Hourly Load Profile (Unified)
Average Hourly Load Analysis
Multi-select enabled
Attribution Analysis Upload Load Report

Average Hourly Load (MW)

Detailed Hourly Readings
Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
23 Mar 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC LS/D 12.9 11.6 11.8 12 10.3 11.1 9.9 LS/D LS/D LS/D 5.1 5.3 5 LS/G LS/G LS/G LS/G - - - - - - 5 9.5 None
23 Mar 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 2 2 2.1 2 2.2 2.2 I/S I/S I/S I/S I/S I/S I/S I/S 1 3 3 2 I/S - - - - - 1 2.15 None
23 Mar 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC LS/G LS/G LS/G LS/G 13.6 12.6 LS/G LS/G 12.3 11.5 10.9 LS/G LS/G LS/G 10.6 1.2 12.1 12.2 - - - - - - 1.2 10.77777778 None
23 Mar 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 #DIV/0! None
23 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.9 0.9 0.8 0.8 0.8 0.9 1 1.1 1.1 1.3 1.5 1.4 1.5 1.3 1.4 1.5 1.3 1.4 - - - - - - 0.8 1.161111111 None
23 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 2.1 2 1.9 1.9 2 2.2 2.3 1.9 1.9 1.2 1.2 1.3 1.4 1.3 1.3 1.3 1.4 1.4 - - - - - - 1.2 1.666666667 None
23 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.5 0.4 0.5 0.6 0.5 0.5 0.6 0.6 0.7 0.5 0.6 0.7 0.5 0.6 0.7 0.7 0.6 0.6 0.6 - - - - - 0.4 0.5789473684 None
23 Mar 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC LS/D 10 9.2 8.9 9.2 11 9.9 9.2 LS/D LS/D LS/D 5.8 5.7 5.6 LS/G LS/G LS/G 6.7 - - - - - - 5.6 8.290909091 None
23 Mar 2026 None OKENE TS TR3-45MVA 33KV OKENE 1 FDR 132KV OKENE TS_33KV OKENE FDR_PL_PL AEDC 3.1 3 3 4 4.7 5.8 6 5.2 4.5 LS/D LS/D 0.9 0.9 0.9 0.9 0.9 0.9 1 INST. O/C - - - - - 0.9 2.85625 None
23 Mar 2026 None OKENE TS TR1-60MVA 33KV OKENE 2 FDR 132KV OKENE TS_33KV LOKOJA/OKENE FDR_33KV PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F 5 7.5 7 7.5 LS/D LS/D LS/D LS/D LS/D LS/D - - - - - 5 6.75 None
23 Mar 2026 None OKENE TS TR2-60MVA 33KV OSOSO FDR 132KV OKENE TS_33KV OSOSO FDR_PL_PL AEDC/BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 3.8 4.2 E/F - - - - - 3.8 4 None
23 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV SMART FDR 132KV KEFFI TS_33KV SMART FDR_PL_PL AEDC 2.5 2.4 2.5 2.6 2.7 2.7 2.6 2.9 3.3 4 4.2 3.5 3.5 3.2 3.2 3.6 3.4 3.3 2.8 - - - - - 2.4 3.1 None
23 Mar 2026 None 132KV SULEJA TS TR5- 60MVA 33KV SULEJA FDR 132KV SULEJA TS_33KV SULEJA FDR_PL_PL AEDC 7.4 7.3 7.2 7.1 7.2 I/S I/S 6 8 8.4 8.6 7.05 LS/G LS/G LS/G LS/G LS/G 8 9.25 - - - - - 6 7.625 None
23 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV UKE-MASAKA FDR 132KV KEFFI TS_33KV UKE/MASAKA FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 - - - - - 0.1 0.1 None
23 Mar 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV WATER BOARD FDR 132KV AKWANGA TS_33KV FDR 3 (WATERBOARD FDR)_PL_PL AEDC 2.3 2.4 2.4 2.3 2.3 2.4 2.7 3 3 2.8 2.9 2.9 LS/D LS/D LS/D LS/D LS/D 3.5 3.7 - - - - - 2.3 2.757142857 None
23 Mar 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV WUSE II FDR 132KV KATAMPE 1 TS_33KV WUSE II FDR_PL_PL AEDC 18.7 17.9 17.5 17 16.9 17.7 19.3 23.7 30.3 19.5 25.4 22.3 24.7 24.4 23.2 27.3 26.3 24.5 - - - - - - 16.9 22.03333333 None
23 Mar 2026 None AJAOKUTA TS T1- 30MVA ADOGO — AEDC 0.6 0.6 0.6 0.6 0.8 1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 - - - - - - 0.1 0.3 None
23 Mar 2026 None BIDA TR5-60MVA AGAIE 132KV BIDA TS_33KV AGAIE FDR_PL_PL ABUJA 1.3 1.3 1.3 1.3 L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG - - - - - - 1.3 0.2166666667 None
23 Mar 2026 None KAINJI 132KV TR2- 40MVA AGWARA — BILATERAL E/F E/F E/F E/F E/F E/F E/F E/F E/F DS DS DS DS DS E/F E/F E/F E/F - - - - - - 0 0 None
23 Mar 2026 None B/KEBBI TS TR6-100MVA ALIERO — KADUNA ALIERO TIED TO TAMBUWAL FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
23 Mar 2026 None AJAOKUTA TS T2- 60MVA ANYIGBA — AEDC 0.5 0.5 0.5 0.5 0.5 0.5 0.5 7.7 10.4 0.1 0.2 0.1 0.4 0.4 0.5 9.4 0.5 9.4 - - - - - - 0.1 2.366666667 None
23 Mar 2026 None B/KEBBI TS TR4-60MVA ARGUNGU — KADUNA NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A 6.3 EMR EMR EMR 6.7 9 8.7 8.3 - - - - - - 6.3 1.625 None
23 Mar 2026 None KONTAGORA TR1- 60MVA ARMY BARRACK — ABUJA 0.3 0.1 0.2 0 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0 0.1 0.1 0.1 0 0.3 - - - - - 0 0.09166666667 None
23 Mar 2026 None 330KV AJAOKUTA TS T1- 30MVA ASCO 132KV — TCN 6 6 6 6 6 6 6 6 6 4 4 3 3 4 6 6 4 - - - - - - - 3 5.176470588 None
23 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) AUCHI — BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F - - - - - 0 #DIV/0! None
23 Mar 2026 None BIDA TR2-30MVA Al-Hassin Company — ABUJA 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 - - - - - - 0.02 0.015 None
23 Mar 2026 None BIDA TR5-60MVA Army Barracks fdr 132KV KONTAGORA TS_33KV ARMY BARRACKS FDR_PL_PL ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F LSD LSD 6 6.7 - - - - - - 6 0.5291666667 None
23 Mar 2026 None MINNA TS TRI- 60MVA BIRIGIFDR — ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 1.2 2.5 - - - - - - 1.2 0.1541666667 None
23 Mar 2026 None B/KEBBI TS TR4-60MVA BUNZA — KADUNA BUNZA AND JEGA TIED TO KAMBA/GAYA FEEDER - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
23 Mar 2026 None SOKOTO TR 3 60MVA CCNN — KADUNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - - - - - - 0 0 None
23 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) CEMENT FACTORY — BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.3 0.9 1.2 1.2 1.7 1.8 0.4 1.2 1.4 - - - - - 0.3 1.122222222 None
23 Mar 2026 None AJAOKUTA TS T1- 30MVA CERAMICS — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S - - - - - - 0 #DIV/0! None
23 Mar 2026 None AJAOKUTA TS T2- 60MVA CONFLUENCE — AEDC 8.2 7.9 7.9 8.2 9.5 10.6 0.1 0.1 0.1 0.1 0.1 9.1 9 0.1 0.1 0.1 0.1 0.1 - - - - - - 0.1 3.966666667 None
23 Mar 2026 None BIDA TR5-60MVA DOKO 132KV BIDA TS_33KV DOKO FDR_PL_PL ABUJA 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 2.8 4.5 4.3 4.6 4.2 L/SG L/SG - - - - - - 0.5 1.079166667 None
23 Mar 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA 0.4 0.4 0.4 0.4 0.5 0.7 0.8 0.8 0.7 0.85 0.9 1 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A - - - - - - 0.4 0.3270833333 None
23 Mar 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 10 11 10.4 15 15 16 5 5.4 7 2 2.3 2.3 2.3 E/F E/F E/F E/F 11.7 - - - - - - 2 4.808333333 None
23 Mar 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 5 5 4.3 0.5 6.2 6.3 8 7 0.6 0.7 0.8 8.4 8.6 EMR 0.5 INST. E/F 8 5.8 - - - - - - 0.5 3.154166667 None
23 Mar 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 6 4.4 5.3 5 4.9 5.4 6 6.3 6.2 5.2 6.4 6.4 0.2 0.2 0.3 0.2 0.3 4 - - - - - - 0.2 3.029166667 None
23 Mar 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 3.1 3.2 3.7 3.5 3.5 1.7 0.4 0.4 0.3 0.6 3.6 3.6 1.5 1.35 1.8 1 1 0.9 - - - - - - 0.3 1.464583333 None
23 Mar 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA 0.9 0.9 1 1 1 0.9 0.9 0.9 0.9 0.9 1.8 1.8 1.95 2.1 2.1 E/F E/F 1.1 - - - - - - 0.9 0.8395833333 None
23 Mar 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 1.1 1.1 1.1 1 EF EF 1.6 1.5 2.4 2.4 2.4 2.4 2.4 2.1 1.5 1.7 1.7 1.7 - - - - - - 1 1.170833333 None
23 Mar 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 9.46 10.93 10.89 10.72 10.09 9.78 11.59 10.74 10.85 3.89 11.27 9.58 9.3 9.28 9.1 10.1 10.45 11.19 - - - - - - 3.89 7.467083333 None
23 Mar 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 2.55 2.5 2.55 2.8 2.9 2.75 3.2 3.2 3.35 3.25 3.1 2.75 2.6 2.5 2.5 3.2 3.35 2.6 - - - - - - 2.5 2.152083333 None
23 Mar 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.6 0.6 0.6 0.8 0.7 0.75 0.7 0.7 - - - - - - 0.2 0.3104166667 None
23 Mar 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 1 3 3 3 2 2 4 E/F E/F E/F 0 0.1 0.3 EMR 0.7 5 4.6 4.2 - - - - - - 0 1.370833333 None
23 Mar 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD 7.6 7.4 LSD LSD LSD LSD LSD LSD LSD - - - - - - 7.4 0.625 None
23 Mar 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 2 2 2 2 2 2 3 0.3 0.3 0.3 0.3 0.3 0.3 EMR 0.2 0.3 0.3 0.3 - - - - - - 0.2 0.7458333333 None
23 Mar 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 6.04 5.1 5.96 5.1 5.95 5.93 5.95 5.94 5.97 5.83 5.94 5.93 5.9 5.9 5.9 5.9 5.92 5.91 - - - - - - 5.1 4.377916667 None
23 Mar 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.08 0.09 0.09 0.08 0.09 0.11 0.1 0.09 0.08 0.07 - - - - - - 0.07 0.06 None
23 Mar 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 6.2 5.95 5.15 3.2 3.35 3.8 3.6 6.15 6.8 7.2 9.8 6.8 11.7 7.1 9.9 3.75 8.75 4.05 - - - - - - 3.2 4.71875 None
23 Mar 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
23 Mar 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA LSD LSD LSD O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 4.5 5.6 - - - - - - 4.5 0.4208333333 None
23 Mar 2026 None YAURI TR2-40MVA KOKO — KADUNA DS DS DS DS DS DS DS DS DS 3.7 3.7 DS DS DS DS DS DS DS DS - - - - - 3.7 0.3083333333 None
23 Mar 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA LSD LSD LSD LSD LSD LSD LSD LSD NCL/A NCL/A 4.3 5.6 NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A - - - - - - 4.3 0.4125 None
23 Mar 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA L/SG L/SG 4.1 4.2 4.3 4.6 L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG - - - - - - 4.1 0.7166666667 None
23 Mar 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 2.4 2.3 2.3 2.1 2 2 2.1 0.6 0.6 0.5 1.2 0.6 0.7 0.6 2.8 0.6 2.7 0.6 - - - - - - 0.5 1.1125 None
23 Mar 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0.036 0.04 0.04 0.04 0.04 0.04 0.04 0.035 0 0 0.1 0.1 0 EMR 0 0 0 0 - - - - - - 0 0.02129166667 None
23 Mar 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA 0.4 0.3 0.3 0.3 0.3 0.4 3.1 3.2 0.4 0.4 0.4 0.4 0.4 3.1 3 8.85 NCL/A NCL/A - - - - - - 0.3 1.052083333 None
23 Mar 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG L/SG - - - - - - 0 0 None
23 Mar 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.65 0.65 0.65 0.65 0.6 0.6 0.55 0.55 0.55 0.55 0.65 0.6 0.65 0.7 0.7 0.75 0.75 0.75 - - - - - - 0.55 0.48125 None
23 Mar 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 2.6 2.6 5.2 6.2 6.6 4.2 5.6 7.6 2.6 2.8 2.8 3.8 2.5 NCL/A 2 1.96 3.3 NCL/A - - - - - - 1.96 2.598333333 None
23 Mar 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0 0.01 0 0.01 0.01 0 0.02 0.01 0.01 0.01 0 0.01 0.01 0.01 0.01 0.01 0.01 0 0.01 - - - - - 0 0.00625 None
23 Mar 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 3.8 3.75 3.75 3.65 3.35 1.45 7.2 1.35 2.65 3.25 3.2 3.85 4 3.75 4.5 10 8.85 9.15 - - - - - - 1.35 3.395833333 None
23 Mar 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA 2.7 2.7 2.4 2.5 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 O/C O/C O/C O/C - - - - - - 0.2 0.5125 None
23 Mar 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 0.6 0.6 5 4.9 4.5 4.7 5 5.3 5.4 0.7 1.3 1.5 1.7 1.7 1.8 6.5 6 1.4 - - - - - - 0.6 2.441666667 None
23 Mar 2026 None YAURI TR1-40MVA NGASKI — KADUNA DS DS DS DS DS DS DS 2.1 2.4 DS DS DS DS DS DS DS DS DS DS - - - - - 2.1 0.1875 None
23 Mar 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA 2 2 1.8 1.8 1.8 1.7 1.8 2.6 2.1 3.1 3.3 3.5 3.2 2.8 3.75 8.75 2 2.5 - - - - - - 1.7 2.104166667 None
23 Mar 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC E/F&O/C E/F&O/C E/F&O/C E/F&O/C E/F&O/C E/F&O/C E/F&O/C E/F&O/C E/F&O/C E/F&O/C E/F&O/C 2.1 0.3 0.3 2 LS LS 0.2 - - - - - - 0.2 0.98 None
23 Mar 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 1.2 1.2 3.8 3.8 5.7 1.3 1.1 1.5 2.3 2.3 2.3 1.5 2.5 2.6 2.4 2.1 7.4 1.8 - - - - - - 1.1 1.95 None
23 Mar 2026 None SOKOTO TR1- 40/30MVA P/STATN — KADUNA 9.9 9.2 8.7 8.5 8.2 8.3 11.7 9.7 13.8 11.7 10.4 14.9 14.6 15.1 12.9 8.8 3.7 3.2 - - - - - - 3.2 7.6375 None
23 Mar 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 #DIV/0! None
23 Mar 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.1 0.3 0.3 0.3 0.3 0.1 0.2 0.3 0.4 0.4 0.3 0.2 0.1 0.3 0.3 0.3 0.3 0.1 - - - - - - 0.1 0.2555555556 None
23 Mar 2026 None B/KEBBI TS TR6-100MVA TAMBUWAL — KADUNA 2 2 2 2 2 2 2 E/F E/F E/F 0.3 0.3 0.4 EMR EMR 2 2 1.8 - - - - - - 0.3 0.8666666667 None
23 Mar 2026 None KONTAGORA TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA 5.8 5.7 5.7 5.6 5.8 4.3 5.1 5.1 4.5 5 5 4.9 4.6 2.7 3.8 3.9 3.6 3.7 6 - - - - - 2.7 3.783333333 None
23 Mar 2026 None SOKOTO TR 3 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL KADUNA 5.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 7.5 0.07 - - - - - - 0.07 0.7570833333 None
23 Mar 2026 None BIDA TR5-60MVA Town 11KV fdr — ABUJA LSD LSD LSD LSD LSD 4.2 5.2 5.1 4.8 LSD LSD LSD LSD LSD LSD LSD LSD LSD - - - - - - 4.2 0.8041666667 None
23 Mar 2026 None B/KEBBI TS TR5-60MVA UNIVERSITY — KADUNA 0.155 0.16 0.16 0.16 0.16 0.16 0.16 0.175 0.2 0.2 0.3 0.3 0.3 EMR 0.1 0.2 0.3 0.1 - - - - - - 0.1 0.1370833333 None
23 Mar 2026 None KONTAGORA TR1- 60MVA WATER WORKS 132KV KONTAGORA TS_33KV WATERWORKS FDR_PL_PL ABUJA 0.4 0.3 0.4 0.3 0.4 0.3 0.3 0.4 0.4 0.3 0.4 0.4 0.4 0.4 0.4 0.5 0.4 0.5 0.4 - - - - - 0.3 0.3041666667 None
23 Mar 2026 None SOKOTO TR 3 60MVA YABO — KADUNA 0.2 0.3 0.3 0.2 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 - - - - - - 0.1 0.1458333333 None
23 Mar 2026 None YAURI TR1-40MVA YAURI — KADUNA 3.1 2.9 2.9 2.3 2.5 2.8 DS DS DS DS DS DS DS DS 2.6 3.1 DS DS DS - - - - - 2.3 0.925 None
23 Mar 2026 None MINNA TS TR7- 60MVA ZARUMAI FDR 132KV MINNA TS_33KV ZARUMAI FDR_PL_PL ABUJA 3.1 2.6 E/F E/F E/F E/F E/F E/F E/F 2.9 2.9 4.2 4.8 4.8 4.7 4.6 3.2 3.1 - - - - - - 2.6 1.704166667 None
23 Mar 2026 None YAURI TR1-40MVA ZURU — KADUNA NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A NCL/A DS DS DS 5.9 DS DS DS DS DS DS - - - - - 5.9 0.2458333333 None
22 Mar 2026 None MINNA TS TR4- 15MVA 11KV CHANCHAGA FDR — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 7.5 7.2 7.1 LSD LSD LSD LSD LSD LSD LSD LSD - 7.1 0.9083333333 None
22 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 4.67 3.33 3.33 3.67 3.33 LS/D LS/D LS/D LS/D LS/D LS/D 3.33 3.666 None
22 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC 1.67 1.67 1.67 1.67 1.67 2.17 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 2.37 2.08 1.67 1.67 1.848888889 None
22 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 5 4.83 4.17 LS/D LS/D LS/D 4.17 4.666666667 None
22 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D I/S I/S I/S LS/D LS/D LS/D 0 #DIV/0! None
22 Mar 2026 None MINNA TS TR3- 15MVA 11KV PARLFDR — ABUJA 6 6 5.8 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 8 8 7.5 LSD LSD LSD LSD LSD - 5.8 1.720833333 None
22 Mar 2026 None MINNA TS TR4- 15MVA 11KV SHIROROFDR — ABUJA LSD LSD LSD LSD 3.5 3.5 3.5 3.5 3.5 8 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 3.5 1.0625 None
22 Mar 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC 0.37 0.42 0.37 0.33 0.35 0.4 LS/D LS/D LS/D LS/D 0.37 0.5 0.3 0.53 0.43 0.33 0.3 0.3 LS/D LS/D LS/D LS/D 0.3 0.23 0.23 0.364375 None
22 Mar 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 1.4 1.4 1.3 1.4 1.4 1.5 1.5 1.5 1.7 1.8 1.8 1.7 1.8 1.7 1.8 1.8 1.9 1.9 1.9 1.8 1.8 1.7 1.6 1.4 1.3 1.645833333 None
22 Mar 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 4.1 1.5 4 2.5 1.15 4.5 2.5 5.4 0.05 2 1.65 2 4.7 3.65 4.55 1.8 1.1 4.55 4.85 3.2 5.35 3.4 4.45 5.4 0.05 3.264583333 None
22 Mar 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 2.2 2 1.8 2 1.7 2 2.2 2.6 2.6 2.5 2.2 2.4 1.8 2.4 2.4 2.4 2.3 0.3 2.5 2.6 1.9 2.2 1.8 0.6 0.3 2.058333333 None
22 Mar 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 3.2 3.3 3.4 3.3 3.5 3.4 3.3 3.3 3.3 3.1 3.3 3.3 3.2 3.5 3.5 3.3 3.2 3.3 3.3 3.3 3.3 3.2 3.2 3.2 3.1 3.3 None
22 Mar 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC 19 22.8 22 22.5 22.5 23.75 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 21.5 25.7 19 22.46875 None
22 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.6 0.6 0.6 0.55 0.6 0.6 0.7 0.65 0.6 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.8 0.7 0.8 0.8 0.8 0.8 0.7 0.7 0.55 0.6666666667 None
22 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC 13 11.6 11.2 LS/D LS/D LS/D 12.65 10.7 8 7.9 9.2 10.7 4.8 9.3 11.8 11.7 LS/D LS/D LS/D 15.9 15.4 14.9 LS/D LS/D 4.8 11.171875 None
22 Mar 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC LS/D LS/D LS/D 13.75 13.75 14.7 15.1 14.65 14.2 14.5 12.5 13.5 14.5 15 LS/D LS/D 17.7 19.6 20.2 LS/D LS/D LS/D 16.9 15.8 12.5 15.396875 None
22 Mar 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 I/S I/S I/S I/S I/S I/S I/S 0.4 0.4 None
22 Mar 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 7.1 9.6 9.4 9.4 9.5 15 6.6 11.4 2.4 2.3 2.5 2.6 5.7 2.7 2.5 4.9 4.5 2.5 6.8 6.7 8.3 9.3 8.9 11.1 2.3 6.7375 None
« Previous Page 132 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —