 0.7520833333 None
16 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC LS/G LS/G 14.1 13.6 LS/G LS/G 13.6 12.1 10.7 9.6 9.3 LS/D LS/D LS/D 10.6 8.8 E/F E/F E/F 15.1 17.25 14.2 LS/D 15.2 8.8 12.62692308 None
16 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC 12.65 15.5 LS/G LS/G 12.9 12.8 11.4 9.9 10.1 9.6 9.6 LS/D LS/D LS/D 11.5 13.9 18.4 16 16.9 LS/G LS/G LS/G 19.7 18.5 9.6 13.709375 None
16 Mar 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 I/S I/S I/S I/S I/S I/S I/S 0.4 0.4 None
16 Mar 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 8.6 8.1 7.8 10.9 14.5 14.3 5.6 10.5 11.9 9.1 9.8 5.6 L/SD L/SD L/SD L/SD L/SD LS/D L/SD L/SD L/SD LS/D 8.9 8.8 5.6 9.6 None
16 Mar 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 8.5 9.4 9.9 10.1 10 10.2 10.2 10 9.8 9.3 8.8 LS/D LS/D 8.5 9.654545455 None
16 Mar 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC 1.4 1.4 1.4 1.5 1.6 1.6 1.6 3.4 3.4 3.4 3.3 3.3 3.3 3.6 4.3 4.6 5.2 5.1 INST O/C&E/F 4.7 4.6 1.7 1.6 1.6 1.4 2.939130435 None
16 Mar 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Mar 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 17.4 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 15.9 12.5 11.8 13.6 13.7 10.6 I/S 10.8 10.9 17.3 15 20.7 14.2 17.6 10.6 14.42857143 None
16 Mar 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 4.6 5.39 3.18 3.08 6.39 4.52 5.56 5.85 8.93 10.6 11.84 13 12.08 11.95 12.23 13.2 21.9 7.54 6.65 5.05 5.94 5.12 5.43 4.57 3.08 8.108333333 None
16 Mar 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 4 4 3.8 3.9 4 4.1 3.7 3.8 4.4 4.8 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 4.5 4.7 5 5.1 5.4 4.8 4.6 4.3 3.7 4.383333333 None
16 Mar 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 11 12.42 7.43 11.61 10.22 10.16 12.22 11.82 13.82 17 17 20.22 18.78 15.64 17.46 21.4 16.62 16.9 14.51 12.04 14.45 12.3 12.88 8.84 7.43 14.03083333 None
16 Mar 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 2.63 2.99 1.83 2.87 2.52 2.57 3.64 4.28 6.38 8 8.89 9.85 9.32 10.14 9.8 10.7 7.61 7.13 5.73 3.9 4.32 3.4 3.37 3.04 1.83 5.62125 None
16 Mar 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 5.56 6.48 4.12 6.45 5.81 4.7 7.65 10.57 15.56 16.6 17.52 20.03 11.41 17.24 18.6 20.1 15.83 14.24 11.5 6.93 10.05 5.79 6.51 6.34 4.12 11.06625 None
16 Mar 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 9.27 10.45 6.61 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 6.37 17.07 18.09 14.5 11.62 13.66 12.11 10.82 14.04 6.37 12.05083333 None
16 Mar 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Mar 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 16.41 18.09 13.21 21.48 18.83 18.1 20.16 16.7 18.91 18.9 20.67 21.2 20.15 21.88 18.4 21.9 19.97 19.55 19.35 17.17 19.82 16.81 17.79 15.56 13.21 18.79208333 None
16 Mar 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Mar 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 12.7 11.9 11.4 11.3 11.7 12.3 11.7 10.1 9.5 9.3 7.5 7.5 7.6 8.1 8.2 8.4 6.1 9.4 8.2 14 13.8 13.7 LS/G 7 6.1 10.06086957 None
16 Mar 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 18 16.7 15.7 15.8 16 15.5 15 14.4 15 10.9 11.2 11.3 13.9 LS/G LS/G 14.1 14.5 13.9 14.8 14.6 8.3 10 14.8 20 8.3 14.29090909 None
16 Mar 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Mar 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
16 Mar 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S 1/S I/S I/S 0.3 0.3 0.26 0.27 0.26 0.27 0.48 I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.26 0.3057142857 None
16 Mar 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 0.76 0.7 0.7 0.65 0.6 0.66 0.6 0.5 0.5 0.5 E E 0.8 0.97 1.09 1.27 1.34 1.46 1.5 1.81 1.85 1.95 1.9 1.8 0.5 1.086818182 None
16 Mar 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC LS/G L/S G 9.4 9.2 9.2 9.85 11.3 13.35 16 15.5 15.95 LS/D LS/D LS/D LS/D 16 8.25 6.4 12.2 11.55 11.2 10.8 10.3 9.9 6.4 11.46388889 None
16 Mar 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 6.35 5.8 5.7 5.75 5.7 6 6.9 9.2 LS/D LS/D LS/D 12.9 13.25 13.25 13.25 11.8 11.3 8.7 SWS 7.6 7.75 7.2 6.8 6.25 5.7 8.5725 None
16 Mar 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC L/S G L/S G L/S G 6.7 6.1 6.2 5.8 5.1 5.15 5.1 5 LS/D LS/D LS/D LS/D INST EF INST EF INST EF INST EF 7.1 7.5 7.2 7 6.5 5 6.188461538 None
« Previous Page 142 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —