Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
21 Mar 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC 17.6 16.6 LS/D LS/D LS/D LS/D 20.4 18.3 17.1 19.4 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 22.2 16.4 LS/D LS/D 6 6 17.11111111 None
21 Mar 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D 11.6 12.2 12.3 11.6 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D INST.E/F O/C O/C O/C 12.4 LS/D 11.6 12.02 None
21 Mar 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 14.6 14 13.6 13.2 12.1 12 11.8 11.7 12 12.2 12.5 LS/D LS/D INST O/C INST O/C INST O/C INST E/F INST E/F INST E/F I/S 1.5 11.3 10.4 INST E/F&OC 1.5 11.63571429 None
21 Mar 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 11.7 11.2 10.7 10.4 10.4 10.9 11.4 15 12.6 12.3 13.3 LS/D LS/D LS/D 11.4 E/F E/F E/F E/F E/F E/F E/F E/F E/F 10.4 11.775 None
21 Mar 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 18.5 16.1 15 14.6 14 14.3 14.7 15 LS/D LS/D LS/D 10.8 INST E/F INST E/F INST E/F 17.6 15.8 17.3 17.8 O/C O/C O/C O/C 12.2 10.8 15.26428571 None
21 Mar 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 11.4 10.8 10.4 10 10.1 11 13 E/F E/F E/F E/F E/F E/F E/F E/F 10.8 I/S I/S I/S I/S I/S I/S I/S I/S 10 10.9375 None
21 Mar 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 5.1 4.8 4.7 4.4 4.3 4.2 3.9 4 4.4 4.3 1.9 4.8 5 5.2 5 4.9 4.8 5 5.5 5.4 5.4 5.6 5.4 5.2 1.9 4.716666667 None
21 Mar 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
21 Mar 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 12.1 11.6 11 10 9.9 9.9 9.6 9.7 10.1 10.8 11.3 12.1 12.3 12.9 13.2 13 12.9 4.6 13.2 13.6 14.1 14.1 13.6 13.2 4.6 11.61666667 None
21 Mar 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 2.8 2.7 11.3 10.8 10.7 LS/D LS/D 6 6.3 LS/D LS/D 2.7 19.6 19.5 2 E E 6.9 16.3 15.8 18.8 18 17.3 16.2 2 11.31666667 None
21 Mar 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 3.5 3.5 3.45 3.4 3.4 3.4 3.2 4 4 3.2 1.6 1.9 2.1 1.9 2.4 3.3 3.2 3 4.1 4.1 4 4.1 3.5 3.8 1.6 3.252083333 None
21 Mar 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5 5.1 4.8 4.7 4.5 4.6 4 3.5 3.6 4.5 4.3 4 3.8 3.5 3.5 4.278571429 None
21 Mar 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 11.2 10.8 10 9.7 9 9.1 8.8 9.5 10 10.2 10 10.2 6.2 11.3 11.5 11 14.2 14.7 12.1 12.5 13 13.1 12.3 12.1 6.2 10.9375 None
21 Mar 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP E/F 0 #DIV/0! None
21 Mar 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 1.8 1.9 1.7 1.6 1.7 1.6 1.3 1.3 1.6 0.1 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.05 0.05 0.05 0.05 0.1 0.05 0.05 0.64375 None
21 Mar 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.8 5 5 7.4 7.65 1.5 1.35 1.35 6.7 7.75 2.1 2.1 2.1 2 1.85 0.1 2.35625 None
21 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 4.5 4.3 4.1 3.8 3.8 4.1 4.3 4.3 E/F E/F E/F 5.2 4.9 5 5 4.9 5 5.1 5.2 E/F E/F E/F E/F E/F 3.8 4.59375 None
21 Mar 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 10 9.4 9 8.3 INST.E/F INST. E/F 9.05 8.5 8.3 8.3 LS/G LS/G 10.5 CB/F 10.5 INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C INST. O/C 14 13.1 11.9 8.3 10.06538462 None
21 Mar 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 3.5 3.5 3.5 3.1 3.1 3.4 None
21 Mar 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 0.9 0.75 0.85 0.9 1 0.9 0.8 0.8 0.9 0.7 0.7 0.7 0.65 0.65 0.7 0.7 0.65 0.7 0.65 0.5 0.45 0.05 0.55 0.5 0.05 0.69375 None
21 Mar 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 4 6.5 5.8 6.4 5 E/F E/F E/F E/F E/F E/F E/F E/F 4 5.54 None
21 Mar 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 16 15 14 14 13.2 13.3 13.39 13.5 13.5 13.5 13.6 13.9 LS/G 15.4 15.4 E/F E/F E/F E/F 19.8 18.9 LS/G LS/G LS/G 13.2 14.774375 None
21 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 5.3 5.3 5 4.8 4.8 4.6 4.3 4.2 4.3 4.5 4.6 4.8 5 4.7 5 5 4.8 19.3 20.4 INST O/C INST O/C BC BC 6.7 4.2 6.37 None
21 Mar 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC LS/G LS/G LS/G 5.75 6 6.1 5 4.25 5.05 5.5 6.5 6 LS/G LS/G 2.5 2.5 3.3 3.2 I/S I/S I/S I/S 3.05 5.25 2.5 4.663333333 None
21 Mar 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC LS/G LS/G LS/G 6.45 9.65 9 8.15 9 LS/D LS/D LS/D LS/D LS/D LS/G 5 5 5.25 LS/D 6.1 9.75 9.65 9.6 8.05 7.4 5 7.717857143 None
21 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 2.7 2.7 7.8 7.5 7.4 5.5 6.3 2.7 3 3 8.4 5.9 6 5 2.9 2.8 3 3 2.9 2.6 5 LS/D LS/D LS/D 2.6 4.576190476 None
21 Mar 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 13.4 12.7 11.85 L/SD L/SD L/SD 17.5 17.6 17 17.4 17.6 18.2 LS/G LS/G LS/G 5.7 17 11.4 15.85 12.85 13.3 9.6 LS/D LS/D 5.7 14.309375 None
21 Mar 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 2.4 2.2 2.2 L/S L/S L/S L/S I/S I/S I/S I/S I/S I/S I/S I/S 2.6 2.7 2.7 2.7 2.4 I/S I/S I/S I/S 2.2 2.4875 None
21 Mar 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 13 12 11.2 10.4 9 8.7 L/S LS/G LS/G LS/G 10.3 11 11.6 11.3 11.3 11.2 11.4 11.9 12.8 13.5 13.7 13.2 LS/G LS/G 8.7 11.52777778 None
21 Mar 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 #DIV/0! None
21 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.9 0.9 0.9 0.8 0.8 1 0.9 1 1.1 1.2 1.2 1.1 1.3 1.4 1.3 1 1.1 1.1 1.3 1.3 1.3 1.1 1 1 0.8 1.083333333 None
21 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 2.5 2.3 2.2 2.1 2.2 2.2 2.4 2.4 2.5 2.5 2.6 2.6 2.6 2.6 2.5 2.8 2.8 2.7 3 3.3 3.3 2.9 2.7 2.4 2.1 2.5875 None
21 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.4 0.6 0.5 0.4 0.5 0.5 0.5 6.7 7.3 10 0.5 0.6 0.6 0.6 0.6 0.5 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.4 1.4625 None
21 Mar 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 10.05 9.5 9 L/SD L/SD L/SD 14.8 14.9 14.5 14.1 14.3 L/SD L/SD 12.7 15.1 14.9 15.1 15.1 8.3 11.9 LS/D LS/D 7.6 11.85 7.6 12.57058824 None
21 Mar 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 4 3.8 3.9 4.5 4.8 4.3 5.5 5.2 0.9 0.8 0.8 0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.9 0.9 4.7 5.2 4.5 3.4 0.8 2.666666667 None
21 Mar 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC 0.4 0.4 0.4 0.4 0.4 4 E/F E/F 4 4.2 4.3 0.6 6.3 6.5 0.5 0.5 0.5 E/F E/F 0.5 0.5 1.5 E/F E/F 0.4 1.994444444 None
21 Mar 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC 7.8 7.7 7.5 7.6 7.8 8 10.2 9.4 9.6 9.5 9.6 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 7.5 8.609090909 None
21 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 2.8 2.8 2.7 2.8 2.7 2.8 1.3 2 3 3.2 3.3 3.2 2.9 3.3 3.3 3.5 3.1 2.8 2.8 2.8 2.6 3 2.9 3 1.3 2.858333333 None
21 Mar 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC LS/G LS/G 7.15 6.5 INST.EF 5.25 9.15 9.5 14.05 11.1 9.2 8.05 5.65 LS/G 6 6.25 I/S I/S I/S I/S I/S 9.7 7 7.8 5.25 8.156666667 None
21 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 6 5.7 5.4 5.1 5.2 5.5 6.5 6 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 12 11.4 10.5 0.1 3.358333333 None
21 Mar 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2.5 2.7 2.5 2.6 2.5 2.6 3 3.5 3.4 3.1 3.2 3.1 3 2.8 3.1 L/S L/S L/S L/S 2.7 2.5 2.3 2.4 2.3 2.3 2.79 None
21 Mar 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 21 20 19 18 18 18 16.98 17.32 20.12 22.2 23.7 24.9 26.1 INST. O/C INST. O/C SG SG 26.9 27.4 26.7 25 24 23.3 21.7 16.98 22.016 None
21 Mar 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 0.7 0.7 0.7 0.7 0.8 0.99 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.6 0.97 0.84 0.76 0.1 0.3816666667 None
21 Mar 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG 1.8 1.8 1.2 1.4 L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG 1.5 1.2 E/F - 1.2 0.3708333333 None
21 Mar 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL LSD LSD LSD LSD LSD LSD LSD 1.02 1.05 1.08 0.93 LSD LSD LSD LSD LSD LSD LSD 1.2 1.2 1.38 EMR T EMR T - 0.93 0.3275 None
21 Mar 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO TAMBUWAL FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
21 Mar 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC 0.5 0.1 0.1 0.1 0.1 0.5 0.5 0.1 0.1 0.1 0.1 0.4 0.1 1.89 0.27 2.71 5.15 0.59 0.57 6.05 6.19 0.59 0.4 0.5 0.1 1.154583333 None
21 Mar 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA 6.6 7 NCL/A NCL/A NCL/A NCL/A NCL/A 8.3 10 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 7 6.2 6.6 9.7 - 6.2 2.558333333 None
21 Mar 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.3 0.3 0.3 0.3 0.2 0.1 0.1 0.1 0 0.1 0 0.1 0 0.1 0.1 0 0.1 0.1 0.2 0.3 0.4 0.4 0.3 - 0 0.175 None
21 Mar 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 4 4 4 4 4 4 4 4 4 5 5 5 5 6 6 6 6 4 4 8 8 8 4 4 4 5 None
21 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC 1 1 1 1 1 1 1.1 1 1.1 1.3 1.4 L/S L/S L/S L/S L/S L/S L/S L/S 1.2 1.2 1.1 1 1 1 1.0875 None
21 Mar 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 - 0.02 0.02 None
21 Mar 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C - 0 0 None
21 Mar 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA 2.1 2 2 1.9 2.2 2.2 2.3 O/C O/C O/C O/C O/C O/C O/C O/C 2.2 2.2 2.2 2.6 3 3 3.1 2.6 - 1.9 1.591666667 None
21 Mar 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
21 Mar 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0.01666666667 None
21 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.8 1 0.8 1.1 1.7 1.7 0.5 1 1.5 1.4 2.2 0.4 0.8 0.8 0.1 0.1 0.4 0.1 0.7166666667 None
21 Mar 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 #DIV/0! None
21 Mar 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 8.4 8.2 8 8 8.8 9.5 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 11.08 L/S L/S L/S 0.1 3.018095238 None
21 Mar 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 3.1 L/SG 0.5 0.5 5.1 5.4 6 5.8 0.5 0.5 0.5 0.5 3.7 4 3.4 0.5 0.5 L/SG L/SG 0.6 0.6 0.6 0.6 - 0.5 1.8125 None
21 Mar 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.4 0.4 0.4 0.4 0.6 0.7 O/C O/C 0.8 0.8 0.9 0.7 0.7 0.6 0.6 0.7 0.7 0.8 0.7 0.7 0.6 0.5 - 0.4 0.5666666667 None
21 Mar 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 15.4 11 14 9.4 11 11.6 0.2 0.2 2 2 6 0.18 15 16 12 7 7 7 1.7 1.7 1.6 7.8 15.5 - 0.18 7.778333333 None
21 Mar 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 4.2 4.2 4 4 6.3 6.4 7.4 7.4 0.49 0.54 0.56 8 8 8 7.4 6 6 6 0.6 0.6 7.7 7.7 7.4 - 0.49 5.249583333 None
21 Mar 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 5 5 5 5 5 5.5 6.1 5.9 6.2 6 6.7 5 4.8 4.8 4.8 4.4 4.3 0.1 4.3 4.9 4.9 0.2 1.9 - 0.1 4.7 None
21 Mar 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 2.5 2.6 2.7 2.6 2.8 3 1.1 0.4 0.4 0.4 3.2 3.1 1.2 1.1 0.8 0.9 0.9 0.9 0.4 0.4 3.1 3.7 3.2 - 0.4 1.725 None
21 Mar 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 1 0.9 0.9 0.9 0.8 0.8 1.1 1.1 1.1 1.1 2.3 2.2 EF 1 0.9 0.9 1 1 1.1 1.1 1.9 2 2.1 - 0.8 1.208333333 None
21 Mar 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 1.6 1.7 1.6 1.6 1.7 1.6 1.7 1.6 1.6 1.6 1.4 1.4 1.5 1.5 1.4 1.9 1.7 2 2.4 2.4 2.5 2.2 2.3 - 1.4 1.7875 None
21 Mar 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 8.85 8.46 8.24 8.11 8.13 8.99 10.67 8.81 9.13 9.27 9.24 8.98 6.73 6.73 0.51 5.89 5.89 5.6 3.56 10.91 5.27 EMR T EMR T - 0.51 6.582083333 None
21 Mar 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 2.51 3.02 3.02 3.26 3.51 3.76 4 LSD LSD LSD LSD LSD 2.75 3.75 2.65 OC/EF 4.35 4.35 LSD LSD LSD EMR T EMR T - 2.51 1.705416667 None
21 Mar 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 - 0.2 0.2 None
21 Mar 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 0 4.5 4.3 4.2 4.2 5 5.5 5.5 5 5 E/F E/F E/F 4 4 NCL/A NCL/A NCL/A NCL/A 1.7 4.6 4.5 0 - 0 2.733333333 None
21 Mar 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA 5.8 5.6 5.5 5.5 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD MTD MTD MTD MTD MTD - 5.5 1.195833333 None
21 Mar 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 0.8 1.7 1.6 1.6 1.7 2 2.7 0.3 0.28 0.3 E/F E/F E/F 0.15 0.14 0.15 0.15 0.14 0.1 0.2 0.2 0.3 0.3 - 0.1 0.69625 None
21 Mar 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 5.96 6 6.02 5.95 5.87 5.85 5.87 5.91 5.95 5.91 5.89 5.88 5.93 5.92 5.8 5.84 5.89 5.84 5.78 5.84 5.89 EMR T EMR T - 5.78 5.157916667 None
21 Mar 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.07 0.07 0.07 0.08 0.08 0.07 0.06 0.07 0.07 0.07 EMR T EMR T - 0.06 0.05708333333 None
21 Mar 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 7.15 5.95 6.45 5.65 3.5 3.75 1 3.35 5.7 1.25 8.25 8.4 8 3.9 4 1.25 4.15 5.6 O/C & E/F 4.25 8 3.85 7 - 1 4.891666667 None
21 Mar 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
21 Mar 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA DS DS DS DS DS DS DS O/C 6.6 6.5 O/C DS DS 5.5 5.3 5 LSD LSD LSD LSD LSD LSD LSD - 5 1.204166667 None
21 Mar 2026 None YAURI TR2-40MVA KOKO — KADUNA DS DS DS DS DS DS DS 3.5 DS 2.2 3.5 DS DS 0.1 0.1 0.1 DS DS DS 3.5 DS DS DS - 0.1 0.5416666667 None
21 Mar 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 5.5 O/C O/C O/C O/C O/C O/C O/C O/C O/C - 5.5 0.2291666667 None
21 Mar 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG 4 4.2 2.9 2.8 L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG - 2.8 0.5791666667 None
21 Mar 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 3.1 3.1 3.1 3.1 3 3.2 E/F 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 - 0.4 1.191666667 None
21 Mar 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0 0 0 0 0 0 0 0 0.037 0.032 0.03 0.037 0.034 0.035 0.04 0.036 0.04 0.04 0 0 0 0 0 - 0 0.01504166667 None
21 Mar 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA 0.4 0.3 0.3 0.3 0.3 0.4 0.4 0.4 3.2 0.5 0.4 0.4 O/C O/C O/C 5.5 7.5 8.1 8.4 LSD LSD LSD LSD - 0.3 1.533333333 None
21 Mar 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA L/SG L/SG L/SG L/SG L/SG L/SG 5.1 NCL/A 4.8 4.4 L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG - 4.4 0.5958333333 None
21 Mar 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.65 0.65 0.55 0.65 0.55 0.55 0.55 0.4 0.7 0.7 0.65 0.55 - 0.4 0.5770833333 None
21 Mar 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 3.7 3.6 3.5 3.3 6.6 6.8 7.4 2.5 6.5 2.3 2.3 2.3 2.5 2.3 LSD LSD LSD LSD LSD 4.8 4.8 2.5 2.6 - 2.3 3.029166667 None
21 Mar 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0.01 0.01 0 0.01 0 0.02 0.01 0.01 0 0.01 0 0.01 0.01 0 O/C O/C O/C O/C 0.01 0.01 0 0.01 0.01 - 0 0.005833333333 None
21 Mar 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 4.55 4.35 4 4.2 4.15 3.45 4.3 0.8 2.5 7.4 8.7 2.8 3.9 3.55 3.95 7.2 3.85 2.55 O/C & E/F 0.35 1.35 1.55 6.05 - 0.35 3.629166667 None
21 Mar 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA 0.1 0.2 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 3 2.9 2.6 2.4 - 0.1 0.475 None
21 Mar 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 4.1 4.1 4.1 4 4.1 4.2 4.6 5.4 5.5 5.5 5.6 6 6.1 6.5 6 1.2 1.1 1.1 1.1 0.8 0.8 0.7 5.4 - 0.7 3.891666667 None
21 Mar 2026 None YAURI TR1-40MVA NGASKI — KADUNA DS DS DS DS DS DS DS 2.4 2.2 2.3 DS DS DS DS DS DS DS DS DS DS DS DS 1.9 - 1.9 0.3666666667 None
21 Mar 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA 1.8 1.7 1.7 1.7 1.7 1.7 1.6 2 2.1 2.3 2.3 2.4 2.5 2.3 2.4 2 2 2.1 2.3 2.4 2.2 2.2 2.2 - 1.6 2.070833333 None
21 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.5 0.4 1.8 1.9 1.9 2 2 3.1 2.7 2.7 2.7 0.3 0.4 0.4 0.4 0.4 0.3 0.3 1.1 None
21 Mar 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 6.6 6.4 6.4 6.4 7.5 9.8 10.6 1.1 6.1 3.9 1.3 1.3 7 6.9 6.5 1.5 1.3 1.2 1.3 1.2 1.3 1.2 1.2 - 1.1 4.133333333 None
21 Mar 2026 None SOKOTO TR1- 40/30MVA P/STATN — KADUNA 7.5 7.8 7.7 8.5 11.6 7.5 7.5 4.6 8.7 13.2 13.3 14.6 14.2 6 6.2 11.9 12.1 11.3 9.6 7.4 13.2 12.5 12.5 - 4.6 9.920833333 None
21 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
21 Mar 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.1 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0.1 0.1 0.2416666667 None
21 Mar 2026 None B/KEBBI TS TR6-100MVA TAMBUWAL — KADUNA 2 1.8 1.8 1.7 1.7 1.7 2 2 E/F E/F 3 3 2.4 0.39 0.37 0.38 0.38 0.37 0.3 1.6 1.7 2 2 - 0.3 1.432916667 None
21 Mar 2026 None KONTAGORA TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA 5.7 5.2 5.1 5.2 5.3 5.8 6.6 NC L/A 7.4 6.1 5.3 5.3 5.3 5 5.1 4.8 4.8 4.7 4.8 4.8 2.8 6.8 6.3 - 2.8 5.166666667 None
« Previous Page 135 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —