Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
09 Apr 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.1 0.4 0.4 0.4 0.4 0.4 0.1 0.2 0.3 0.3 0.3 0.3 0.1 0.1 0.24999999999999992 None
09 Apr 2026 None B/KEBBI TS TR6-100MVA TAMBUWAL — KADUNA 1.8 1.7 1.7 1.6 1.6 1.8 O/C O/C O/C 0.5 0.5 0.5 2.1 2.7 2.7 2.6 1.1 0.5 0.4 0.6 2.3 2.3 2.3 - 0.4 1.3875000000000002 None
09 Apr 2026 None KONTAGORA TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA 5.7 5.6 5.5 5.5 7.2 8 9.2 9.2 8.3 8.4 8.4 7.8 9.6 9.6 9.6 9.4 O/C 2.5 7.8 7.9 9.7 4.5 5.1 - 2.5 7.05 None
09 Apr 2026 None SOKOTO TR 3 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL KADUNA 0.2 5.1 4.9 4.7 0.4 0.3 0.4 5.2 5.3 5.3 0.1 0.1 6.8 6.9 6.7 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 - 0.1 2.4083333333333337 None
09 Apr 2026 None BIDA TR5-60MVA Town 11KV fdr — ABUJA 5.7 5.7 5.7 5.7 5.7 5.7 LSD LSD LSD LSD LSD LSD LSD LSD 6.7 EMG EMG EMG EMG EMG EMG LSD LSD - 5.7 2.0375 None
09 Apr 2026 None B/KEBBI TS TR5-60MVA UNIVERSITY — KADUNA 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.1 0.2 0.4 0.5 0.6 0.6 0.6 0.5 0.4 0.3 0.2 0.3 0.4 0.4 0.4 1.4 - 0.1 0.39166666666666666 None
09 Apr 2026 None KONTAGORA TR1- 60MVA WATER WORKS 132KV KONTAGORA TS_33KV WATERWORKS FDR_PL_PL ABUJA 0.4 0.4 0.3 0.4 0.4 0.3 0.4 0.3 0.4 0.3 0.4 0.5 0.4 0.4 0.3 0.4 0.4 0.4 0.3 0.4 E/F E/F E/F - 0.3 0.31250000000000006 None
09 Apr 2026 None SOKOTO TR 3 60MVA YABO — KADUNA 0.1 0.1 0.3 0.3 0.3 0.3 2.1 2 6.7 6.8 6.8 6.6 0.1 2 5.1 4.4 5.4 0.2 10.4 10.5 9.5 9.7 10.6 - 0.1 4.591666666666667 None
09 Apr 2026 None YAURI TR1-40MVA YAURI — KADUNA 5.2 5.2 5.1 5.1 5.2 5.2 DS DS DS DS DS 2.8 3.5 0.8 0.6 4.5 0.8 DS DS DS 0.5 0.6 0.6 - 0.5 1.9249999999999998 None
09 Apr 2026 None MINNA TS TR7- 60MVA ZARUMAI FDR 132KV MINNA TS_33KV ZARUMAI FDR_PL_PL ABUJA 6.2 6.3 5.9 5.8 6 2.7 2.7 4 4.2 4.1 3.2 3.4 3.4 3.5 3.4 O/C 3 6.3 6.2 6.3 5.7 6.5 6.2 - 2.7 4.616666666666667 None
09 Apr 2026 None YAURI TR1-40MVA ZURU — KADUNA EF EF EF EF EF EF EF EF EF 0.9 0.9 0.8 0.8 0.7 0.8 0.7 0.6 0.7 0.7 0.7 1.9 5.6 5.4 - 0.6 1.0916666666666668 None
08 Apr 2026 None MINNA TS TR4- 15MVA 11KV CHANCHAGA FDR — ABUJA LSD LSD LSD LSD 5.9 7.2 7.8 7.3 7 7 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5.9 2.029166666666667 None
08 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC 3.33 3.33 3.33 3.33 3.5 4 E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 3.33 3.47 None
08 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D 2.3 2.3 2.25 2.5 LS/D LS/D LS/D LS/D 0.42 LS/D LS/D 2.08 2 2 LS/D LS/D LS/D LS/D 0.42 1.98125 None
08 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC E/F E/F E/F E/F E/F E/F E/F E/F LS/D LS/D 2 3 3 2.83 I/S 2.67 2.67 LS/D LS/D LS/D 2.67 2.67 2.5 2.33 2 2.6340000000000003 None
08 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D I/S I/S I/S I/S E/F I/S I/S LS/D LS/D LS/D I/S I/S I/S I/S 0 nan None
08 Apr 2026 None MINNA TS TR3- 15MVA 11KV PARLFDR — ABUJA 5.9 5.8 6 6.2 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 8.5 7.8 7.1 6.4 - 5.8 2.2375 None
08 Apr 2026 None MINNA TS TR4- 15MVA 11KV SHIROROFDR — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 3.5 3.5 3.3 3.2 3 3 3 3 3.2 LSD LSD LSD LSD - 3 1.1958333333333333 None
08 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.33 0.8 0.5 0.5 0.4 2.83 0.37 0.37 LS/D LS/D LS/D 0.37 0.58 0.33 0.33 0.33 0.6425 None
08 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 0.6 0.5 0.5 0.47 0.6 0.6 0.8 0.9 1.1 1.1 1.2 1.1 1.1 1.2 1.2 1.2 1.9 1.7 1.8 1.8 1.7 1.6 1.5 1.5 0.47 1.1529166666666666 None
08 Apr 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 1.1 5.3 4.4 5.4 3.05 4.4 5.3 5.3 4.1 0.5 0.5 2.5 2.5 4 LS/D 2.55 0.25 3.5 4 0.5 0.5 3 0.5 1.5 0.25 2.8108695652173914 None
08 Apr 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 2.8 2.9 2.8 2.8 0.3 0.2 0.2 0.2 0.2 1.8 2.4 2.5 2.5 LNTRIP 3.6 2.3 2 2.1 2.1 2.2 1.6 0.4 2.2 2 0.2 1.830434782608696 None
08 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 INST. E/F 0.1 0.1 0.1 0.1 0.1 0.1 0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0 0.09565217391304351 None
08 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC 14.8 15.1 14.2 13.8 14.25 15.35 16.9 16.4 16 LS/D LS/D LS/D LS/D LS/D LS/D 24 25.1 24.5 PH/IMBAL LS/D LS/D LS/D LS/D LS/D 13.8 17.53333333333333 None
08 Apr 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.5 0.55 0.5 0.5 0.55 0.55 0.7 0.6 0.55 0.6 0.45 0.6 0.6 0.75 0.4 0.5 0.6 0.65 0.85 0.8 0.7 0.7 0.65 0.6 0.4 0.6020833333333332 None
08 Apr 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC 11.7 10.8 10.4 9.9 10.05 10.2 10.1 9.3 7.2 6.9 8.45 8.3 8.2 8 8 6.8 6.9 7.6 1 1 16.5 14.85 13.8 12.5 1 9.102083333333335 None
08 Apr 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC EMRG EMRG EMRG EMRG EMRG EMRG EMRG EMRG EMRG 17.5 18.25 16.3 15.6 18.6 18 17.5 16.3 16.1 16.7 17.6 16 15.05 16.75 15.8 15.05 16.803333333333335 None
08 Apr 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC I/S I/S I/S I/S I/S I/S 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 I/S I/S I/S I/S I/S I/S 0.4 0.39999999999999997 None
08 Apr 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 9.3 8.8 8.6 8.5 8.7 3.7 E/F 6.5 6.6 6.1 0 5.2 10.8 13.6 13.7 6.8 6.2 3.1 8.4 6.7 6.9 12.4 11.1 10.1 0 7.904347826086956 None
08 Apr 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC 6.1 5.9 5.7 5.7 5.8 5.4 6.7 6.9 7.1 6.2 5.6 6.1 6.3 6.5 6.5 6.9 6.8 7.5 L/S L/S L/S L/S L/S L/S 5.4 6.316666666666666 None
08 Apr 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC 2.7 2.6 2.5 2.6 2.9 3.3 1.9 1.9 1.9 1.8 2 3 0C/EF 1.5 1.6 1.5 1.6 1.5 1.6 1.7 1.6 1.6 1.4 1.3 1.3 2 None
08 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
08 Apr 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 14.6 14.2 14.4 15.7 17.6 23.6 20 17.2 18.3 18 17.7 17.7 INST O/C 22.1 23 23.2 14.3 14.6 14.4 10.3 9.7 9.8 11.7 10.7 9.7 16.208695652173912 None
08 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 4.34 3.71 3.72 3.6 3.8 4 3.6 5.2 4.72 6.82 8.28 7.52 7.76 10.5 7.9 7.7 7.24 6.39 6.46 4.93 7.08 3.6 4.6 4.83 3.6 5.7625 None
08 Apr 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 3.7 3.8 3.3 3.4 3.4 3.7 3.5 3.3 2.7 3.1 13.3 3.4 3.4 3.1 3 P/IMB P/IMB P/IMB P/IMB 4.3 4.2 4.9 3.5 3.3 2.7 4.015000000000001 None
08 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 11.77 9.5 9.28 8.6 8.8 9.4 9.2 13.4 11.88 15.97 15.1 12.35 12.56 18.24 15.9 15.2 14.83 12.98 13.29 11.43 17.87 7.3 10.47 10.86 7.3 12.340833333333336 None
08 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 2.93 2.45 2.4 2.4 2.4 2.7 2.5 4.4 5.29 6.91 7.74 7.16 7.4 10.3 7.4 6.8 6.17 5.47 5.01 3.8 3.95 3.5 2.9 2.73 2.4 4.779583333333334 None
08 Apr 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 6.52 5.49 5.78 4.8 5.8 5.5 6.6 10.7 12.82 15.12 16.53 13.39 14.43 20.51 14.5 14.3 13.06 10.93 9.7 7.83 11.98 3.5 5.85 6.25 3.5 10.07875 None
08 Apr 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 13.1 13.16 12.72 12.5 12.5 13.4 13.2 16.7 18.76 21.76 22.68 20.36 20.97 25.97 19.6 18.8 15.73 10.13 11.68 11.16 17.7 4.7 12.65 15.59 4.7 15.646666666666668 None
08 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
08 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 19.46 15.86 16.4 14.3 14.8 15.6 14.2 15.96 16.48 18.56 19.46 15.43 17.06 12.95 16.6 17.2 16.59 9.87 19.09 19.52 20.23 23 18.07 19.1 9.87 16.907916666666665 None
08 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
08 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 10.6 10 9.6 9.4 9.6 9.9 10.2 9.4 9.2 9 8.5 8.5 6.3 6.5 6.7 4.9 4.9 4.9 9.2 13.8 13.9 LS/G LS/G 12.6 4.9 8.981818181818182 None
08 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 14.6 14.1 7.1 11.3 11.1 11 11 10.6 11.19 8.5 11.1 14.3 14.4 14.5 13.6 14.2 14.7 14.7 17.2 17.4 8.7 18.5 17.7 5.5 5.5 12.791249999999996 None
08 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
08 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
08 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.28 I/S I/S I/S 0.24 0.33 0.39 I/S I/S I/S I/S I/S I/S I/S I/S 0.24 0.31000000000000005 None
08 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.4 1.3 1.3 1.2 1.2 1.2 1.2 1 1.02 0.96 0.97 0.93 0.89 0.93 1 1.02 1.03 0.98 1.21 1.5 1.6 1.62 1.6 1.5 0.89 1.1900000000000002 None
08 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 7.95 7.6 7.35 7.25 7.85 8.85 9.8 11.7 13.1 14.5 14.1 14.45 11.2 SWS SWS 13.55 12.45 10.35 9.1 9.85 9.75 9.45 9 8.6 7.25 10.354545454545452 None
08 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC 3.15 2.95 2.9 2.8 2.85 3 3.7 4.8 SWS SWS 7.95 8.55 10.65 10.45 10.35 9.8 9.65 8 7.8 7.45 BC BC BC BC 2.8 6.488888888888889 None
08 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
08 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H15 132KV APO TS_33KV FDR H15_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10000000000000003 None
08 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H2 132KV APO TS_33KV FDR H2_PL_PL AEDC INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F INST. E/F SG SG 4.9 4.5 4.7 SWS SWS 2.95 2.8 10.35 5.9 5.65 5.65 5.4 5.1 4.85 2.8 5.229166666666667 None
08 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H21 132KV APO TS_33KV FDR H21_PL_PL AEDC 14 12.85 14.85 15.55 15.35 16.05 6.75 14.7 16.4 13.05 8.35 12.1 10.85 SWS SWS 13.6 13.8 18.1 12.7 15.95 15.75 14.8 13.85 12.55 6.75 13.725000000000001 None
08 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H23 132KV APO TS_33KV FDR H23_PL_PL AEDC 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.6 0.6 0.6 SG SG SG SG SG SG 1.6 4.6 9.1 8.6 8.2 8.4 7.8 10 0.4 3.4944444444444445 None
08 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H3 132KV APO TS_33KV FDR H3_PL_PL AEDC INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C INST.E/F O/C 18.4 17.8 17.15 15.9 15 14.15 14.15 16.400000000000002 None
08 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H31 132KV APO TS_33KV FDR H31_PL_PL AEDC 8.7 11 10.75 10.35 10.5 10.7 11.6 10.8 INST.EF/OC INST.EF/OC INST.EF/OC INST.EF/OC INST.EF/OC INST.EF/OC 11 13.2 16.9 16.6 18.4 18.2 17.85 T/L 17.25 15.35 8.7 13.479411764705882 None
08 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F 13.4 21.6 23.65 27 24.95 22.4 13.4 22.166666666666668 None
08 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 5.25 5 4.7 4.55 4.5 4.5 4.55 4.35 0 4.5 4.2 4.2 4.2 4.2 4.2 4.35 4.55 7.45 5.05 4.9 4.6 4.35 9.3 8.15 0 4.816666666666667 None
08 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 5.4 5.2 4.9 4.75 4.65 4.65 4.7 4.25 0 4.2 3.95 3.85 3.85 3.85 3.95 4 4.15 4.3 4.25 4.2 2.8 2.8 2.65 6.7 0 4.083333333333334 None
08 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 14.55 13.8 9.2 9 9.2 14.55 12.45 13.6 9.85 14.8 15.3 15 15.15 14.45 15.15 15.5 14.1 17.05 14.25 13.55 13.65 13 12.7 12.2 9 13.418749999999998 None
08 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC SG SG SG SG SG SG SG SG SG SG SG SG SG SG 1.1 2.3 0.55 2.1 2.15 1.8 2.1 1.9 1.75 1.7 0.55 1.7450000000000003 None
08 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F SG SG E/F 0.5 1.1 0 4.3 EF 11.3 13.7 14.5 14.8 14.7 13.9 10.4 14.3 0 9.458333333333334 None
08 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K2 132KV KARU TS_33KV FDR K2_PL_PL AEDC INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F INST E/F SG SG SG 4.7 3.8 0 INSTE/F 4.7 5 5.1 LS/D LS/D LS/D LS/D INST/OC INST/OC 0 3.883333333333333 None
08 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K3 132KV KARU TS_33KV FDR K3_PL_PL AEDC INST O/C INST O/C INST O/C INST O/C INST O/C INST O/C INST O/C INST O/C SG INST O/C SG INST/OC SG 0 7.6 SWS SWS 7.8 7.5 P/IMB P/IMB P/IMB P/IMB P/IMB 0 5.725 None
08 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K4 132KV KARU TS_33KV FDR K4_PL_PL AEDC 8.1 7.7 7.4 7.3 8 6.5 3.8 7.3 4.1 4.2 1.4 4 SG 0 E/F EF EF SG SG 1.6 4.9 5 4.5 8.7 0 5.25 None
08 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K5 132KV KARU TS_33KV FDR K5_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F SG 0 O/C OC OC SWS SWS INST, EF INST, EF INST, EF INST, EF INST, EF 0 0 None
08 Apr 2026 None 132KV KARU TS TR2- 60MVA 33KV FDR K6 132KV KARU TS_33KV FDR K6_PL_PL AEDC 7.4 7 6.7 6.5 6.8 7.3 7.7 7.7 7.6 7.4 7.2 7.3 7.4 0 INSTE/F 7.9 8.3 LS/D LS/D LS/D LS/D LS/D 10.3 8.8 0 7.183333333333334 None
08 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 12.6 10.8 9.5 8.6 8.5 17.5 17.2 16.1 15.2 14.4 13.6 13.8 INST E/F INST E/F 14.4 14.6 14.8 14.9 14 18.4 1.9 17.5 16.8 16 1.9 13.68636363636364 None
08 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L31 132KV KUKWABA TS_33KV FDR L31_PL_PL AEDC 14.5 13.8 13.38 13.3 13.56 14.6 11.4 9.4 10.2 10.2 10.59 10.7 15.5 15.86 L/SD L/SD L/SD L/SD L/SD L/SD L/SD L/SD 16.48 14.9 9.4 13.023125 None
08 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC 13.3 11.9 11.2 10.6 10.6 11.6 13 E/F 14.7 12.5 INST E/F 12.4 14 13.5 13.5 LS/D 15.7 15.2 16.3 16.7 16.1 14.9 13.9 12.5 10.6 13.528571428571427 None
08 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L32 132KV GWAGWALADA TS_33KV FDR L32_PL_PL AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 2.9 3.3 3.7 11.48 11.99 14 14.4 14.6 13.7 12.66 L/SD L/SD 2.9 10.273 None
08 Apr 2026 None 132KV KUKWABA TS TR1- 60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC 1 1 1 1 1 0.9 0.8 0.9 0.8 0.8 0.8 0.8 0.8 4 3.8 3.9 3.5 3.8 4.5 4.7 5.1 4.8 4.7 4.8 0.8 2.466666666666667 None
08 Apr 2026 None 132KV GWAGWALADA TS TR1-60MVA 33KV FDR L33 132KV KUKWABA TS_33KV FDR L33_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
08 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 10.8 10.3 9.8 9.3 9.3 5.4 5.3 11.1 11.6 12.5 12.2 8.3 12.5 11.2 11.9 11.1 9.8 11.6 13.1 13 13 10.9 12.7 13.3 5.3 10.83333333333333 None
08 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L34 132KV GWAGWALADA TS_33KV FDR L34_PL_PL AEDC 14.1 13.47 12.8 E/F E/F EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC EF/OC 2.56 13.2 13.25 12.7 12.37 8.9 8.66 8.1 7.36 6.9 2.56 10.336153846153847 None
08 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 3.7 4.1 4 3.5 2.5 3.9 3.7 5.9 5.6 5.7 6.1 5.8 5.7 5.5 5.1 4.5 4.4 3.9 5.1 6.2 5.5 5.1 5.2 5.5 2.5 4.841666666666667 None
08 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L35 132KV KUKWABA TS_33KV FDR L35_PL_PL AEDC 3.2 3.1 3.1 3.2 3.3 3.78 3.2 3.3 3.1 I/S I/S I/S I/S I/S I/S I/S I/S I/S 5 4.9 4.55 4.11 3.66 L/SD 3.1 3.6785714285714284 None
08 Apr 2026 None 132KV KUKWABA TS TR2- 60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC 10.8 10.6 10 9.7 9.4 9.4 9.7 14.6 14 14.4 14.3 14.1 13.9 14.3 14.7 6.7 11.3 11.1 12.1 12.6 12.7 12.1 12.8 12.3 6.7 11.983333333333334 None
08 Apr 2026 None 132KV GWAGWALADA TS TR2-60MVA 33KV FDR L36 132KV GWAGWALADA TS_33KV FDR L36_PL_PL AEDC WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP 0 nan None
08 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV FIELD BASE FDR 132KV SULEJA TS_33KV FIELDBASE FDR_PL_PL AEDC 2.7 2.6 2.6 1.5 1.45 1.55 1.4 1 1.45 0.3 0.3 0.3 0.3 0.2 1.2 0.3 0.25 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.852083333333333 None
08 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV GOODA_PLUSTECH FDR 132KV SULEJA TS_33KV GOODA_PLUSTECH FDR_PL_PL AEDC 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 1.55 1.4 1.45 1.45 1.6 O/C 1.55 1.55 1.5 7 7.1 7.3 1.95 1.55 1.25 0.2 1.7521739130434781 None
08 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV GRA FDR 132KV KEFFI TS_33KV GRA FDR_PL_PL AEDC 3.7 3.6 3.6 3.5 3.5 3.9 O/C 4.2 4.2 4.1 4.1 4.3 E/F 0 4.5 4.7 4.6 4.7 5.2 5.2 5 4.7 4.1 4 0 4.0636363636363635 None
08 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV GWARIMPA FDR 132KV KATAMPE 1 TS_33KV GWARINPA FDR_PL_PL AEDC 11.9 11.3 11 10.6 10.1 10.6 10.5 10.6 11.1 11 11 11 10.6 11.2 11.3 E/F 13 12 13.5 14.28 LS/G LS/G 15.2 13.5 10.1 11.679999999999998 None
08 Apr 2026 None OKENE TS TR2-60MVA 33KV IKARE FDR 132KV OKENE TS_33KV IKARE FDR_PL_PL AEDC/BEDC 8.1 7.8 7.8 7.8 8.2 8.8 9.4 9.2 9.5 O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 7.8 8.511111111111111 None
08 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV INDUSTRIAL FDR 132KV SULEJA TS_33KV INDUSTRIAL FDR_PL_PL AEDC 1.45 1.2 1.3 1.3 1.45 1.35 0.95 1.55 1.55 1.7 1.7 1.6 1.6 O/C 4.3 1.4 1.5 1.1 1.1 1.35 1.5 1.5 0.95 1 0.95 1.4956521739130437 None
08 Apr 2026 None OKENE TS TR2-60MVA 33KV ISANLU/MAKUTU FDR 132KV OKENE TS_33KV ISANLU MAKUTU FDR_PL_PL AEDC/BEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 3.9 O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F O/C&E/F 1.6 1.8 2.5 5 O/C&E/F 1.6 2.96 None
08 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV JABI FDR 132KV KATAMPE 1 TS_33KV JABI FDR_PL_PL AEDC 13.2 12.1 11.8 11.4 11.5 12.3 13.5 13.8 14.5 14.5 14 14 14.3 E/F 14.2 SG SG SG SG SG 16 17.2 15.6 14.5 11.4 13.799999999999999 None
08 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV JAHI FDR 132KV KATAMPE 2 TS_33KV JAHI FDR_PL_PL AEDC 14.4 13.4 13.3 13.1 14.7 14.8 15.8 16 16.2 15.8 15.4 14.8 14.8 4.2 4.3 4 4.2 8 18.8 19.5 LS/G LS/G LS/G LS/G 4 12.775000000000002 None
08 Apr 2026 None 132KV SULEJA TS TR5- 60MVA 33KV JERE FDR 132KV SULEJA TS_33KV JERE FDR_PL_PL AEDC INST.EF INST.EF INST.EF INST.EF INST.EF INST.EF INST.EF INST.EF 7.6 7.5 5 5 5 2.5 0.25 2.55 I/S I/S I/S I/S I/S I/S 2.5 2.45 0.25 4.035 None
08 Apr 2026 None 132KV SULEJA TS TR3- 30MVA 33KV JIWA FDR 132KV SULEJA TS_33KV JIWA FDR_PL_PL AEDC 5.35 5.05 4.9 4.9 5 5.55 6.05 6.4 6.2 5.9 6.05 4.75 4.75 4.4 O/C 4.6 6 6.25 LS/D LS/D LS/D LS/D 5.1 5.1 4.4 5.384210526315789 None
08 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV KEFFI FDR 132KV KEFFI TS_33KV KEFFI FDR_PL_PL AEDC 6.7 6.6 6.5 6.5 7 2.4 E/F 2.5 2.5 2.7 7.3 8.8 9.1 0 6.6 2.7 2.7 LS/D LS/D 5.4 3 5.8 4.9 5.6 0 5.014285714285714 None
08 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV KUBWA FDR 132KV KUBWA TS_33KV KUBWA FDR_PL_PL AEDC 5.3 13.4 12.95 12.65 13.1 13.35 13.15 12.7 13.7 13.9 14.1 14.05 4.3 4.5 4.5 4.5 4.5 4.1 15.95 16.2 16.2 13.1 12.45 11.8 4.1 11.018749999999999 None
08 Apr 2026 None 132KV AKWANGA TS TR2- 40/30MVA 33KV LAFIA FDR 132KV AKWANGA TS_33KV FDR 2 (LAFIA FDR)_PL_PL AEDC 2.2 2 1.9 1.9 O/C O/C O/C O/C O/C O/C O/C O/C O/C LNTRIP I/S 0.7 1.5 1.8 2 2.1 1.9 1.8 0.8 0.7 0.7 1.6384615384615384 None
08 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV LIFE CAMP FDR 132KV KATAMPE 1 TS_33KV LIFECAMP FDR_PL_PL AEDC 7.1 6.5 6.4 6.2 6 6 6.1 6 6 6 6 6 0.3 INST. E/F 9.5 9.1 9.2 9.9 12 12.55 12.5 12.3 11.6 11 0.3 8.010869565217392 None
08 Apr 2026 None 132KV KATAMPE-1 TS TR1 - 60MVA 33KV LUGBE FDR — AEDC SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE 0 nan None
08 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MAITAMA FDR 132KV KATAMPE TS_33KV MAITAMA FDR_PL_PL AEDC 0.8 0.7 0.7 0.7 0.9 0.9 0.9 1.1 1.1 1.2 1.2 1.2 1 1 1.1 1 1.1 1 1 1 1 1 0.8 0.8 0.7 0.9666666666666667 None
08 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA 33KV MPAPE FDR 132KV KATAMPE TS_33KV MPAPE FDR_PL_PL AEDC 2 1.9 1.8 1.7 1.5 2 2.1 2.1 2 INST. E/F 1.8 1.8 1.8 1.8 1.8 1.8 1.9 2 2.5 2.7 2.5 2.4 2.2 2 1.5 2.0043478260869567 None
08 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV NASARAWA FDR 132KV KEFFI TS_33KV NASARAWA FDR_PL_PL AEDC 0.5 0.5 0.6 0.5 0.5 0.5 E/F E/F 0.2 0.6 0.6 0.6 0.5 0 0.6 0.6 0.5 0.6 0.6 0.6 0.7 4.2 4.1 3.8 0 0.9954545454545453 None
08 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV NIPP FDR 132KV KUBWA TS_33KV NIPP FDR_PL_PL AEDC 14.2 10.8 10.3 9.95 10.5 10.8 11.3 11.4 4.8 4.8 4.75 4.6 4.6 LS/D LS/D 8.7 8.6 8.6 10.8 6.7 6.8 6.4 5.95 5.7 4.6 8.229545454545454 None
« Previous Page 105 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —