Hourly Load Profile (Unified)
Average Hourly Load Analysis
Multi-select enabled
Attribution Analysis Upload Load Report

Average Hourly Load (MW)

Detailed Hourly Readings
Date Region Substation Transformer (MVA) Feeder MYTO Feeder Disco 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Min Avg Max
10 Apr 2026 None SHIRORO2 TR1- 30MVA ERENA 132KV SHIRORO TS_33KV ERENA FDR_PL_PL ABUJA EMRT EMRT EMRT EMRT EMRT EMRT EMRT EMRT EMRT EMRT 0.6 1 0.9 0.7 0.8 1 1 0.9 0.7 0.6 NCL/A NCL/A NCL/A - 0.6 0.34166666666666673 None
10 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA 2 — KADUNA 17.4 16.6 16.1 6.6 1.7 1.7 1.8 1.8 2 2.1 6.6 12.1 12.3 11.7 7.2 13 13.4 13.1 13.2 2.6 12.8 12.5 11.9 - 1.7 9.245833333333332 None
10 Apr 2026 None B/KEBBI TS TR6-100MVA FADAMA1 — KADUNA 4.7 4.5 4.3 7.4 7.5 0.5 0.6 0.6 0.7 0.8 9.8 9.6 9.7 9.1 8.7 0.7 6.3 6.3 6.1 8.9 8.4 8.4 7.9 - 0.5 5.779166666666666 None
10 Apr 2026 None SOKOTO TR 3 60MVA FARFARU — KADUNA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 5.6 6 6.5 6.2 6.5 6.5 6.2 6.1 5 5 4.6 5 5.1 2.7 4.1 - 0.2 3.7541666666666664 None
10 Apr 2026 None TEGINA TR1- 30MVA FDR1 — KADUNA 3.8 3.8 3.7 3.3 2.9 1.3 0.8 0.3 0.3 0.3 0.3 3.5 3.6 2.6 0.8 1.5 1.6 0.8 0.8 0.3 0.4 4.1 3.5 - 0.3 1.9750000000000003 None
10 Apr 2026 None TEGINA TR1- 30MVA FDR2 — ABUJA L/SD L/SD L/SD L/SD L/SD L/SD 3.1 3.4 1.8 2.5 2.5 2.3 2.3 1.8 3.2 3.3 3.4 3.2 3.2 LSD LSD 2.8 2.8 - 1.8 1.8375000000000001 None
10 Apr 2026 None TEGINA TR1- 30MVA FDR3 — ABUJA 1.9 1.6 1.5 OC OC 2.1 2.4 2.5 2.6 2.5 2.5 2.5 2.6 2.3 2.1 2.6 2.7 2.6 O/C 1.3 1.8 1.7 1.5 - 1.3 1.8625 None
10 Apr 2026 None KAINJI 132KV TR1- 40MVA FEEDER 1 — IBADAN 10.03 9.95 9.74 9.01 9.12 9.93 9.79 11.6 10.65 6.44 5.96 8.84 8.85 9.06 9.53 9.43 9.84 5.47 9.05 6.49 6.7 10.37 9.59 - 5.47 8.9375 None
10 Apr 2026 None KAINJI 132KV TR2- 40MVA FEEDER 6 — IBADAN 3.06 3 2.74 2.89 2.73 2.88 LSD LSD LSD LSD 6.7 6.55 E/F 2.3 3.2 LSD LSD 5 5.5 5.5 EF 2.45 2.3 - 2.3 2.4625 None
10 Apr 2026 None MINNA TS TRI- 60MVA FUT FDR 132KV MINNA TS_33KV FUT FDR_PL_PL ABUJA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 - 0.2 0.22916666666666663 None
10 Apr 2026 None B/KEBBI TS TR4-60MVA GAYA — KADUNA 5.2 4.7 4.5 4.4 5 0 0 4.6 4.8 E/F E/F 2.6 5 4.5 E/F E/F E/F E/F E/F 1.8 E/F E/F 3.6 - 0 2.275 None
10 Apr 2026 None BIDA TR2-30MVA GRA 11kv fdr — ABUJA EMR EMR EMR EMR EMR EMR EMR EMR EMR EMR EMR EMR 7 6.7 6.8 6.5 6 6 LSD LSD LSD LSD LSD - 6 1.625 None
10 Apr 2026 None B/KEBBI TS TR4-60MVA GWANDU — KADUNA 1.6 1.5 1.5 1.4 1.6 2.1 2.3 0.1 0.1 0.1 0.1 0.3 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0.2 - 0.1 0.6666666666666669 None
10 Apr 2026 None KAINJI 132KV TR1- 40MVA HYDROPOLIS 1 — IBADAN 5.94 6.09 6.03 6.09 6.09 6.1 6.03 5.99 5.96 5.9 6.04 5.91 6.02 6 6.11 6.05 6.04 5.99 6.04 6.01 6.16 5.81 6 - 5.81 6.013333333333333 None
10 Apr 2026 None KAINJI 132KV TR2- 40MVA HYDROPOLIS 2 — BILATERAL 0.06 0.07 0.07 0.06 0.06 0.07 0.07 0.08 0.08 0.08 0.08 0.08 0.08 0.09 0.09 0.07 0.07 0.08 0.07 0.07 0.07 0.07 0.06 - 0.06 0.07250000000000002 None
10 Apr 2026 None JEBBA TR1- 30MVA J/Bachita — IBADAN 5.15 5.05 5.65 5.4 5.65 5.65 3.65 4 4.1 3.5 4.15 3.4 4.1 4.25 2.05 3.95 4.45 7 6.4 6.65 6.45 9.7 9.4 - 2.05 5.368750000000001 None
10 Apr 2026 None B/KEBBI TS TR4-60MVA JEGA — KADUNA - - - - - - - - - - - - - - - - - - - - - - - - 0 0 None
10 Apr 2026 None MINNA TS TR2- 30MVA KATEREGI FDR 132KV MINNA TS_33KV KATAREGI FDR_PL_PL ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C 4.1 5.2 5.3 5.5 5.3 4.9 4.4 - 4.1 1.616666666666667 None
10 Apr 2026 None YAURI TR2-40MVA KOKO — KADUNA DS DS DS DS DS DS 2.6 2.6 2.8 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 DS DS DS DS DS DS - 0.1 0.36666666666666653 None
10 Apr 2026 None SHIRORO2 TR1- 30MVA KUTA/GWADA 132KV SHIRORO TS_33KV GWADA FDR_PL_PL ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 4.2 4.4 9 6.6 4.7 4.2 8.4 8.4 7.6 7.3 NCL/A NCL/A NCL/A - 4.2 2.6999999999999997 None
10 Apr 2026 None BIDA TR2-30MVA KUTIGI 132KV BIDA TS_33KV KUTIGI FDR_PL_PL ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 0.9 OC&EF OC&EF OC&EF OC&EF - 0.9 0.0375 None
10 Apr 2026 None SOKOTO TR 3 60MVA KWARE — KADUNA 4.9 4.5 4.9 4.4 4.3 4.4 LSD LSD 0.9 1.2 1.2 1 0.9 0.7 0.7 0.6 0.6 0.7 0.7 0.8 0.9 1 3 - 0.6 1.8708333333333338 None
10 Apr 2026 None B/KEBBI TS TR5-60MVA LABANA — KADUNA 0 0 0 0 0 0 0 0 0 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0.004166666666666667 None
10 Apr 2026 None MINNA TS TRI- 60MVA LAPAI FDR 132KV MINNA TS_33KV LAPAI FDR_PL_PL ABUJA 3.7 3.7 3.5 3.5 EMR D EMR D EMR D EMR D EMR D EMR D EMR D EMR D EMR D EMR D EMR D EMR D 3.2 3.2 O/C 9.5 9.2 LSG/S LSG/S - 3.2 1.6458333333333333 None
10 Apr 2026 None BIDA TR2-30MVA LEMU 132KV BIDA TS_33KV LEMU FDR_PL_PL ABUJA OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF OC&EF 3.9 L/SG 4.7 4.3 - 3.9 0.6999999999999998 None
10 Apr 2026 None JEBBA TR1- 30MVA Life Camp — IBADAN 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.5 0.55 0.5 0.55 0.55 0.55 0.55 0.65 0.55 0.65 0.7 0.8 0.8 0.8 0.75 0.75 - 0.5 0.6125 None
10 Apr 2026 None MINNA TS TR2- 30MVA M/KUNKEL0DR — ABUJA 4.8 4.6 4.5 4.4 4.7 2.9 3 3.2 3 3.2 3.2 3.2 3.2 3.1 1 6 5.7 5.3 5.6 LSG/S LSG/S 3.7 3.5 - 1 3.545833333333334 None
10 Apr 2026 None KONTAGORA TR1- 60MVA MASUGA FDR — ABUJA 0.01 0 0.01 0 0 0.02 0 0.03 0.03 0.05 0.02 0.04 0.04 0.05 0.01 0.02 0.03 0.03 0.01 0.01 0.01 0 0.01 - 0 0.018333333333333337 None
10 Apr 2026 None JEBBA TR1- 30MVA Mokwa — IBADAN 4.85 4.95 4.75 4.2 4.15 4 3.1 4.1 3.9 3.75 6.9 8.2 8.7 8.3 4.3 9.75 8.8 9.15 3.65 4.15 2.8 4.6 4.15 - 2.8 5.408333333333334 None
10 Apr 2026 None BIDA TR5-60MVA NEW AGAIE 132KV BIDA TS_33KV NEW AGAIE FDR_PL_PL ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.05 0.05 E/F E/F - 0.05 0.004166666666666667 None
10 Apr 2026 None SOKOTO TR 3 60MVA NEW INJECTION — KADUNA 5.4 4.2 6.4 5 4.6 5.1 4.2 5.2 5.4 4.5 5.8 6.4 6.4 5.8 5.2 5.5 6 E/F E/F 0.8 0.8 1.1 1.7 - 0.8 4.208333333333333 None
10 Apr 2026 None YAURI TR1-40MVA NGASKI — KADUNA DS DS DS DS DS DS DS DS 1.9 2.9 2.7 DS 2.4 DS DS DS DS DS DS 2.6 2.4 DS DS - 1.9 0.6208333333333333 None
10 Apr 2026 None MINNA TS TRI- 60MVA NNPC/WW FDR 132KV MINNA TS_33KV NNPC FDR_PL_PL ABUJA 2.2 2.2 2.1 2.1 2 2 2 2.3 2.8 3 4 3.7 4.2 4.3 4.4 2.5 2 MTD 2.5 2.7 2.6 2.6 2.9 - 2 2.6625 None
10 Apr 2026 None OKPELLA TS T1(15MVA)&T2(60MVA) OKPELLA TOWN — BEDC 3.2 3.2 3.1 3.1 3.4 3.5 0.2 0.3 0.3 0.3 0.4 0.5 3.7 3.9 3.8 0.5 0.5 0.6 0.3 0.3 0.3 4.3 4.1 3.9 0.2 1.9874999999999996 None
10 Apr 2026 None MINNA TS TR7- 60MVA P/ HOUSE — ABUJA 5.2 5.1 4.9 5 5.4 5.8 6.2 7 2.5 6.1 7.5 6.5 7.1 9.9 10.3 9.3 9.2 9.5 4.3 1.7 1.4 1.3 1.2 - 1.2 5.566666666666666 None
10 Apr 2026 None SOKOTO TR1- 40/30MVA P/STATN — KADUNA 10.3 10 9.2 9.2 9 9.4 9.6 15.3 3.6 4 11.1 11.7 11 10.4 7.9 8.5 4 16 15.7 15.6 18.7 19.6 17.8 - 3.6 11.170833333333333 None
10 Apr 2026 None 132KV KATAMPE-2 TS TR1- 100MVA SPARE-II FDR — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
10 Apr 2026 None AJAOKUTA TS T1- 30MVA STEELPLANT — AEDC 0.1 0.1 0.1 0.2 0.2 0.1 0.2 0.4 0.2 0.2 0.3 0.1 0.3 0.2 0.3 0.2 0.1 0.1 0.1 0.3 0.3 0.3 0.2 0.1 0.1 0.1958333333333333 None
10 Apr 2026 None B/KEBBI TS TR6-100MVA TAMBUWAL — KADUNA 1.9 1.8 1.8 1.7 1.7 1.9 2 E/F E/F 0.5 2.1 2.1 2.8 2.6 1 0.5 0.5 0.5 0.5 1.9 2.2 2.2 2.1 - 0.5 1.5125000000000002 None
10 Apr 2026 None KONTAGORA TR1- 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL ABUJA 7.3 7.2 7 7 6.4 7.5 8.1 7.1 10.3 6.1 5.9 5.7 8.6 7.6 7.9 7.5 4.7 4.7 4.6 4.4 5.8 5.5 4.6 - 4.4 6.4958333333333345 None
10 Apr 2026 None SOKOTO TR 3 60MVA TOWN 132KV KONTAGORA TS_33KV TOWN FDR_PL_PL KADUNA 0.5 0.5 0.5 0.5 7.6 7.8 7.8 5.1 5.2 5.2 0.5 0.5 0.5 0.5 6.9 6.9 6.9 0.6 0.6 0.6 0.6 0.6 0.6 - 0.5 2.816666666666665 None
10 Apr 2026 None BIDA TR5-60MVA Town 11KV fdr — ABUJA O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C LSD LSD LSD 9 9.1 8.8 8.2 8.1 LSD LSD LSD LSD - 8.1 1.8 None
10 Apr 2026 None B/KEBBI TS TR5-60MVA UNIVERSITY — KADUNA 0.4 0.3 0.6 0.3 0 0.3 0.5 0.4 0.3 0.2 0.5 0.5 0.5 0.5 0.3 0.2 0.3 0.2 0..5 0.2 0.5 0.3 0.3 - 0 0.325 None
10 Apr 2026 None KONTAGORA TR1- 60MVA WATER WORKS 132KV KONTAGORA TS_33KV WATERWORKS FDR_PL_PL ABUJA E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 0.5 0.5 0.5 0.5 0.4 0.4 0.3 0.4 0.4 0.5 0.5 0.4 - 0.3 0.23750000000000002 None
10 Apr 2026 None SOKOTO TR 3 60MVA YABO — KADUNA 9.3 8.5 8.7 8.9 4.9 5.4 6.3 5.8 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.2 0.1 4 0.2 0.2 - 0.1 2.6875000000000013 None
10 Apr 2026 None YAURI TR1-40MVA YAURI — KADUNA 6.2 6.2 5.8 5.8 6.1 6.7 0.6 0.7 0.5 0.6 DS DS 0.6 3.9 0.6 0.5 DS DS DS DS DS DS DS - 0.5 1.8666666666666671 None
10 Apr 2026 None MINNA TS TR7- 60MVA ZARUMAI FDR 132KV MINNA TS_33KV ZARUMAI FDR_PL_PL ABUJA 2.6 6.9 6.7 6.7 6.1 6.8 3.3 5.4 6.5 3 3.1 3.1 3.2 3.2 3.1 3.3 3 3.1 3 LSG/S LSG/S 3.3 4.4 - 2.6 3.916666666666666 None
10 Apr 2026 None YAURI TR1-40MVA ZURU — KADUNA 2.3 2.2 4 2.1 2.1 2.4 3 5.3 2 DS DS DS DS DS DS DS DS DS DS DS 0.4 0.6 0.6 - 0.4 1.1500000000000001 None
09 Apr 2026 None MINNA TS TR4- 15MVA 11KV CHANCHAGA FDR — ABUJA 7 6.7 5.6 5.8 6.2 LSD LSD LSD LSD 8 7.7 7.8 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 5.6 2.283333333333333 None
09 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV DIKKO FDR — AEDC E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F E/F 5 4.17 3.67 3.83 3.33 3.33 3.33 3.33 3.8085714285714283 None
09 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV GAURAKA FDR — AEDC LS/D LS/D 1.17 1.17 1.5 1.33 1.67 1.67 1.5 1.33 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 1.17 1.4175 None
09 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV MINNA RD FDR — AEDC 2 1.83 LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 1.83 1.915 None
09 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV NNPC FDR — AEDC I/S I/S LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D LS/D 0 nan None
09 Apr 2026 None MINNA TS TR3- 15MVA 11KV PARLFDR — ABUJA LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD 8.5 9 8.6 7.7 LSD LSD LSD LSD LSD LSD LSD - 7.7 1.4083333333333334 None
09 Apr 2026 None MINNA TS TR4- 15MVA 11KV SHIROROFDR — ABUJA LSD LSD LSD LSD LSD 3.4 3.3 3.3 3.2 LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD LSD - 3.2 0.5499999999999999 None
09 Apr 2026 None 132KV SULEJA TS TR1 - 7.5MVA 132/11KV 11KV WATER WORKS FDR — AEDC 0.25 0.27 0.23 0.25 0.33 0.33 0.33 0.45 0.5 0.92 0.83 0.98 E/F 0.3 0.52 0.6 0.43 0.42 0.43 0.45 0.42 0.42 0.37 0.33 0.23 0.45043478260869557 None
09 Apr 2026 None 132KV KATAMPE-1 TS TR2- 60MVA 33KV 9MOBILE FDR 132KV KATAMPE TS_33KV 9MOBILE FDR_PL_PL AEDC 1.5 1.4 1.4 1.4 1.4 1.5 1.7 1.8 2 2.1 2.1 2.1 2.1 2.1 2.2 1.9 2 1 1.1 1 1 0.9 0.7 0.7 0.7 1.5458333333333336 None
09 Apr 2026 None 132KV SULEJA TS TR2- 45MVA 33KV ABUJA-STEEL FDR 132KV SULEJA TS_33KV ABUJA STEEL FDR_PL_PL AEDC 0.5 0.5 3 0.5 2.55 0.5 2.5 2.5 3 5 0.5 I/S I/S I/S I/S I/S 5 1 3.5 4 4 1 3 I/S 0.5 2.363888888888889 None
09 Apr 2026 None 132KV AKWANGA TS TR1- 40/30MVA 33KV AKWANGA FDR 132KV AKWANGA TS_33KV FDR 1 (AKWANGA FDR)_PL_PL AEDC 1.7 3 2.3 2.8 2.9 3.2 2.7 2.9 2.8 2.6 4.4 4.1 2.5 2.5 2.4 0.2 0.4 2.3 2.5 2.3 0.6 0.6 2.3 2.3 0.2 2.345833333333333 None
09 Apr 2026 None 132KV KEFFI TS TR1- 30MVA OR TR2-60MVA 33KV AVATAR FDR 132KV KEFFI TS_33KV AVATAR FDR_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10000000000000003 None
09 Apr 2026 None 132KV KUBWA TS TR2- 100MVA 33KV BWARI FDR 132KV KUBWA TS_33KV BWARI FDR_PL_PL AEDC LS/D LS/D OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF OC/EF LS/D LS/D LS/D LS/D LS/D 19.4 19.4 19.4 None
09 Apr 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAM FDR 132KV KUBWA TS_33KV DAM FDR_PL_PL AEDC 0.6 0.6 0.6 0.6 0.6 0.6 0.65 0.7 0.6 0.5 0.5 0.5 0.5 0.6 0.5 0.7 0.8 0.8 0.8 0.9 0.8 0.7 0.6 0.6 0.5 0.6395833333333334 None
09 Apr 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DAWAKI FDR 132KV KUBWA TS_33KV DAWAKI FDR_PL_PL AEDC LS/G LS/G 14.8 11.5 10.4 10.4 8.1 7.3 6.9 6.6 6.7 8.8 8.8 8.8 9 8.9 2.9 10.2 11.9 10.95 11.6 11.7 11 12.5 2.9 9.534090909090908 None
09 Apr 2026 None 132KV KUBWA TS TR1- 60MVA 33KV DEIDEI FDR 132KV KUBWA TS_33KV DEIDEI FDR_PL_PL AEDC 15.3 14.8 13.9 13.6 13.8 14.6 14.8 12.1 15.2 15.5 15.1 15.7 16.1 13.6 16.1 11.2 12.2 12.7 13.3 16.1 16 15.4 14.7 LS/D 11.2 14.426086956521738 None
09 Apr 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A1 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A1_PL_PL AEDC i/s i/s i/s i/s i/s i/s 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.4 0.4 I/S I/S E/F I/S I/S I/S I/S I/S 0.4 0.41 None
09 Apr 2026 None 132KV LAFIA TS TR1- 60MVA 33KV FDR A2 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV 33KV FDR A2_PL_PL AEDC 9.1 8.8 8.4 8.3 8 9 10.8 11.7 8.3 12.1 11.2 11.8 12.4 9.7 11.3 8.9 9.9 9.3 11.6 9.7 8.4 8.8 10.9 9.5 8 9.9125 None
09 Apr 2026 None 132KV LAFIA TS TR2- 60MVA 33KV FDR A5 33OKV APIR-LAFIA LINE 1&2_132KV LAFIA TS_33KV FDR A5_PL_PL AEDC 4.3 4.8 4.8 4.7 5 6.1 7.6 7.5 7.2 2.2 2.1 2.1 2.1 2.1 2.2 2.3 2.3 2.3 2.4 2.1 7.7 7.3 6.8 6.2 I/S 4.341666666666667 None
09 Apr 2026 None LOKOJA TS TR2-60MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC 1.2 1.2 1.2 1.2 1.4 1.5 1.4 1.3 1.4 1.4 1.5 1.6 1.5 1.5 1.5 1.6 1.5 1.4 1.6 1.6 1.6 3.1 3.1 3.9 1.2 1.675 None
09 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 1 132KV CENTRAL AREA TS_33KV FDR 1_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Apr 2026 None LOKOJA TS TR2-60MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 10.1 10.1 12.7 18.4 14.4 16.9 10 8.2 8 8.1 8.2 8.6 8.8 7.1 9.3 9.9 9.4 9.5 11.2 10 16 15.1 13.5 14.1 7.1 11.15 None
09 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 2 132KV CENTRAL AREA TS_33KV FDR 2_PL_PL AEDC 5.11 3.8 4.69 4.47 5.4 4 5.7 5.4 7.3 3.29 7.33 10.06 7.26 8.74 8.66 8.28 8.03 6.66 5.18 4.81 5.78 4.52 5.04 4.66 3.29 6.007083333333333 None
09 Apr 2026 None LOKOJA TS TR2-60MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 3.2 3.1 3 3 3 3.3 3.1 3.3 3.9 4.2 4.4 4.8 4.5 5 4.9 4.7 4.3 4.1 4.3 4.7 4.6 4.4 4.1 4.5 3 4.016666666666667 None
09 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 3 132KV CENTRAL AREA TS_33KV FDR 3_PL_PL AEDC 10.99 8.04 9.76 9.16 11.02 8.1 11.8 10.1 13.72 16.51 14.72 19.82 13.73 17.1 11.32 10.59 INST. O/C INST. O/C 0.59 2.43 2.38 1.58 1.68 3.62 0.59 9.48909090909091 None
09 Apr 2026 None 132KV CENTRAL AREA TS TR1 - 100MVA 33KV FDR 4 132KV CENTRAL AREA TS_33KV FDR 4_PL_PL AEDC 2.86 2.11 2.43 2.34 2.83 2.1 1.8 5.9 6.14 7.8 7.13 9.72 6.94 8.59 8.33 8.07 7.65 5.97 2.45 4.2 4.15 2.97 3.35 2.79 1.8 4.942500000000001 None
09 Apr 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 5 132KV CENTRAL AREA TS_33KV FDR 5_PL_PL AEDC 6.44 5.2 5.42 5.69 6.55 4.6 8.1 9.6 13.41 16.37 14.74 19.94 14.19 17.42 16.97 16.08 SG 0.43 8.16 10.13 9.09 5.96 7.45 6.34 0.43 9.925217391304349 None
09 Apr 2026 None 132KV CENTRAL AREA TS TR2- 100MVA 33KV FDR 6 132KV CENTRAL AREA TS_33KV FDR 6_PL_PL AEDC 15.51 11.09 13.33 12.72 15.51 11.9 20.2 13.6 20.47 24.23 20.93 27.18 19.12 23.76 23.67 23.16 21.69 19.44 11.92 12.6 12.17 8.94 10.75 13.95 8.94 16.993333333333336 None
09 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 7 132KV CENTRAL AREA TS_33KV FDR 7_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 8 132KV CENTRAL AREA TS_33KV FDR 8_PL_PL AEDC 19.24 13.81 16.4 15.66 18.42 13.1 19 12.1 16.43 19.16 16.65 21.35 16.86 19.87 19.64 17.64 18.07 19.46 18.94 21.65 23.54 18.13 22.16 18.41 12.1 18.15375 None
09 Apr 2026 None 132KV CENTRAL AREA TS TR3-60MVA 33KV FDR 9 132KV CENTRAL AREA TS_33KV FDR 9_PL_PL AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D1 132KV GIS DAWAKI TS_33KV FDR D1_PL_PL AEDC 11.3 10.4 9.9 9.4 9.5 9.8 10.1 9.5 9.4 9.3 5.3 8.9 9 9.2 9.4 8.7 10.1 8 9.6 LS/G 11.3 10.8 10 9.4 5.3 9.491304347826087 None
09 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D2 132KV GIS DAWAKI TS_33KV FDR D2_PL_PL AEDC 14.5 15 14 13.35 13.2 13.4 13.2 12.9 13.7 14.4 14.4 14.5 14.8 14.8 15 8.9 11.7 11.9 13.7 7.2 12.1 12.8 17 LS/G 7.2 13.323913043478262 None
09 Apr 2026 None 132KV DAWAKI TS TR1 - 60MVA 33KV FDR D3 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D4 — AEDC - - - - - - - - - - - - - - - - - - - - - - - - 0 nan None
09 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D5 — AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.16 0.26 I/S I/S I/S I/S I/S I/S I/S I/S I/S 0.16 0.21000000000000002 None
09 Apr 2026 None 132KV DAWAKI TS TR2- 60MVA 33KV FDR D6 132KV GIS DAWAKI TS_33KV FDR D6_PL_PL AEDC 1.46 1.32 1.28 1.24 1.22 1.16 1.16 1.08 0.95 0.95 0.92 0.95 1 1.06 1.03 1.05 1.08 1.11 1.37 1.5 1.59 1.66 1.67 1.56 0.92 1.2237499999999997 None
09 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H1 132KV APO TS_33KV FDR H1_PL_PL AEDC 8.3 7.95 8 7.9 8.3 9.1 10.15 12.05 9.75 14.5 15.25 13.15 15.45 LS/D LS/D LS/D 12.7 11.15 1.8 10.05 9.85 9.7 8.8 8.95 1.8 10.135714285714286 None
09 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H11 132KV APO TS_33KV FDR H11_PL_PL AEDC BC BC BC BC BC BC BC BC BC BC BC 9 9 10.3 10.25 9.6 9.35 7.9 6.75 7.6 7.35 7.05 6.85 L/S 6.75 8.416666666666666 None
09 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H13 132KV APO TS_33KV FDR H13 (JICA)_PL_PL AEDC I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S I/S 0 nan None
09 Apr 2026 None 132KV APO TS TR1 60MVA 33KV FDR H15 132KV APO TS_33KV FDR H15_PL_PL AEDC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 SWS SWS SWS 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10000000000000002 None
09 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H2 132KV APO TS_33KV FDR H2_PL_PL AEDC 4.6 4.1 4.15 4.05 4 4.15 4.5 4.95 5.5 5.8 6.15 6.3 6.4 6.45 6.4 6.1 5.7 5.5 LS/D 5.2 4.9 4.75 4.75 4.55 4 5.171739130434783 None
09 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H21 132KV APO TS_33KV FDR H21_PL_PL AEDC 11.8 16.35 7.7 7.55 7.8 8.4 8.7 INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F 15.65 16.2 15.4 13.2 10.55 14.6 10.4 LS/D 19.7 18.25 16.2 7.55 12.85 None
09 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H23 132KV APO TS_33KV FDR H23_PL_PL AEDC 9.4 9 9 6 6 6.1 6 6.8 8.4 12.2 12.4 13.2 9 9.2 9.2 S.G S.G S.G 9.6 9.6 9.4 9.4 9 10.8 6 9.033333333333335 None
09 Apr 2026 None 132KV APO TS TR3- 100MVA 33KV FDR H3 132KV APO TS_33KV FDR H3_PL_PL AEDC 13.55 12.85 12.45 10.3 7.4 10.7 8.2 13.25 16.95 16.45 18.2 18.65 18.85 18.75 18.35 16.95 16.05 12.1 11.75 11.15 15.15 14.8 13.6 13.2 7.4 14.152083333333332 None
09 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H31 132KV APO TS_33KV FDR H31_PL_PL AEDC 14.2 13.3 13 12.65 12.45 13.5 14.1 14.1 14.8 15 14.6 14.8 10.1 10.9 6.35 WP WP WP WP 17.05 21.9 15.05 18.35 16.4 6.35 14.129999999999999 None
09 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H33 132KV APO TS_33KV FDR H33_PL_PL AEDC 20.2 18.7 17.65 17 16.55 12.3 18.55 17.95 13.95 10.1 10.6 10.7 10.8 10.95 11 INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F 19.75 10.1 14.796874999999996 None
09 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H35 132KV APO TS_33KV FDR H35_PL_PL AEDC 7.4 6.95 6.65 6.45 6.35 6.7 6.85 6.65 6.75 4.6 4.5 4.5 E E E E E E E E 11 10.45 9.5 8.7 4.5 7.125 None
09 Apr 2026 None 132KV APO TS TR4- 100MVA 33KV FDR H37 132KV APO TS_33KV FDR H37_PL_PL AEDC 5.9 5.4 5.2 5 4.8 4.7 4.6 4.2 4.1 3.85 4.2 4.05 4.25 3 3.75 E WP 4.2 5.65 5.95 6.25 6.2 6.05 5.2 3 4.840909090909092 None
09 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H5 132KV APO TS_33KV FDR H5_PL_PL AEDC 12.65 12 10.95 10.7 11.1 11.85 12.5 13.4 14.9 15.45 16 16.75 14.7 12.5 11.8 12.9 14.65 13.95 14.7 15 LS/D LS/D LS/D LS/D 10.7 13.4225 None
09 Apr 2026 None 132KV APO TS TR2 45MVA 33KV FDR H7 132KV APO TS_33KV FDR H7_PL_PL AEDC 1.5 1.5 1.5 0.65 1.05 0.65 1.3 1.8 1.75 1.9 2.1 2.2 2 2.1 2.4 1.05 2.25 2.2 2.1 2 1.9 1.25 0.03 0.03 0.03 1.5504166666666668 None
09 Apr 2026 None 132KV KARU TS TR1- 100MVA 33KV FDR K1 132KV KARU TS_33KV FDR K1_PL_PL AEDC INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F INST.E/F 12.2 15.4 14.1 14.5 14 LS/D 9.5 LS/D 7 13.5 10.7 10.2 9.3 8.2 7 11.549999999999999 None
« Previous Page 103 of 214 · 21338 readings Next »

Feeder names not matching MYTO

Feeder names on this page that do not correspond to a MYTO feeder name (NERC approved feeder name on the MYTO page). Select the correct MYTO feeder and confirm — the correction is shared by the availability, outage and hourly-load pages.

Source groupFeeder name (raw)Current MYTO feederSelect MYTO feederAction
Hourly Load 11KV CHANCHAGA FDR — —
Hourly Load 11KV DIKKO FDR — —
Hourly Load 11KV GAURAKA FDR — —
Hourly Load 11KV MINNA RD FDR — —
Hourly Load 11KV NNPC FDR — —
Hourly Load 11KV PARLFDR — —
Hourly Load 11KV SHIROROFDR — —
Hourly Load 11KV WATER WORKS FDR — —
Hourly Load 33KV AUCHI FDR — —
Hourly Load 33KV C1 FDR — —
Hourly Load 33KV C2 FDR — —
Hourly Load 33KV C3 FDR — —
Hourly Load 33KV C4 FDR — —
Hourly Load 33KV C5 FDR — —
Hourly Load 33KV C6 FDR — —
Hourly Load 33KV C7 FDR — —
Hourly Load 33KV C8 FDR — —
Hourly Load 33KV C9 FDR — —
Hourly Load 33KV CEMENT FACTORY FDR — —
Hourly Load 33KV CERAMICS FDR — —
Hourly Load 33KV FDR D3 — —
Hourly Load 33KV FDR D4 — —
Hourly Load 33KV FDR D5 — —
Hourly Load 33KV FDR GL33 — —
Hourly Load 33KV FDR GL36 — —
Hourly Load 33KV GANFENG-PENSTOCK FDR — —
Hourly Load 33KV GOODER TECH PLUS FDR — —
Hourly Load 33KV LUGBE FDR — —
Hourly Load 33KV OKPELLA TOWN FDR — —
Hourly Load ADOGO — —
Hourly Load AGWARA — —
Hourly Load ALIERO — —
Hourly Load ANYIGBA — —
Hourly Load ARGUNGU — —
Hourly Load ARMY BARRACK — —
Hourly Load ASCO 132KV — —
Hourly Load AUCHI — —
Hourly Load Al-Hassin Company — —
Hourly Load BIRIGIFDR — —
Hourly Load BUNZA — —
Hourly Load CCNN — —
Hourly Load CEMENT FACTORY — —
Hourly Load CERAMICS — —
Hourly Load CONFLUENCE — —
Hourly Load EVENT — —
Hourly Load Emergency — —
Hourly Load FADAMA 2 — —
Hourly Load FADAMA1 — —
Hourly Load FARFARU — —
Hourly Load FDR1 — —
Hourly Load FDR2 — —
Hourly Load FDR3 — —
Hourly Load FEEDER 1 — —
Hourly Load FEEDER 6 — —
Hourly Load Forced — —
Hourly Load GAYA — —
Hourly Load GRA 11kv fdr — —
Hourly Load GWANDU — —
Hourly Load HYDROPOLIS 1 — —
Hourly Load HYDROPOLIS 2 — —
Hourly Load I — —
Hourly Load I/S — —
Hourly Load J/Bachita — —
Hourly Load JEGA — —
Hourly Load KOKO — —
Hourly Load KWARE — —
Hourly Load LABANA — —
Hourly Load Life Camp — —
Hourly Load M/KUNKEL0DR — —
Hourly Load MASUGA FDR — —
Hourly Load Mokwa — —
Hourly Load NEW INJECTION — —
Hourly Load NGASKI — —
Hourly Load OKPELLA TOWN — —
Hourly Load P/ HOUSE — —
Hourly Load P/STATN — —
Hourly Load SPARE-II FDR — —
Hourly Load STEELPLANT — —
Hourly Load TAMBUWAL — —
Hourly Load Town 11KV fdr — —
Hourly Load UNIVERSITY — —
Hourly Load YABO — —
Hourly Load YAURI — —
Hourly Load ZURU — —